Gas Systems Requirements for NSTX- U Research Operations 28 August 2012 Peer Review R. Raman, L. Roquemore, W. Blanchard, D. Mueller, V. Soukhanovskii,

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Repaso: Unidad 1 Lección 2
Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
1 ZonicBook/618EZ-Analyst Resonance Testing & Data Recording.
AP STUDY SESSION 2.
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 3 CPUs.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
We need a common denominator to add these fractions.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Rhesy S.ppt proRheo GmbH
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
The 5S numbers game..
Vocabulaire 3.3 Français II. 2 Do you have a gift idea for ___?
Solve Multi-step Equations
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
Advance Nano Device Lab. Fundamentals of Modern VLSI Devices 2 nd Edition Yuan Taur and Tak H.Ning 0 Ch9. Memory Devices.
PP Test Review Sections 6-1 to 6-6
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
25 seconds left…...
Subtraction: Adding UP
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
NSTX-U Gas Systems 18 June 2012 R. Raman, D. Mueller, W. Blanchard, L. Roquemore, P. Sichta.
1Physics Operators Course, PCS Navigation, D.J. Battaglia, September 15, 2015 Devon Battaglia, Keith Erickson, Dennis Mueller, Stefan Gerhardt, Roger Raman,
NSTX-U Gas Systems 18 June 2012 R. Raman, D. Mueller, W. Blanchard, L. Roquemore, P. Sichta.
Presentation transcript:

Gas Systems Requirements for NSTX- U Research Operations 28 August 2012 Peer Review R. Raman, L. Roquemore, W. Blanchard, D. Mueller, V. Soukhanovskii, S.P. Gerhardt 1

2 1) Plasma Fueling – Inductive Plasma start-up: Low field side gas injection (D2) [CD-4] – Inductive H-mode initiations and Ip ramp- up: Center stack gas injection [Ops] – Density control during Li operation: Additional gas injection from LFS & center stack or shoulder gas injection [Ops] 2) CHI Start-up [Research] – Branch 5 gas injection from divertor gap 3) HeGDC – Low field side (LFS) [CD-4] 4) Boronization – Up/down organ pipe locations & LFS [CD-4] 5) Div. heat flux mitigation studies – Localized divertor impurity gas injection at multiple locations [Research] 6) Disruption Mitigation studies – MGI from multiple locations [Research] NSTX-U Plasma Operations Requires Capability for Gas Injection form Multiple Locations

Summary of NSTX / NSTX-U Gas Systems (YR 1) NameNSTXNSTX-U Plasma Fueling Inj 1-PZV [CD-4] Inj 2-PZV [CD-4] Inj-3PZV [CD-4] Bay K Top (89 cc) Bay J Mid-Lo (72cc) Bay J Mid-Up (70cc) Same (Bay K Top) Bay I/J Mid-Lo (Install port) Bay F/G Mid-Lo-Left (Install port) SGI [Research]Bay I Midplane Inj 4a [Ops] Inj 4b [Ops] Inj 5a[Ops] Inj 5b[Ops] CS – Mid (42.5cc) Shoulder (43.9cc) Same CS-2 Shoulder-2 Branch 5 – Single Pulse [Research]Bay K bot (1.3cc)CHI-1 Bay K bot CH-2 Bay G bot (add Tee to CHI Penning gauge port) Diagnostics [Research] Argon –PZV – single pulse GPI – PZV – single pulse Bay-B Lo Flow Bay-B Hi Flow Diruption Mitigation[Research] LDGIS-1 LDGIS-2 LDGIS-3 LDGIS-4/MGI-1 Bay C – AV120 (organ pipe - OP) Bay I – AV121 (OP) Bay F – AV122 (OP) Bay K – AV123 (OP) MGI-1 Bay A 15 deg bot. MGI-2 Bay G 180 deg bot. MGI-3 Bay L 345 deg top MGI-Midplane-4 Bay I/J Mid-Up (Install port) Divertor Studies DivL-1- PZV (YR 1) DivL-2-PZV (~180 degree apart) DivU-1- PZV DivU-2-PZV Bay E bottomBay-E bottom Bay-J bottom TBD Upper dome port to be identified By Lane Roquemore 3 RED: new port location, Green: port to be identified, Black: work in progress

Divertor & MGI Gas Systems Upgrade (YR 2 or later) NameNSTXNSTX-U Divertor Studies YR-2 or later (based on YR-1 results) Lower Divertor (YR 2) DivL-3-PZV DivL-4-PZV Upper Divertor (YR 2) DivU-3-PZV DivU-4-PZV Massive Gas Injection Studies YR-2 or later (based on YR-1 results) MGI-2 Bay K-Mid (Outer Vessel - OV) Ports to ne identified Ports to be identified MGI-5 Bay F Up Horiz. dome (drill hole in div. plate) 4

NSTX-U Gas Injection / Delivery System 5 Injectors in Black and Red are for YR-1 availability. Injectors in Green are for YR-2 or YR-3 availability

NSTX Gas Delivery System 6 SGI & Bay-E (& Argon and GPI) systems use existing gas delivery system controls – So these are a Hybrid of the present 1-4 gas delivery system

