New page for summary of test status

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

Injection Test Meeting Tuesday 26th August Controls Issues/Results Injection Kickers Etienne CARLIER AB/BT.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Dry Run Summary Week 26: MKQA & AC Dipole Week 27: RF D. Jacquet, M. Gruwe, L. Ponce, E. Veyrunes, xxx, V. Kain, R. Alemany LHC Beam Commissioning.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
Feedback from MEF  Only possible, if COMMON COORDINATION MEETINGS  Main possible conflict: SAFETY –No “work permits” in the injectors. MEF working on.
23/08/20081 RBI.816 Operation First aid on RBI.816 converter control J. Wenninger.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Scrubbing Run: TDI, MKI and MKE interlocks Chiara Bracco, Jan Uythoven ABT/BTP Acknowledgments: T. Baer, M. Barnes, E. Carlier.
LHC Machine Checkout & Dry Runs Strategy Acknowledgements: R.Alemany, R.Giachino M. Albert LHC Beam Operation Workshop June 2014.
Dry runs and cold checkout Markus Albert, Reyes Alemany, Rossano Giachino, Delphine Jacquet, Verena Kain, Belen Salvachua Ferrando, Matteo Solfaroli Camillocci.
LHC OP Tools - Applications (1) o2 new timing users, new dynamic destination oPower converters – settings (for base optics):  Parameters, optics, beam.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
E. Hatziangeli – LHC Beam Commissioning meeting - 3 rd March 2009.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
R. Alemany & V. Kain, 21 st of April ‘09 LHC Dry Run- Week 14 oGoal: run injection and TL BI (fixed displays, logging, applications) plus injection BI,
RF acceleration and transverse damper systems
LHC Beam Commissioning Meeting V. Kain & R. Alemany
Data providers Volume & Type of Analysis Kickers
Beam Interlock System SPS CIBU Connection Review
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
SPS extraction, transfer lines, injection
Summary of week 7 Hardware Commissioning:
Operational Issues L. Ponce.
A/N 26 16:00 Access finished problem with the BLM test. one crate is failing the beam permit test. Fixed. Access required in sector 78 for QPS to fix a.
Monday 11/07: Recovery Plenty of accesses.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
Thursday morning – optics correction
Tuesday 22nd January - morning
Summary of Week 11: 14 – 21 March
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Yesterday Issue of injection kicker not pulsing:
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Thursday 10th May - morning
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Friday 14th December - morning
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Conditions Cool-down of remaining sectors
Planning at 5 o’clock meeting Friday
Wire almost entirely through beam before BLM triggers dump
Friday Morning 7:30 injection for fill 2908
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
LHC dry-runs (BE-BI view)
Monday 14:00 beam dump Access:
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
1v1.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
AC Dipole Control part of Multiturn application
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Another Immortal Fill….
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Thursday 10:00 Fill 1986 in stable beams.
SPS Injection BIS - Draft requirements
Presentation transcript:

New page for summary of test status https://espace.cern.ch/mddb/Systems%20Dry%20Run%20Tests/Home.aspx

Dry Run week 19 Pulse injection kickers in point 2 BIS arming and frequency control (linking, starting) through sequencer Trigger BPMs with pre-pulses Prepulse coming 900 ms too late New LHC mastership scheme New mastership scheme: can become master on spare (remove user request) Logging of transfer lines Independent of user and extraction time (for PCs) Solution for power converter logging will be tested next dry run

FGCs – operational settings Slides by Alick

“Dry run” week 21 - cancelled Extract to TT40 and TT60 Check mastership: extract under LHC master, re-phasing, check pre-pulse Verify that cannot have any dynamic destination when under injection test mode Pulse MKIs (new softstart for MKI 8?) postponed to next week Run collimators through sequencer this week

Dry run week 22 BLM online-check Transfer line logging: new PC logging BPM triggered by pre-pulses BCTs – SMP? Test RF power: Sequencer tasks, status fixed display, application Trim + incoorporate 26th of May: RBAC dry run: Mode: operational/ non-operational PIQUET role

Dry run VI June > week 23 RF low level: All tasks: Load actual settings: gains, voltages, frequencies Load gains, voltages, frequencies Reset F-rev [before first injection] Re-phase [before collisions] All applications ready and settings for operational hyper-cycle available: RF low level application: status of loops, plus possibility to switch loops Injection signals fixed displays available Follow-up issues

Dry run week 26 MKQA AC-Dipole Transverse feedback Follow-up issues All applications: tune, multiturn Timing events Interlocking tests (keys,...) Transverse feedback Application Cleaning Sequencer task Follow-up issues