TRANS-SIBERIAN GOLD PLC 26 June 2013 Annual General Meeting TRANS-SIBERIAN GOLD.

Slides:



Advertisements
Similar presentations
Symantec 2010 Windows 7 Migration Global Results.
Advertisements

AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Total: $14,300. Total popcorn sales - $21,628 Pack 7 Commission - $7,569 Scouts on rolls= 86 Scouts sold popcorn= 60 Scouts who: sold $450 or above= 23.
Flexible Budgets, Variances, and Management Control: II
System of energy data compilation in Russia I.Ulyanov, A.Bykov, A.Goncharov Rosstat.
1 Overview of the 2011 Programme Budget Resolution Nicola Virgill-Rolle Alternate Representative Bahamas Chair Working Group on the Draft 2011 Programme.
Regional Policy e-Cohesion – new initiative within IT systems of Member States in Shared Fund Management Common IT System for programming.
Final Report Anton Schrag REGIO D1
Financial Management and Control Annual Meeting of ISPA PARTNERS 2003 Preparation for post-accession Management of Community Funds : Nicholas Martyn Regional.
The ADQ Adventures of LFV by Roger Li, Group Manager AIM 28th of May, Brussels.
Teaching and Learning Science & Assessment Informational Webinars Presenter: Linda Cabe Smith, Science Assessment Specialist Ellen Ebert, Science Director,Teaching.
CALENDAR.
Fiscal Condition of the States Presentation to the Rhode Island House of Representatives Economic Forum December 1, 2009 Arturo Pérez Fiscal Affairs Program.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Number Sense Fractions & Whole.
Chris Millward 26 May A new settlement for higher education ___________________________________________________________________________________________________________________.
Targeting First Gold Dore Q1 2014
1 IEC standards for Equipment used in Environments for Explosive Atmospheres: a tool to enhance safety; business continuity and open international markets.
The 5S numbers game..
Proposed Quintette Mine Re-opening February 2011.
The SCPS Professional Growth System
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
Planning best practice tailings disposal, management and rehabilitation strategies Presented by Mike Gowan.
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
2013 Annual Policing Plan - Q3 Results Edmonton Police Service Presented to the Edmonton Police Commission November 21,
IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
Werner P. Klemens, Head of Exploration CERBA Russia & CIS Mining Conference Toronto, March 9, 2011 Russian Regional and CIS Mining Opportunities – The.
A D I F F E R E N T K I N D O F G O L D C O M P A N Y D I F F E R E N T I S B E T T E R Third Quarter Results 2002 D I F F E R E N T I S B E T T E R Third.
1 Marcus Evans Conferences Greenland and Arctic Mineral Exploration and Exploitation Forum 2 nd & 3 rd November 2011 The Cumberland Hotel, London, UK.
MDG CAMEX INVESTMENT Present Investment $3,000,000 Proposed Investment $5- 10,000,000 Camex MDG Overview Pre-RTO Copper, Gold and silver mining investment.
Disclaimer During the course of this presentation, Stroud Resources Ltd. may make forward-looking statements with regard to the Company’s projects and.
Photo Book: The Deer Trail Mine Story Piute County Utah Q
1 WELL DEFINED. WELL ADVANCED. WELL PLANNED. KRP DEPOSIT: A New Gold Discovery with World Class Potential.
Coal Seam Gas – A Sustainable Australian Energy Source. Mike Moraza | 15 June 2011 | Hunter Environmental Institute.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Capacity Planning Break-Even Point Ardavan Asef-Vaziri Systems and Operations Management College of Business and Economics California State University,
Biology 2 Plant Kingdom Identification Test Review.
Economic Development Update June 18, Project Updates MLBV Corporate & transfer of business assets Forestry Ne-He-Thow Store Paskwawakihk Store Sawmill/log.
Brodie Consulting Ltd. 1 RECLAMATION SECURITY ESTIMATES MANDATE: MANDATE: Estimate the cost of reclamation assuming that it becomes necessary for the government.
1 ASX Listing Rule Amendments – Reporting Requirements for Mining Companies and the JORC Code 2012 ASX Presentation 2013.
Facebook Pages 101: Your Organization’s Foothold on the Social Web A Volunteer Leader Webinar Sponsored by CACO December 1, 2010 Andrew Gossen, Senior.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
University of Aberdeen Superannuation & Life Assurance Scheme (UASLAS) Funding and Investment 11 June 2013.
Product Stewardship (Televisions and Computers) Regulations
Murray River Project Update Coal Forum October 2013.
Employment Ontario Program Updates EO Leadership Summit – May 13, 2013 Barb Simmons, MTCU.
This Programme is funded by the European Union PPRD East Programme – a Flagship Initiative of Eastern Partnership Man-Made & Industrial Disasters Environmental.
FISCAL YEAR Finance/IT Department Budget Presentation.
Static Equilibrium; Elasticity and Fracture
Solanco School District Preliminary Budget April 28, 2014.
Fourth Quarter Oklahoma Data (October-December 2011)
Employment Ontario Literacy and Basic Skills Performance Management Reports Training For Service Providers.
Assigned Exercises & Problems, Ch 13: Budgeting
Improving Outcomes for Learners Post 16 Patrick Leeson Corporate Director.
Auditing, Assurance and Governance in Local Government
SMART GOALS APS TEACHER EVALUATION. AGENDA Purpose Balancing Realism and Rigor Progress Based Goals Three Types of Goals Avoiding Averages Goal.
K+S Group K+S Entsorgung GmbH Deposit of high toxic waste in underground storages and underground reutilisations of the K+S AG Belgrade, Serbia,
Presented to: By: Date: Federal Aviation Administration FAA Safety Team FAASafety.gov AMT Awards Program Sun ‘n Fun Bryan Neville, FAASTeam April 21, 2009.
TRANS-SIBERIAN GOLD PLC 30 June 2014 Annual General Meeting TRANS-SIBERIAN GOLD.
SCREEN PANEL MANAGEMENT
district development Tanzania – Lake Victoria Greenstone Belt.
TRANS-SIBERIAN GOLD PLC 29 June 2015 Annual General Meeting TRANS-SIBERIAN GOLD.
By: Jose, Marlon and Trevone. Mining is important for many reasons: - Canada is third in the world for mineral production. - Canada doesn’t have a use.
Agnico-Eagle Mines Limited1. 2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces.
Amrit Prakash Jonko 08MN23.  A method of mining whereby high value ore is mined in such a manner as to make the low-grade ore left in the mine incapable.
0 Mining Methods Block 150 Level 330 Level 300 Level 270.
TRANS-SIBERIAN GOLD PLC 30 June 2016 Annual General Meeting TRANS-SIBERIAN GOLD.
TRANS-SIBERIAN GOLD PLC Annual General Meeting
GREENHILLS PORTUGAL LDA
عضو هیات علمی گروه بهداشت حرفه ای . دانشکده بهداشت
Principal Projects - Mexico
Presentation transcript:

TRANS-SIBERIAN GOLD PLC 26 June 2013 Annual General Meeting TRANS-SIBERIAN GOLD

ASACHA – Underground Mine Q April 2013 May 2013 YTD 2013 Mine development (metres) 3,4814, Ore extracted (tonnes) 34,537127,64645,35216,28916,12177,762 TRANS-SIBERIAN GOLD

ASACHA Processing plant Q April 2013 May 2013 YTD 2013 Ore processed (tonnes) 30,308136,15435,58510,00614,23559,826 Gold grade (g/t) Silver grade (g/t) Gold recovery (%) Silver recovery (%) Gold in dore (oz) 7,83327,9206,8262,0252,62111,472 Silver in dore (oz) 8,59635,9248,7912,4123,16814,371

ASACHA Refining and sales Q April 2013 May 2013 YTD 2013 Gold refined (oz) 6,53927,5886,8331,5782,74811,159 Silver refined (oz) 7,18935,1108,8652,1063,24514,216 Gold sales US$mill Silver sales US$mill TRANS-SIBERIAN GOLD

JORC Resource Estimate following 2012 Asacha exploration programme 11,000 metres drilled on Asachas flanks in 2012 Asacha JORC resource update adds 321,000 oz. gold and 703,000 oz silver, net of 2011 and 2012 production (252,000 oz. of gold and 395,000 oz. of silver in Asachas Eastern zone identified in 2012) TRANS-SIBERIAN GOLD

JORC Resource as at 31 December 2012 PROPERTY MEASURED + INDICATED Oz MEASURED, INDICATED & INFERRED Oz GRADE g/t (Au equiv.) CUT-OFF g/t Asacha748,1001,070, Rodnikova166, , TOTALS914,5501,475,145--

Asacha mine Daily output of tonnes of ore ensures continuous operation of the plant Processing plant throughput is close to the designed 12,500 tonnes of ore per month Major issue of concern – low grades and high dilution

2012 major issue of concern: low grades and high dilution – fractured and fragile enclosing rocks in blocks close to surface – design disadvantages: long hole blasting inappropriate for some parts of the mine blasting scheme unsuitable for some blocks – shortcomings in earlier mine development: advanced block preparation inadequate and timely supporting – lack of underground machines – lack of experienced personnel TRANS-SIBERIAN GOLD

Measures taken following 2012 technical audit New technical and managing staff – Technical director and Chief mine geologist, each with around 30 year practical experience Measures to keep mining blocks integrity – minimise time lag between preparation of mining blocks and subsequent stoping – use rock drifts when preparing blocks for stoping Measures to reduce dilution - short blocks stoping, recoverable protective pillars and supporting concrete pillars/ceilings, where appropriate - changes in blasting scheme, including drilling blasting holes parallel to the ore body, shallow blast- hole blasting where appropriate, less brisant explosives and drilling blasting holes with smaller diameters - smaller machines (scrapers and LHD) - stricter control on ore blasting and haulage to reduce volume of ore stored underground Optimisation of work shifts More attention to ore sampling, stockpiling and blending VNIPI design institute to revisit Asacha in near future The aim – to achieve 8 g/t gold grade by the end of 2013 and 9 g/t by mid 2014

New underground machines BU-80 rig with smaller diameter (65-75 mm instead of 105 mm) Two underground LHD : Fambition FAML-3 and Atlas Copco ST2D Underground truck Fambition FAMT-12T TRANS-SIBERIAN GOLD

Asacha mine in operation (1)

Asacha mine in operation (2) TRANS-SIBERIAN GOLD

Construction continued at site Post start-up major activities Mine site: Main fan is constructed, testing with participation of the manufacturer is planned. Plant: Ready for commissioning. Documentation in progress. Tailings storage facility: In operation. Documentation for commissioning in progress. TRANS-SIBERIAN GOLD Key facilities already commissioned: Cyanide storage Explosives storage Power unit and power supply system The camp

Rodnikova Deposit Federal authorities prescribed the implementation by April 2014 of two provisions of the Licensing Agreement: – Finalisation of the design documentation – Commencement of work at the deposit The pre-feasibility study will be finalised in 2013 TRANS-SIBERIAN GOLD