7 Examined installation of a single large 6-inch port to support three gas injectors and found the only location identified (Bay F/G Lo) to be unsuitable due to severe interference with the Thomson Scattering system

Ion / Penning Gauge Locations 8 Existing digitizers and cabling can be used, but need to ensure digitizers support 10 sec operations

Reference Plan: Install Four 2-3/4 inch ports (1.5 inch dia. pipe) on the vessel wall Port-1 & 2: Bay I / J Mid-Lo (2 ports at this location for Inj. 2 and MGI-4) Port 3: Bay F / G-Left Mid-Lo (1 ports at this location for Inj. 3) Port 4: Bay B/C - MIG-3 (1 port) MGI-5 mid upper [Bay F upper Horizontal Dome] Port near Turbo pump for MIG-4 (1 port, but not on vacuum vessel) OPTIONAL spares- Install one additional port in Bay F/G- Right-Right & Bay G/F-Up (GPI Upgrade) 9

Number of Gas Delivery Systems Needs to be increased from 4 to 6 System 1 (D2) [Mid-plane GIS] System 2 (He for GDC) System 3 (D2) [Mid-plane GIS] System 4 (D2) as on NSTX [CS & Branch-5 GIS] System 1-H (D2 and impurity gas) SGI & Bay-E Lower System 1-H (3 impurity gases) as on NSTX Argon and GPI System 5 (5000 Torr) for MGI – NEW for YR1 -Will support Divertor Gas Injection system -Improves flexibility by freeing up SGI delivery system System 6 (for new Boronization system) 10 Bill Blanchard to investigate if System 5 and 6 could be combined into a single system

New Boronization (TMB) Gas Delivery System would have additional safety measures Doubly-contained piping Diaphragm or bellows sealed pumps Soft seal valves Flow monitoring or limiting devices Gas cabinets with appropriate purging Automatic monitoring of the secondary eneclosure Installed in test cell 11

Some Scope is with NSTX Operations, and some with the Upgrade Project Upgrade Project Scope: Restore previous operations capabilities – Outer vessel penetrations for replacement valves and gauges [CD-4] – Plumbing to all LFS and CS injectors [CD-4, Ops] – Restoration of at least partial divertor gas injection (single divertor gas injection at bay E as before) [Research] NSTX Operations Scope: Prepare for physics program (in rough priority order) – Additional gas delivery system for boronization – Full divertor gas injection (2 injectors top, two bottom) – Additional gas delivery system for the high pressure impurities (System #5, for MGI and Divertor injection) – Second MGI location in upper horizontal dome port (requires plate modification) Should begin basic engineering assessments of these tasks in order to refine prioritization 12

Appendix 13

EPICS Gas Systems Control Page 14

LDGIS / CS / Branch-5 Gas Systems Control Page 15

Top-Down View of GIS & MIGs 16

Photo of Bay I / J Mid-Lo (Ports 1 & 2) 17 Two gas injection ports removed to provide space for tangential NBI port

Bay I / J Port (Port 2- Partial view as previous photo) 18

Photo of Bay G Mid-Lo (Port 3) 19

MIG-4 Port (Port 4) 20 Outside and inside views

21 MGI-5 Requires Modification to Bay-F Horizontal Dome Port

CHI Brach-5 Injectors 22

Branch 5 Injectors 23 CHI-1 CHI-2 & Penning gauge

CHI-1 Bay K bottom port 24

CHI-2 & Penning gauge Bay G Bottom 25 Install Tee and install both the Penning gauge and a second line for CHI gas injection

Configuration for Divertor Gas Injection 26

Bay-E Lo Vacuum & Air side connection 27

Bay-E DIV-1 gas injection pipe photo 28

Organ Pipe Usage 29

30

Upper / Lower Gas Injection and Spectroscopy Organ Pipes 31

Center Stack & MGI-3 32

MGI 1, 2 & Spectroscopy Ports 33

Neutral Pressure Gauge Locations 34

IG 1, 2 and MGI-4 Locations 35

Penning Gauges PEN-1Bay G_LD (PG1P) PEN-2 Bay K_UP (PG2P) 36

Bay K Top (Penning gauge port) 37

CHI-2 & Penning gauge Bay G Bottom 38 Install Tee and install both the Penning gauge and a second line for CHI gas injection

Plenum Sensotec Requirements 39

CHI/ MGI / Divertor Plenum Sensors (Sensotek) Pressure SensorAvailabilityMax Press (Torr) CHI1-Bay K bot CHI2-Bay G/L YR Gas Delivery System 4) MGI-1 MGI-2 MGI-3 MGI-4 MGI-5 YR (Gas Delivery System 6) DIV1L DIV2L DIV3L DIV4L DIV1U DIV2U DIV3U DIB4U YR-1 YR-2 YR-1 YR (Gas Delivery System 5,6 – YR1 And add 7,8 during YR2) 40

High and Low Field Sensotek Sensors Pressure sensorAvailabilityMax press (Torr) / system # Inj-1a-CS1YR / 4 Inj-1b-CS2YR / 4 Inj-2a-SH1YR / 4 Inj-2b-SH-2YR / 4 Inj-1YR / 1 Inj-2YR / 2 Inj-3YR / 3 GPIYR / 5 ArgonYR / 5 SGIYR / 4 41