WBA Carrier Wi-Fi Liaison request - March 2014

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0647r1 Submission May 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Advertisements

Doc.: IEEE /0647r0 Submission May 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /0495r1 Submission May 2009 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /1340r0 Submission September 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC–Closing Report- September 2011 Date: 22 September 2011.
Doc.: IEEE /0174r0 Submission January 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: IEEE /1023r0 Submission September 2008 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /1218r0 SubmissionBruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company Address Phone.
Supplementary Plenary Information - July 2010
Supplementary Plenary Information - November 2010
IEEE 802 EC July Motions Date: Authors: Name
November 2008 doc.: IEEE /1437r1 July 2011
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
ETSI Liaison Request November 08
November 2008 doc.: IEEE /1437r1 July 2010
TGn Chairs’ Closing Report Waikoloa, HI 802 Interim – Sep ‘07
CWPAN Opportunity - November 2011
Revision Process Summary
TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08
IMT-Advanced Opening Report
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
Supplementary Plenary Information - July 2010
P802.11z conditional approval report to ExCom
IMT-Advanced – Numerical Justification
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
IEEE Shop Contents Date: Authors: Name Company Address
Energy STAR ad hoc Closing Report - January 2010
Smart Grid ad hoc Closing Report – May 2011
IMT-Advanced Closing Report
TGn Closing Report Vancouver, BC, Canada 802 Plenary
Smart Grid Closing Report – November 2010
Smart Grid Teleconferences – Jan-Mar 2011
TGn Closing Report Taipei, TW 802 Interim –18 Jan ‘08
Supplementary Plenary Information - September 2010
WG Concepts - Mar 12 ‘08 Date: 2008-Mar-12 Authors: Name Company
Smart Grid ad hoc Closing Report - March 2010
Supplementary Plenary Information - May 2010
ETSI Liaison Requests November 08
TGn Closing Report Los Angeles, CA, US 802 Interim
Smart Grid SC–Closing Report- September 2011
Supplementary Plenary Information - September 2010
Smart Grid ad hoc – July – SGIP 2 - NIST PAP2 3- ITU Liaison
Supplementary Plenary Information - September 2009
Smart Grid Update – January 2011
Supplementary Plenary Information - March 2010
IMT-Advanced Opening Report
Candidate Introduction Bruce Kraemer Orlando 802 Plenary –17 Mar ‘08
Supplementary Plenary Information - May 2010
GEN ad hoc Summary - Sep 14 ‘07
TGn Closing Report Vancouver, BC, Canada 802 Plenary
TGn Closing Report Denver, CO, US 802 Plenary – July ‘08
TGn Draft Redline Notice
Smart Grid ad hoc Closing Report – January 2011
Supplementary Plenary Information - September 2009
November 2010, Motions for the EC
Smart Grid Closing Report – November 2010
TGn Closing Report – September 24 ‘09
Smart Grid ad hoc-Closing Report - July 2010
IMT-Advanced Closing Report
Candidate Introduction Bruce Kraemer Orlando 802 Plenary –17 Mar ‘08
Plenary Information - September 2009
January 2012 doc.: IEEE /0179r1 Jan 2012
WG16 IMT Workshop Suggestion
Presentation transcript:

WBA Carrier Wi-Fi Liaison request - March 2014 November 2011 doc.: IEEE 802.11-14/0203r2 March 2014 WBA Carrier Wi-Fi Liaison request - March 2014 Date: 2014- March -19 Authors: Name Company Address Phone email 5488 Marvell Lane, Santa Clara, CA, 95054 +1 (321) 751-3958 Bruce Kraemer Marvell bkraemer@ marvell .com Abstract: Information regarding a call for comment on Carrier Wi-Fi submitted by WBA. Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

March 2014 WBA Liaison WBA has requested comment on its Carrier Wi-Fi (CWLAN) Guidelines.   Background The WBA work on this topic is trying to bring together all parties in the Wi-Fi industry into one vision that defines CWLAN, with the goal of creating a shared industry definition. This will allow the industry to develop a CWLAN ecosystem and subsequently to give the Wi-Fi consumer the best user experience possible at that time and in that location. Next steps and interest to collaborate Following the finalization and publication of version one of the CWLAN Guidelines, the Carrier Wi-Fi team will continue to progress updates for a future version, to include additional functionalities and/or requirements proposed as well as any feedback received to the published version. The Carrier Wi-Fi team has a strong interest in continuing to closely cooperate with industry groups driving related work. The WBA welcomes your feedback to this first version of the CWLAN Guidelines. Bruce Kraemer, Marvell