Development of the JFK Airport ITS Master Plan ITS America Annual Meeting & Expo: Session 24 From Tarmac to Take-off: ITS Deployment in Aviation June 5,

Slides:



Advertisements
Similar presentations
1 The Role of Bus Transit in the Regional Transportation, Present and Future Howard Benn, Chair, TPB Regional Bus Subcommittee TPB Regional Priority Bus.
Advertisements

Sustainability In Flight
Overview What is the National ITS Architecture? User Services
SV-ITS PROGRAM: Silicon Valley Smart Corridor Project Overview
HSM Security is... “HSM is an nationally recognized integrated security provider, committed to perform excellent service, national.
Facilitating a Dialog between the NSDI and Utility Companies J. Peter Gomez Manager, Information Requirements, Xcel Energy.
Wade E. Kline, AICP Community Development Planner.
Transit Signal Priority Applications New Technologies, New Opportunities Peter Koonce, PE APTA BRT Conference – Seattle, WA Wednesday, May 5, 2009 Technology.
CALTRANS’ TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS CTP 2040 PAC 1 Kris Kuhl Assistant Division Chief, Division of Traffic Operations 4/15/2014 CREATING.
COMMERCIAL MOTOR VEHICLE SIZE ENFORCEMENT. CURRENT CHALLENGES Significant Growth in CMV Traffic Increased congestion and delay Demand for larger and heavier.
INNER CITY INVESTMENT SUMMIT TRANSPORT, INTEGRATED PUBLIC TRANSPORT NETWORK AND TRAFFIC MANAGEMENT Presenter: L N Mangcu SED: Transport and Roads Department.
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
Copyright © Siemens plc All rights reserved. Fuel for thought.
INTELLIGENT GUIDANCE SOLUTIONS IMPROVING URBAN MOBILITY PRESENTATION BY DAVID PEACH THE PARKING SHOP LTD INTELLIGENT GUIDANCE SOLUTIONS IMPROVING URBAN.
TRANSPORTATION POLICY COMMITTEE FINAL REPORT AND RECOMMENDATIONS PROFESSIONAL AND TECHNICAL STAFF COUNCIL ALUMNI CENTER APRIL 2, 2003.
References. Moscow SafeCity Over 175,000 CCTV cameras in Moscow, controlling over doorways and mass circulation areas in ten districts. Vandal-resistant.
ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT.
Transportation Research Board 2004 Annual Meeting Adaptive Signal Control Workshop Session 2: Field Experience January 11, 2004.
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
San Jose Traffic Signal Communications and Synchronization Project Presented by Ho Nguyen City of San Jose, Department of Transportation May 12, 2009.
Phoenix International Raceway (PIR) Presented By: Nicolaas Swart Traffic Engineering & ITS Program Manager Maricopa County DOT April 26, 2006 Presented.
MAINTENANCE & TRAFFIC OPERATION INCIDENT MANAGEMENT.
The Dutchess County Fair Traffic Plan Talking Operations Web Seminar April 26, 2006.
Update on MOITS Strategic Plan Development Andrew J. Meese, AICP COG/TPB Staff MOITS Technical Subcommittee September 9, 2008 Item # 5.
1 State of Good Repair Research Vincent Valdes Associate Administrator for Research, Demonstration, and Innovation July 9, 2009.
Smart Buildings Srirangarajan Kadaba National Manager – Energy Edge Buildings Business Schneider Electric 21June 2010.
Javier Gil Arenales Data, a critical resource for Smarter cities.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
National VII Architecture – Data Perspective Michael Schagrin ITS Joint Program Office US Department of Transportation TRB 2008 Annual Meeting Session.
SeaTac International Airport ITS Initiative ITS America 2007 June 4-6 Session 24 Hicham F. Chatila, PE, PTOE.
Intelligent Transportation System (ITS) ISYM 540 Current Topics in Information System Management Anas Hardan.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
