Front of building. Mrs Neil (our School Business Manager) visits York to see our new school building.

Slides:



Advertisements
Similar presentations
2012 OLA Library Building Awards Public Libraries
Advertisements

Capital developments at SFX
Classroom 1. Mission San Luis Rey.
Heritage Hall/Rare Book Collection Renovations, 2012.
This is the front of our school. Also it’s the entrance to our office. This is our office where we ring up if we are not coming to school. This is our.
Yate health centre and locality hub development
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Exit Virtual tour of school Llantwit Major Comprehensive School is down Ham Lane East and is right next to the Leisure centre and on the other side is.
Our School ‘{u\eppi Agius’ Primary B Paola. The school façade.
My school! School:Escuela Normal Juan Pascual Pringles Members of the group: Barbara Yuliana Lopez Alcaraz. English Level 3.
Government of the Republic of Montenegro The Ministry of Education and Science Directorate of Public Works SECONDARY SCHOOL OF MEDICINE.
Buckman Heights Elementary School Fire Report Presented by: Mr. Donald Mellema Facilities Manager Greece Central School District.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
How to get from the Nebraska Parking lot to the Mary Graydon Center.
To Find and Open Your Locker.  Your locker will either be in the Upper A Hallway or the D Building Hallway.
SHEPHERD ELEMENTARY SCHOOL PHASE I SHEPHERD ELEMENTARY SCHOOL PHASE I SITE PLAN.
RENOVATION & RESTORATION. New 3 rd Floor Prosecutors Office Existing Attic Space.
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
58 Years of COHR Year 1/2 History School Photos in the Hall 1982 l Old stage in the old hall.
E-twinning : Italy - TurKey Primary School of Edolo Our School Primary School of Edolo Our School.
Schools (2/2) March 22 nd Context Administration facilities Staff facilities Safety and security measures.
Lukovetskaya School Презентация ученицы 10кл. Анциферовой Светланы.
UC Santa Cruz Engineering Building 2 69,000 ASF ~$47M.
Performing Arts Centre By Sarah Reid. Research In my research I looked at lots of picture of top Performing Art Centre's to see what attributes were needed.
SAFETYBRIEFING FOR PHYSICS/ASTROPHYSICS STUDENTS
Why do an Energy Audit? Environmental Impacts Most of the energy used in schools comes from electricity and gas. In 2004 this resulted in the production.
School №1357 We are the pupils of the 7 th form. Our names are: Lopatnikov Oleg, Bulgakov Nikita, Malushitskiy Sasha, Adamov Maxim, Mihaylik Daniil, Klezovich.
Layout as at 1 st July 2007 Public Rooms Offices/Reception Museum Cafe Friends of Museum Shop Physiotherapist Art Exhibition Staff Room Library.
North Augusta High School Design Development Presentation.
Planning For Oakbrook House!. Ground Floor In Oakbrook.
THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.
Meet Buddy the Barsail Bear!
The exterior rebuild is nearly complete. We are about finished with the first fix in the classrooms and toilets. All the flooring, fixtures and fittings.
The History of Center Street School Created by the th grade library class.
SP+a © Sameep Padora and Associates BASERA-E-TABASUM BASERA-E-TABASUM, BEERWAH KASHMIR.
COZYEON Residence Main facilities gallery. Corridor of each floor.
SIZE - Top SERVER ROOM Designed by – openbox |
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
Business Technology Mr. Bernstein Design the Physical Layout November 20, 2013.
DC Office of Cable Television, Film, Music & Entertainment Angie Gates, Director Proposed Transition Marquee Branding.
The New Leavelle McCampbell Middle School Design Development Presentation.
By Amy Hansen. Stage Seating Stage Dressing Room Prop Room Area for relaxing and last minute practicing.
Birds Eye view of the Vidyalaya. Entrance of the Vidyalaya.
Meet Buddy the Barsail Bear!. Our front entrance.
Route 1 Route 2 Route 3 Open Day 2016 Tours Route 4.
“kicking on to the finish”
KENDRIYA VIDYALAYA DUNGARPUR (RAJASTHAN)
CHAPTER 2 Basic House Designs
Diocese of Northampton Scott Tallon Walker Architects
Fire & Evacuation Muster Point
Please keep to Gritted Pathways
A superbly converted Romanic Church built in 1356 in the heart of the medieval city of Beauvais. tp://
Diane Butler Associate Vice President, OIT
Weissman Preservation Center
Our school.
Tuesday 13th January.
Primary Longman Elect 2A Chapter 1 There is Is there …?
Where …? Unit 2 Open Day.
New Gorbals Health and Care Centre
BY HERBER.
I am going to school !.
WES Renovation Update Photo Gallery
What do you expect to learn?
Toilets In ČRG.
Where’s the classroom? It’s on the second floor. 2A : Unit 1.
The New Leavelle McCampbell Middle School
1.
Edmond Doucet Technical High school
Graduate Center for SUNY Cortland
Motherhouse Renovations
Presentation transcript:

Mrs Neil (our School Business Manager) visits York to see our new school building

Front of building

Entrance foyer – looking into school office

School office

Ground floor – library& corridor

Ground floor – central corridor

Ground floor – Heads office + chair/PE store, classroom 3

Ground floor – lightwell & classroom 2/cloakroom

Ground floor – classroom 1

External rear – top (L) and ground (R) floor

Top floor

Top floor – staff room

Top floor – Pupil toilets

Top floor – light wells

Top floor – classroom windows

Top floor – classroom 2 and stairwell