WestConnect Regional Transmission Service Tariff

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

E-Tariff - The Problem with Joint and Shared Filings Presented by National Grid NAESB E-Tariff Conference Colorado Springs January 23-25, 2008.
WestConnect, RTO1 Western Electricity Coordinating Council Board of Directors Meeting June 5, 2002 WestConnect RTO Cary Deise Arizona Public Service Co.
March 25, 2010 WestConnect Transmission Planning Update Bob Easton TEPPC Meeting.
2009 Generators that have Achieved Certification Arizona Public Service Company ATCO Electric Ltd. Avista Corporation Basin Electric Power Company Black.
1 TEPPC March 25, CCPG Transmission Providers.
1 Colorado Coordinated Planning Group PCC Update March 6-7, 2008.
1 Joint Initiative Update WECC OPS Meeting San Diego, California February 2, 2010.
Arizona Corporation Commission Arizona Independent Scheduling Administrator (AzISA) September 22,
Cost Ranges for the Development and Operation of a Day One Regional Transmission Organization PL
David H. Wiggs General Manager Los Angeles Department of Water and Power September 24, 2003.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
WELCOME Western Area Power Administration1. Where did the journey begin? Western Area Power Administration2.
Montana Energy Summit Transmission Planning Process April 22, 2008.
WestConnect RTO Remarks of Charles Reinhold Project Manager FERC’s Regional Technical Conference Phoenix, Arizona September 24, 2003.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
What’s New in Southern Companies’ OATT Southern Company Transmission 2008 Customer Forum.
ORDER 1000 WHY CALIFORNIA PUBLIC UTILITIES COMMISSION SUPPORTS ORDER 1000’s ELIMINATION OF RIGHT OF FIRST REFUSAL OPINIONS EXPRESSED IN THIS PRESENATION.
Transmission Barriers to Wind Energy in the West Presented by: Pamela Jacklin Stoel Rives LLP POWER-GEN Renewable Energy & Fuels 2007 Conference Mandalay.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Wyoming Geological Association Conference Prepared: July 26,
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
. Juan de Fuca Cable. Safe Harbor Statement Included in this document is certain information which is “forward looking information” as defined by the.
BCTC Customer Consultation on Loss Compensation Service January 15, 2007.
Vanus J. Priestley Philip R. O’Connor. Ph.D.
 One part  Extends North; includes the Rocky Mountains  Peaks, canyons, and cacti  Guadalupe Peak- highest point in Texas at 8,749 feet above sea.
1 Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
2014 Attachment O True-Up Customer Meeting August 25, 2015.
2009 SOUTHEAST ARIZONA TRANSMISSION SYSTEM STUDY REPORT 6 th BTA Workshop Carnegie Library, Phoenix, AZ By TEP on behalf of SATS Participants June 3-4,
WestConnect Regional Transmission Service Tariff March 16, 2015.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
1 New Mexico State University Santa Fe Conference 2005 Steve Rodgers Office of Markets, Tariffs & Rates—South Federal Energy Regulatory Commission March.
2014 Calendar Year Customer Survey Results. Background Open for comment February 12, 2015 through March 31, 2015 for evaluation of prior year – 21 close.
Joint Outreach Team Implementation Plan July 12, :30-11:30 a.m.
1 Joint Initiative Northwest Wind Integration Forum Policy Steering Committee Meeting January 6, 2010.
WestConnect RTO-ACC Update September 2, 2003 Cary Deise APS.
Arizona Corporation Commission Energy Workshop February 16, 2001.
The Western Interconnection The West has only one RTO/ISO, the California Independent System Operator, the most costly RTO in the US at $229.2 million.
1 CATS HV Status Report Presented to the 2008 BTA Workshop May 22, 2008.
Tariff Changes Proposed by Integrated System (IS) 2/20/2014 Carl A. Monroe EXEC VP & COO.
ALLIANCE RTO 1 The Alliance RTO Rate Plan Presented to SPP RTWG Meeting at DFW Airport Hyatt The Alliance RTO Rate Plan Presented to SPP RTWG Meeting at.
Arizona Corporation Commission Biennial Transmission Assessment Workshop May 22 & 23, 2008 Phoenix, AZ.
Alliance Update Illinois Commerce Commission Electric Policy Committee July 10, 2001.
2016 WECC Schedulers Meeting.  Wholesale Power for 44 Member Rural Electric Cooperatives ◦ 1.5M Members  ~2800MW Peaking load ◦ Across Five States 
Open Access Transmission Tariff Amendment No. 9 Greg Broeking, Chief Financial Officer March 7, 2012.
North American Energy Standards Board Standards Development for Demand Side Management / Energy Efficiency September 14, 2009 Eric Winkler, Ph.D. Project.
Rochester Public Utilities Presentation on Formula Development of Transmission Revenue Requirements for 2016 October 23, 2015.
EE379K/EE394V Smart Grids: Smart Grid, A Contrarian View
Mountain West Transmission Group
California Product Offerings
Joel Bladow – Tri-State G & T
Summer 2000 – Present in California
WestConnect Joint Sub-Regional Planning Group Meeting August 18, 2016
Clarification of the Resident Load Definition
PMC Membership as of 5/1/2016 Enrolled TO Coordinating TO 1
Duke Energy Carolinas Quarterly Stakeholder Meeting
Eskom presentation – Select Committee on Communications and Public Enterprises 14 June 2017 Briefing by Eskom on its tariff increase for and.
Western Producer Services
PCC Meeting March 26, 2014.
Rochester Public Utilities Presentation on Formula Development of Transmission Revenue Requirements for 2016 October 23, 2015.
Trends in Generation Dispatch
BHP 2016 Formula Rate True-Up Meeting
BHP 2017 Projected Net Revenue Requirement Meeting
Rates & Regulatory Updates
BHP 2015 Formula Rate True-Up Meeting
BHP 2018 Projected Net Revenue Requirement Meeting
BHP 2017 Formula Rate True-Up Meeting
Short-term Competition and Preemption (STCP)
Mountain West Transmission Group Panel Discussion
800 MHz Rebanding Mexican Border
Presentation transcript:

WestConnect Regional Transmission Service Tariff March 16, 2015

WestConnect Regional Transmission Service - Status Began two-year experiment on July 1, 2009 Extended for second two-year term on July 1, 2011. Participants had filed to amend the Regional Tariff to eliminate date certain termination. Essentially making the Regional Tariff permanent until termination is approved by the providers.

WestConnect Regional Transmission Service - Background Eliminates transmission rate pancaking for non-firm transactions Continues to pancake ancillary services and losses Retains participants’ posted OATT rates Implemented through wesTTrans platform on OASIS. Did not require FERC filing for non-jurisdictionals No state approvals required Fail-safe clause for non-jurisdictionals Revenue distributed pro-rata based on posted rates

Transmission Service Price Components The Regional Rate is the highest posted OATT rate in the path Ancillary Service 1 (scheduling) remains pancaked Ancillary Service 2 (reactive) assessed only at sink Losses remain pancaked Monetized at Palo Verde Index price for date of transaction Administrative charge is a pass through of OATI charges on behalf of the transmission providers

WestConnect Regional Transmission Service - Participants Arizona Public Service Black Hills Colorado BH/BE Common Use System - Basin Electric Power Coop. - Black Hills Power, Inc. - Powder River Energy El Paso Electric Public Service New Mexico Southwest Transmission Cooperative Tri-State G & T Association Tucson Electric Power Western Area Power Administration - Rocky Mountain Region - Desert Southwest Region CRSP Management Office Xcel Energy/Public Service Colorado

Original Experiment Parameters Risk: Without an increased number of transactions, non-firm transmission revenues could decrease for the affected Regional Participants. Performance has not dispelled the risk, but transmission providers are comfortable with offering regional transmission service.

Contacts and Information WestConnect (www.westconnect.com) Doug Reese – Pricing Mgmt. Comm. Chair dreese@tristategt.org 303-254-3676 Charles Reinhold – Project Manager reinhold@ctcweb.net 208-253-6916 WestConnect