Dixie Regional ITS Architecture Project Summary July 31, 2006.
An Integrated Systems Approach for Border Crossings Transportation Border Working Group Semiannual Meeting Burlington VT June 10-11, 2003 Kevin L. Bebenek.
Traffic Incident Management at the Big Dig Presenter: Kevin A Duffy- CA/T Manager of Emergency Planning & Response
Enhanced 511: Beyond the Basics Jerry Woods Florida DOT – District 5 iFlorida - Automated Message Generation Based on Travel Times.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Dallas ICM Pioneer Site Stage 1 Lessons Learned Webinar July 24, 2008.
0 Christopher A. Pangilinan, P.E. Special Assistant to the Deputy Administrator Research and Innovative Technology Administration, ITS Joint Program Office.
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
Transportation Planning Process Freight Transportation Planning Workshop July 11, 2001.
Security and the National ITS Architecture ITS America 2003 Session 19: The State of the Practice: ITS and Homeland Security May 19, 2003 Minneapolis,
1 Using Intelligent Transportation Systems (ITS) Technologies and Strategies to Better Manage Congestion Jeffrey F. Paniati Associate Administrator of.
SAFETEA-LU System Management and Operations Key Provisions Jeff Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
Corridor Congestion Management Innovation for better mobility sm.
1 Transportation Systems Management & Operations A New Paradigm for the 21 st Century Transportation Department Group 3 3 Notches Above the Rest.
World Bank Transport Knowledge and Learning Program on ITS Cross Regional Cooperation and Freight and Logistics Applications June 22, 2010 I ntelligent.
Wireless Sensor Network Solutions Regional Mobility Solutions Sensys Networks and the Sensys Networks logo are trademarks of Sensys Networks, Inc. Other.
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
COLLABORATIVE DECISION MAKING
Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Traffic Management System Status Update February, 2008.
Technology Subcommittee November Topical Outline Technology Subcommittee Technology Subcommittee RoleRole Work PlanWork Plan ActivitiesActivities.
Airport/Seaport Interoperability for Ground Transportation Operations Airport Ground Transportation Association Spring Conference March 29, 2011.
Intelligent and Non-Intelligent Transportation Systems 32 Foundations of Technology Standard 18 Students will develop an understanding of and be able to.
ITS Virginia Annual Conference April 20, 2012 Sensys Networks and the Sensys Networks logo are trademarks of Sensys Networks, Inc. Other product and company.
Monitoreo y Administración de Infraestructura Fisica (DCIM). StruxureWare for Data Centers 2.0 Arturo Maqueo Business Development Data Centers LAM.
ADVANCED TRANSPORTATION AND CONGESTION MANAGEMENT TECHNOLOGIES DEPLOYMENT (ATCMTD) PROGRAM 1 Bob Arnold, Director Office of Transportation Management,
0 Freight Activities: Year in Review Dec. 12 th 2015.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Border Wait-Time Emissions Analysis Study 1 Project Briefing Travis Black Federal Highway Administration November 14, 2012.
TRB ABE30 Strategic Planning Session
Project Overview – Phase 1
Transportation Research Board 2004 Annual Meeting
Smart Cities Uroš Merljak.
MODULE 2: TSMO Strategies
IBM Software An international airport Establishing near-seamless integration between heterogeneous systems The need: This airport needed a flexible, integrated.
MODULE 2: TSMO Strategies
Presentation transcript:

Development of the JFK Airport ITS Master Plan ITS America Annual Meeting & Expo: Session 24 From Tarmac to Take-off: ITS Deployment in Aviation June 5, 2007 Philip Riggio, TransCore Ira Huttner, Port Authority of New York & New Jersey

Map of JFK Central Terminal Area

John F. Kennedy International Airport Annual Traffic, People, & Cargo Volumes 42 million passengers on 400,000 flights 2 million tons of cargo Nearly 15k public parking spaces used by 5 million paid parkers Employs 35,000 people 9 passenger terminals 30 miles of internal roadways The Challenge: Efficiently manage landside operations

JFK Landside Operations Responsibilities Parking management Taxi dispatching Traffic management Traveler information Public transportation Emergency management

The Need for a Master Plan Constant state of change Reconstructing terminal facilities Developing/renovating parking facilities Realignment of roadways Stand-alone deployments Real-world problems not currently addressed Technology deployments to meet operational needs Enhance customer service Improve access to information

Master Plan Vision Integrate ITS technologies into a uniform platform enabling operations staff to implement targeted response plans to mitigate the effects of incidents and operations challenges

Master Plan Objectives Facilitate traffic ingress/egress Improve information flow to staff and motorists Deliver coordinated tools to manage traffic/parking Minimize impact of incidents Minimize impact of construction Improve access and management of ground transportation services

Process Needs Strategies Analyze Potential ITS Solutions Propose ITS Solutions Integration Opportunities Implementation Plan Define Projects Prioritize Inventory On-Airport Systems and Operational Practices Review Regional Initiatives

Example Parking Management – Queue Detection, Surge Detection, and Quantifying Delay for Exiting Vehicles

Needs Reasonable customer wait time (exit) Alert when wait times are too long Avoid revenue loss – going manual or bleeding lots Reduce interior aisle congestion Optimize staffing levels Improve customer service & operational efficiencies

Strategies Remotely monitor parking lot exits Identify wait time threshold breaches Notify parking operations & OCC staff Develop tools to reduce delays

Analysis Access potential solutions CCTV Loop/traffic detectors E-ZPass tag readers License plate readers (LPR) Considerations Existing deployments Accuracy Additional Services Operations

ITS Solution Proposed solution - LPR Interconnect with parking revenue and control system to compare license plate read times Efficient for operations staff Detect every vehicle Exit lane-specific data

Estimate Costs and Qualitative Benefits Estimated costs Capital: $600k Recurring: $50k annually Benefits Capacity: increased throughput Mobility: reduced vehicular delay Energy/Environment: reduced fuel consumption and HC & CO emissions Operational: reduced parking revenue losses; potential to use data for monitoring parking lot configuration/operator performance

Tying it All Together

Parking Management – Interconnect Diagram

Interconnects – Example Data received from other subsystems: license plate numbers & time stamps of vehicles at parking lot exit booths, parking lot exit plaza lane configuration Data provided to other subsystems: parking lot exit wait time (by plaza or by lane), parking lot exit queue length alarms, operational status of hardware

Overall Interconnect Diagram

Operational Plan and Decision Support System Pre-engineered response plans Coordination across functional areas Timely and consistent information dissemination HAR HAT VMS WWW

How it All Works Together Data from multiple subsystems is transmitted to the Operational Plan & Decision Support System It is processed and a pre-arranged response or Operational Plan is recommended by the System for approval by the operations staff via the Integrated Workstation The operations staff reviews and approves, rejects, or modifies the recommended Plan With approval, the Operational Plan & Decision Support System commands other subsystems to act Operations staff monitors the response and the status of the incident via video, voice, and other available information As the incident changes, the operations staff can adjust the characterization of the event or otherwise modify the Systems response to it

Implementation Plan Proposed ITS solutions grouped into projects Projects are prioritized and categorized by short/mid/long-term ranges Working with facility staff, short-term projects list was designed to integrate existing systems and technologies into a more uniform platform Long-term projects were intended to meet the Agencys long-term objectives and may be dependent on the implementation of certain IT infrastructure

Core Project Develop operational plan and decision support system Build out data center Dissemination of parking information View and control existing landside CCTV Provide RWIS/VIDS/Transmit to landside ITS Automated VMS/HAR messaging and updates Integrate traffic signal control with landside ITS Integrate JFK Traffic Information subsystem Enhance JFK Web site

Follow on – Next Steps Internal agency committee was formed to: Review recommendations Revise project priorities with facility staff Refine overall implementation plan Place selected projects in Capital Plan Initiate preliminary designs for construction

Lessons Learned Airport environment unique Established operational practices and systems Private-sector entities involved Intra-airport passenger and traffic circulation Security issues Parking management is key Create a Master Plan, not a wish list Be proactive Integrate systems across functional areas to solve operational problems.