Airport Obstruction Issues GAA Workshop March 14 th, 2014 Presented by: Alan Hood, Georgia Department of Transportation Airport Safety Data Program Manager.

Slides:



Advertisements
Similar presentations
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200.
Advertisements

$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500.
Who Wants To Be A Millionaire?
Welcome to Who Wants to be a Millionaire
Who Wants to be a Millionaire? Adapted from TCEA 2002
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
County of Fairfax, Virginia Department of Transportation Proposed Transportation Funding Policy Changes Fairfax County Department of Transportation March.
Course Schedule three Assessment Scenarios Discussion Groups Discussion Groups.
Operations of Polynomials
Welcome to Who Wants to be a Millionaire
Editing Instructions Simply add a question and 4 possible answers by overtyping the white text. The green box on the next slide shows which answer should.
Who Wants To Be A Millionaire? Mrs Mances Edition.
Who Wants To Be A Millionaire?
Who Wants To Be A Millionaire? Year 3 What does it weigh?
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
Welcome to Who Wants to be a Millionaire
Applicable for Persons Registered under Article 10
Grants 3.0 Departmental Administrator Review January 22, 2014.
1 s Share 2 s Share 3 s Share settles with 1 for $200,000 (the limit of 1 s insurance policy) settles with 1 for $700,000 Fault allocation: =0%, 1 =50%,
AeroMetric, Inc. Presents: An Airports GIS Lecture Series
Promotion and Tenure Workshop 1. Evaluation Procedure There is only one evaluation procedure leading to recommendations regarding promotion, tenure and.
Smart Card System Training The New York City Department of Education Office of Auditor General The New York City Department of Education Office of Auditor.
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
Individual and Family Support Program
Presenter Todd G. Johnson, Airport Solutions Specialist September 14, 2012.
Airports And ATC Written for the Notre Dame Pilot Initiative
Colorado Springs Airport
Presented to: By: Date: Federal Aviation Administration Safety Management System (SMS) at Airports : Principles APEC TPT-WG AEG-SAF Jim White, Deputy Director.
RUNWAY 28 EXTENSION Stakeholders Meeting April 17, 2013.
Instrument Approach Charts
29 th Annual Airports Conference Hershey, PA Kenneth Jacobs FAA Airport Engineering Division March 1, 2006 Federal Aviation Administration Runway Safety.
$ TOTAL INCOME 100 Quick Start 4 Within 30 Days of Start Date.
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
Equal or Not. Equal or Not
Slippery Slope
By Lia Servidio and Kelly Lively
Partial Products. Category 1 1 x 3-digit problems.
Federal Aviation Administration Airport 20 to 1 Approach Surface Georgia Airports Association (GAA) Annual Workshop Cindy M Hintz Eastern Flight Procedures.
ADO 1 Office of Airports Airport Geometrics Airports Division, Western Pacific Region.
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
 One of the 12 items that must be included in the Customer Service Plan as required by 14 CFR  Also a separate regulatory requirement under 14.
Spring Workshop Georgia Airports Association
Jeff Brown, Chief, Office of Airports September 12, 2014 Caltrans Division of Aeronautics.
Runway & Taxiway Markings
Airport Obstruction Issues And ASM GAA Workshop February 25, 2015 Presented by: Alan Hood, Georgia Department of Transportation Airport Safety Data Program.
Presented to: By: Date: Federal Aviation Administration What’s New at the Flight Procedures Office Pennsylvania Airports Conference Jerry Lebar March 2,
Hershey Conference March 2008 Federal Aviation Administration 0 Hershey Conference March 2008 Federal Aviation Administration 0 Conducting Studies For.
WHAT AIRPORT MANAGERS NEED TO KNOW ABOUT TERPS Association of California Airports Lake Tahoe, California September 10, 2014 QED Airport & Aviation Consultants.
Federal Aviation Administration Airport 20 to 1 Approach Surface Oklahoma Airport Operators Association, (OAOA)/ American Association of Airport Engineers,
Federal Aviation Administration Airport 20 to 1 Approach Surface & Restoring Night Minimums Georgia Airports Association (GAA) 2015 Annual Workshop Cindy.
Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Federal Aviation Administration.
By: FAASTeam Federal Aviation Administration Land and Hold Short Operations (LAHSO)
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
State Safety Inspections and Sponsor Expectations.
Airport FAA 5010 Safety Inspections What does that mean???? Inspectors are responsible for reporting accurate information about all landing facilities.
2015 GDOT PowerPoint Title Page Sub Titles Body Text Obstruction Evaluation “What are all these surfaces?” GAA Spring Conference February 19, 2016 Presented.
Presented to: By: Date: Federal Aviation Administration Obstacles in the Visual Segment 20:1 Background, Policies and Action Gerard G Lebar Eastern Flight.
State Safety Inspections
Inspector's Role and Responsibilities
Inspector's Role and Responsibilities
Inspector's Role and Responsibilities
2017 Annual Conference, South Lake Tahoe Rayvon Williams,
Presentation transcript:

Airport Obstruction Issues GAA Workshop March 14 th, 2014 Presented by: Alan Hood, Georgia Department of Transportation Airport Safety Data Program Manager

3 categories of approach surfaces for GA Airports. – State Licensing – Part 77 – TERPs Visual Surface (20:1) Approach Surfaces and Obstruction Removal

New State Licensing – 3 configurations - based on runway length < 4,000 4,000 – 4,999 5,000 + – Meets visual approach criteria from design guide Surface starts at threshold Surface should be clear to meet the minimum state licensing criteria Generally least restrictive of the three surfaces Airports inspected biennially New GDOT Airport Licensing Approach Standards

14 32 < To – > To 10, To :1 20:1 500

Obstruction Removal – obstructions should be removed immediately or removal efforts should be initiated as soon as possible with written plan provided to GDOT by specified date in letter. – if removal is not possible, displace threshold Documentation of obstructions: biennial inspection letter Notification –Alan Hood, Airport Safety Data Program Manager and –GDOT Project Manager New GDOT Airport Licensing Approach Standards

Generally most restrictive, used as screening criteria 6 configurations: Based on runway category and type of approach <12,500lb + visual = A(V) <12,500lb + non-precision = A(NP) >12,500lb + visual = B(V) >12,500lb + > ¾ mi visibility = C >12,500lb + < ¾ mi visibility = D >12,500lb + precision = PIR Surface starts 200 from threshold Surface should be clear to meet FAA 5010 Safety Data Inspection Program criteria Airports inspected biennially Part 77 Approach Standards

14 32 C A(V) B(V) A(NP) D PIR :1 34:1 50:1 5,000 10,000 40,000 Part 77 Approach Standards

Obstruction Removal – Obstructions should be removed or provide schedule for removal Documentation of obstructions: biennial inspection letter FAA 5010 report Notification Required –Provide sketch and coordinates of cleared area –Alan Hood, Airport Safety Data Program Manager and –GDOT Project Manager –GDOT will coordinate with FAA to remove from FAA database Part 77 Approach Standards

Surface starts 200 from threshold 20:1 Approach Slope Obstructions should be mitigated to maintain night minimums When are procedures reviewed? –Any request for change in approach, name change, LOC-ID change, runway numeral change, etc –FAA performs review of airports terminal procedures every 2 years FAA Straight-In TERPs Visual Surface Standards (20:1)

14 32 C A(NP) :1 34:1 Part 77 surface is larger than TERPs except in A(NP) and C Category Runways with at least a Category C published approach :1 Exists at 56 Airports in GA

FAA Straight-In TERPs Visual Surface Standards (20:1) Obstruction Removal – mitigate obstructions by: removal lighting PAPI waiver – requires FAA Flight Standards approval –obstructions should be mitigated to maintain nighttime procedures and coordinated per new guidelines if given notice after Jan 6, Obstruction removal previous to notice from Flight Procedures. –Sketch and coordinates of cleared area –Alan Hood, Airport Safety Data Program Manager and –GDOT Project Manager –GDOT notifies FAA to update database

FAA Straight-In TERPs Visual Surface Standards (20:1) If Notified by Flight Procedures of 20:1 Obstructions (After Jan 6, 2014):

Who is Responsible? Ultimately the Sponsor -State Licensing and Part 77 Inspections: When obstructions are identified in an inspection, they become a liability. -State Licensing surface obstructions could lead to denial of license.

Who is Responsible? Ultimately the Sponsor -Sponsors are also responsible for ensuring the TERPs Visual Surface is clear. Flight Procedures uses the FAA surveyed obstruction database to review procedures. -Obstructions do not automatically disappear from database with a new survey. -Must submit sketch with coordinates and boundaries of cleared areas to get obstructions removed from database. ***If you have been notified you have obstructions by Flight Procedures – then you validate the obstructions in writing. No survey or coordinates and boundaries required.

Questions?