Scheduling CTC-470.

Slides:



Advertisements
Similar presentations
Precedence Diagramming
Advertisements

WBS: Lowest level OBS: Lowest level
Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Developing a Project Plan CHAPTER SIX Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
CP Chapter 4 Schedule Planning.
Chapter 6: Developing a Project Plan
Project Management from Simple to Complex
Chapter 6 Time Planning & Networks
Richard Fisher 1 The University of Texas at Dallas Project Management BA 4320 Richard Fisher The University of Texas at Dallas.
Developing the Project Plan
Project Management Project Management
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
CSSE Sep.2008 Constructing and Analyzing the Project Network Diagram Chapter 6.
Advanced Project Management - CPH
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
MGMT 483 Week 8 Scheduling.
5/4/20151 NETWORK SCHEDULING TECHNIQUES. 5/4/20152 Network Diagrams  PMI defines the scheduling process as: “the identification of the project objectives.
Dr. Hany Abd Elshakour 5/4/2015 3:55 PM 1. Dr. Hany Abd Elshakour 5/4/2015 3:55 PM 2 Time Planning and Control Activity on Node Network and Precedence.
Scheduling. Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete a project.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Precedence Network Calculations the basic information that should be calculated in the precedence network are: 1) Early activity start (ES) 2) Early activity.
CE 405 – SCHEDULING CRITICAL PATH In order to be an effective Scheduler/ Project Manager – and realizing that you will have too many things demanding your.
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 2 Key CPM Scheduling Terms.
AMERICAN SPORTS BUILDERS ASSOCIATION CRITICAL PATH METHOD SCHEDULING FOR SUCCESS December 6-8, 2008 New Orleans, Louisiana Presented By: Bill Pronevitch.
CEM 510 Construction Planning and Scheduling Detailed Course Outline Dr Soliman Almohawis.
CEM 510 Construction Planning & Scheduling Dr Almohawis
Scheduling CTC-415. Activity Network Development Network Models Activity on Node Precedence Diagram Method Activity on Arrow Network Characteristics Discrete.
Where We Are Now. Where We Are Now Developing the Project Plan The Project Network A flow chart that graphically depicts the sequence, interdependencies,
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
Time Planning and Con trol Precedence Diagram.  Precedence Diagramming  An important extension to the original activity-on-node concept appeared around.
Network Scheduling : Precedence Diagram Method
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.
Scheduling CTC-415. Short Interval Scheduling Plan & manage day to day activities Focus on individual activities Goal Oriented to get activity done Two.
11/9/2015 9:42 AM 1 Project Time Control. 11/9/2015 9:42 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Scheduling. Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete a project.
NETWORK BASED PLANNING METHODS. Planning, What is it? A common mistake: Not involving in the planning process the people who must do the work.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Chapter 4 MIS Project Management Lecturer Sihem Smida Sihem Smida Developing a project plan.
Network planning models These project scheduling techniques model the project's activities and their relationships as a network. In the network, time flows.
IE 366 Chapter 6, Section 10 Project Planning and Scheduling.
Project Management Magister Desain Universitas Komputer Indonesia.
Project Planning and Scheduling
Project scheduling Precedence diagram method & Resource scheduling
Projects: Critical Paths
Developing a Project Plan
Analysing the AoA network
Developing a Project Plan
Project Scheduling: networks, duration estimation, and critical path
Time Planning and Control Precedence Diagram
Project Scheduling: Lagging, Crashing and Activity Networks
Critical Path Method Farrokh Alemi, Ph.D.
BEST VIEWED IN SLIDE SHOW MODE
CEM 510 Construction Planning & Scheduling Dr Almohawis
Project Planning By Phaik San Liew.
Lecture 5: Project Time Planning (Precedence Diagramming Technique)
LECTURE 3.
Exercise – A small building.
Comments: • Illustrates the management functions within a construction company • Planning supports estimating • Planning supports construction Discussion:
Time Planning and Control Precedence Diagram
FACULTY OF ENGINEERING CONSTRUCTION AND BUILDING DEPARTMENT
Presentation transcript:

Scheduling CTC-470

Short Interval Scheduling Plan & manage day to day activities Focus on individual activities Goal Oriented to get activity done Two Categories Look Ahead Production

Look Ahead Scheduling Focuses on what needs to be accomplished during next time period Extract from overall schedule More detailed than overall schedule since looking at day to day activities Must make sure that look ahead schedule matches the overall schedule

Production Scheduling Plan and Schedule one specific activity or group of sub activities related to a particular construction process Good for subcontractor work Types of schedules Date list, Bar Chart, Network Schedule Graphic Schedule, Matrix Schedule, Velocity Diagram

Production Scheduling Date List List of Dates used to plan and manage an activity Difficult to follow without a narrative Figure 9-2 Bar Chart Like a regular bar chart but for sub activities Figure 9-3

Production Scheduling Network Schedule More complicated More info Figure 9-4 Graphic Schedule Easy to read Figure 9-5

Production Scheduling Matrix Schedule Good when identical activities with very similar sub-activities When work is repetitive Figure 9-6 Velocity Diagrams Relationship between time and output Very effective, easy to read Figure 9-7

Precedence Diagram Method Extension of AON Network Allows concurrent activities to overlap Restraints not required to model logical relationships Schedule logic is easier and quicker to develop Easier to modify Better represents work flow in continuous operations

Precedence Diagram Method Disadvantages Need to use finish to start relationships Harder to update and manage due to reduced network detail

Precedence Diagram Method Activity Lead – Lag Lag = time that a following activity is delayed from the start of the previous activity Lead = time that an activity precedes the start or finish of the next activity

Precedence Diagram Method PDM Relationships Finish to Start Like AON when no lag Start to Start Gives a time between the current activity start and when next activity can start Finish to Finish Gives a time between the current activity finish and when next activity can finish

Precedence Diagram Method Calculation Assumption Once work starts it runs until complete Activities are scheduled based on their duration Work is not interrupted or stretched

Precedence Diagram Method Controlling Relationships Forward pass Relationship that results in latest early finish time Backwards pass Relationship that results in earliest late start time

Precedence Diagram Method Forward pass Calculates the earliest time each activity in network can start and finish Minimum project duration Backwards pass Calculate the latest time an activity can start and finish