12 and 13 February 2013 WELCOME TO THE SESAR LIVE SWIM DEMONSTRATION.

Slides:



Advertisements
Similar presentations
Future Communications Infrastructure – An update
Advertisements

Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
P AIRPORT SURFACE DATALINK ICAO WG-S 3 ICAO Montreal, 09/07/2013.
AIS-AIM SG - #4 Agenda item 4.1 Integration with other services - SWIM
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
14/05/2008 Brussels, AP4 Workshop SWIM-SUIT Giuliano dAuria SELEX Sistemi Integrati.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
19/09/2007 Belfast, AIAA Conference SWIM-SUIT Giuliano dAuria SELEX Sistemi Integrati.
Mission Trajectory Step 1 From planning to deployment.
NM USER FORUM 2014 Etienne De Muelenaere Network Strategy & Development 30 January 2014 NM 2014/2015 functional improvements.
SWIM Registry Pedro Fernandez. SWIM Definition Infrastructure Information SWIM consists of standards, infrastructure and governance enabling the management.
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
Service Development for Newbies and Experts
FIXM Breakout Introduction
ICAO: Global Harmonization Plan
Information Management Panel Update
Information Management – where next? Ken Reid Head of International Technical Relations EUROCONTROL.
GAMMA Overview. Key Data Grant Agreement n° Starting date: 1 st September 2013 Duration: 48 months (end date 31 st August 2017) Total Budget:
Delivering Digital Services Global SWIM Demos Presented By: Wim POST SESAR JU Date:August 28,
June 2014 Jan Van Meenen 1 SWIM Standards. SWIM Definition 2 SWIM standards infrastructure Governance ATM Information Qualified parties Services SESAR.
Delivering Digital Services Global SWIM Demos ICAO AIS-AIMSG/11, Montreal – 1 May 2015 Presented By: Paul BOSMAN Head of SWIM/EA Unit.
Delivering Digital Services Aeronautical Information Services in Europe Presented By: Eduard Porosnicu, EUROCONTROL Date:August 26, 2014.
Sam Van der Stricht Eurocontrol
Delivering Digital Services WP6 – SESAR SWIM State of Play ICAO IMP-# January 2015 Presented By: Paul BOSMAN Head SWIM/Architecture.
Delivering Digital Services SESAR AIRM Status Report Presented By: Hubert LEPORI EUROCONTROL Date:August 26, 2014.
SWIM Concept Demonstrations Part 1 Registry – Live Demonstration SWIM Master Class 2013 Pedro Fernandez Sancho Eurocontrol.
Concept of Operations Governance - Registry
Integrating information towards Digital ATM Mini Global Demonstration Presented By: Thien Ngo Date:August 28, 2013.
EUROCONTROL Digital NOTAM Project
SESAR Single European Sky Air traffic management Research
European Organisation for the Safety of Air Navigation Initial steps towards digital AIM : D-AIM AIXM5 User group Meeting Washington DC 27 February 2007.
David Bowen Head of ATM Operations and Systems
09/12/2009 SWIM-SUIT User Forum, Rome SWIM-SUIT Project Overview Giuliano d’Auria SELEX Sistemi Integrati Project Coordinator.
European view on Global developments
24-25 June 2010 SWIM-SUIT Final User Forum, Rome SWIM-SUIT Final User Forum.
Integrating information towards Digital ATM FAA/SESAR Coordination on Data Modelling Presented By: Paul Jackson Date:August 27, 2013.
Delivering Digital Services SESAR /… IM Status Presented By: Paul BOSMAN Date:August 26, 2014.
1 The model of integrated use of information for provision of aircraft flights Completed by: Kolosok A. Supervisor: Luppo O.E. Модель інтегративного використання.
SESAR State of the Art – Civil RPAS Insertion in the European Aviation System 3 rd Workshop on European Unmanned Maritime Systems FÓRUM DO MAR Porto, May.
The global voice of ATM The Global Voice of ATM CANSO AIM WG Activities Agenda Item - 5: Global strategy/roadmap ICAO AIS-AIM SG3, Montreal, November.
The European Organisation for the Safety of Air Navigation AIXM 5.1 Seminar Introduction.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
How the NextGen Florida Test Bed could enable integration of Domestic and International Space Traffic airspace.
CANSO AIM WG Activities
FIXM briefing for the AIXM CCB Hubert LEPORI EUROCONTROL, ATM/STR/SWM
International Federation of Air Traffic Safety Electronics Associations PCP and CP2 by Robert Schneebuaer IFATSEA Ambassador.
RACOON Project Daniele Teotino - ENAV RACOON Project Manager
ESA Iris Programme: status
AIS-AIM SG - #4 Agenda item 4.1 Integration with other services - SWIM
Welcome to the SESAR SWIM Master Class 2013
System Wide Information Management
THE THIRD REFERENCE PERIOD (RP3) & EMERGING CHALENGES
Workshop on preparations for ANConf/12 − ASBU methodology
Mini Global Demonstration
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
AIXM 5.1 – Interoperability issues
Future Communications Infrastructure – An update
AIXM 5.1 – Interoperability issues
Recommending a Strategy
System Wide Information Management
Who are we? Snowflake Software Inc … … The Data Exchange Company
ICAO AIS-AIMSG/11, Montreal – 1 May 2015
ICB -TSG 42 MEETING 9 February 2016
P. Cruellas EUROCONTROL DSR SWIM/EA Unit
P AIRPORT SURFACE DATALINK
AIXM 5.1 – Interoperability issues
ERAU NextGen Florida Test Bed (FTB)
AIXM 5.1 – Interoperability issues
Presentation transcript:

12 and 13 February 2013 WELCOME TO THE SESAR LIVE SWIM DEMONSTRATION

Lets have a look at Facebook

Access to facebook wifi Gsm cellphone Gsm cellphone Cable/ ADSL Browser x Browser y App A App B Service definition information model Standard protocols

12 and 13 February 2013 WELCOME TO THE SESAR LIVE SWIM DEMONSTRATION

Contributing SESAR members

Agenda Introduction to SWIMLive demonstrationQuestions and answersFree walk around

What defines SWIM SWIM standards infrastructure Governance ATM Information Qualified parties Services

SWIM Definition SWIM consists of standards, infrastructure and governance enabling the management of ATM information and its exchange between qualified parties via interoperable services.

AIS VAMC NATS MUAC KUAC Hamburg Airport Milano Airport VAMC Gateway NORACON Reins ACC AOC NOP TWR RMAN IWIS APOC Bremen Airport TWR RMAN APOC DMAN NOTAM Roma ACC 4DWC IWISNOTAM TWR 2 active Flights 2 planned Flights Airspace closureAirport closureSNOW reduces capacity VAMC Meteo France SNOW reduces capacity A very bad day

Bremen Airport TWR RMAN APOC NOTAM BREMEN TWR (FREQ) TWR (INDRA) RMAN (SELEX/INDRA) APOC (INDRA) 4DWC (THALES) IWIS (THALES) AIS (THALES) D-NOTAM (THALES - airport-closure) D-NOTAM (FREQ. - new-obstacle) AIS NOTAM 4DWC IWIS TWR

MILANO MALPENSA DMAN (SELEX) TWR (SELEX) RMAN (SELEX/INDRA) APOC (INDRA) IWIS (SELEX) D-NOTAM (IDS - airspace-closure) Milano Airport TWR RMAN IWIS APOC DMAN NOTAM

The scenario The next slide will be shown in between video shots where necessary

AIS VAMC NATS MUAC KUAC Hamburg Airport Milano Airport VAMC Gateway NORACON Reins ACC AOC NOP TWR RMAN IWIS APOC Bremen Airport TWR RMAN APOC DMAN NOTAM Roma ACC 4DWC IWISNOTAM TWR 2 active Flights 2 planned Flights VAMC Meteo France

And then we have a real problem

AIS VAMC NATS MUAC KUAC Hamburg Airport Milano Airport VAMC Gateway NORACON Reins ACC AOC NOP TWR RMAN IWIS APOC Bremen Airport TWR RMAN APOC DMAN NOTAM Roma ACC 4DWC IWISNOTAM TWR 2 active Flights 2 planned Flights Airspace closureAirport closureSNOW reduces capacity VAMC Meteo France SNOW reduces capacity

What have you seen? SWIM live Demo SWIM Technical infrastructure prototypes AIRM ISRM Registry ATM system prototypes & live system

Whats next with SWIM in SESAR? Governance Test SWIM compliance framework Use prototype Registry prototype governance in the Programme Services Identify and define further services Implement in prototypes Validate Information Extend and evolve AIRM Coordinate common global model Extend and evolve physical models (AIXM, WXXM, FIXM,..) Infrastructure Prototypes for ground systems Prototypes for airborne use End-to-end security Standards Refine information model standard Refine service model standard Infrastructure technology profiles Move to deployment

Questions (and answers )

Walk around to see the systems and talk to the experts

Thank you ! Please come and visit us at: Or contact us at