OVERVIEW: BUILDING ENERGY PERFORMANCE- ENERGY MONITORING INFORMATION SYSTEM Integrated online platform for ECBC COMPLIANCE and BUILDING ENERGY MONITORING.

Slides:



Advertisements
Similar presentations
CASDA Project Management A presentation to the CASDA Preliminary Design Review IM&T / CASS Dan Miller | CASDA Project Manager 11 March 2014.
Advertisements

Proposed AMIT SMT Methodology and Release Strategy March 9, 2010.
  Generic and configurable application to provide an electronic delivery for the services.  Provides a single, unified,
Using SharePoint as a Collaboration Tool Matthew Zimmerman UT Southwestern Medical Center May 27 th, 2011.
1 Online Permitting System CLEAN AIR TRACKING SYSTEM.
EForms and Service Delivery through State Portal & SSDG Kavita Bhatia.
Rare’s CampaignTracker A brief overview of its design and function and what we have learned so far.
Operating Systems & Information Services CERN IT Department CH-1211 Geneva 23 Switzerland t OIS Open source web analytics.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
City of Chicago Certification & Compliance System
Energy efficiency measures in the public building sector: the DEEP project Freiburg, 14 June 2007 Philipp Tepper Sustainable Procurement ICLEI - Local.
Shop 9000 Product Review 2007 Visual User Group Nov 21 st 2007.
A Product of Copyright © ANGLER Technologies AURA – Quality Compliance Monitoring & Process Management System.
Vireo: The TDL Solution to Electronic Thesis and Dissertation Submission and Management Brought to you by the Texas Digital Library
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
From Local to Global: Launching the New Rangelands West Portals and Database XIV IAALD World Congress 2013 Cornell University July 22, 2013.
1 Online Permitting System CLEAN AIR TRACKING SYSTEM 9/21/2015CATS Program Update.
Follow us on: PATH Applicant Tracking Overview of Applicant Tracking for the HR Liaison Meeting 02/07/2013.
© 2007 RightNow Technologies, Inc. Understanding the Power of RightNow 8™ David McCurrach Senior Solutions Consultant RightNow Technologies April 10, 2007.
ECPIC Quick Guide: eCPIC-ITDB Interactions Purpose: The eCPIC-ITDB Interactions Quick Guide has been developed to provide a high-level, informational overview.
OCS-Benchmark Submission Basics Provided by OCS Education E-learning Network Provided by OCS Education E-learning Network.
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
APEC Project Database.
PRESENTATION BY SCOTT MCGEARY SHAREPOINT ADMINISTRATOR FOR DSHS – CHILDREN’S ADMINISTRATION T-5 - SharePoint - Streamline Productivity within your Agency.
Feature Synopsis Easy and fast upload as well as transfer of billing information to employees. Multiple GSM number support. Multi-provider support. Easy.
Authorized economic operator Minimizing risks, optimizing flows.
1 Fannie Mae Servicing, Loss Mitigation, Quality Control & Policy John Curcio, Director Michael Sloan, Manager © 2015 Fannie Mae. Trademarks of Fannie.
CIS Alumni Online Green Team. GoGreen Team Members Daniel Andrew Daniel Andrew Ricardo Eights Ricardo Eights Sabrina Fontaine Sabrina Fontaine Raymond.
Accurate  Consistent  Compliant Contact: i4i the structured content company the structured content company.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
+ GIO-land Verification/Enhancement Data Exchange Platform.
ActionSoft Tool for Scheme Implementation & Monitoring.
MAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION
1 Detailed EM&V Approach for each of BGE’s Proposed Conservation Programs January 10, 2008.
Legal Information Management & Briefing System LIMBS A Comprehensive Web Based Solution to Court Cases Arbitration Module An initiative of Ministry of.
Innola Solutions, Inc., USA March 24, 2017
EZSource Electronic Source Selection Tool
Customer Support Strategic Pillars
LOCKOUT TAGOUT View established Site Lockout Tagout procedures and track LOTO execution Create or upload LOTO procedures in local language using a standardized.
E-Learning Solutions webtopsolutions.net
USER ADOPTION MONITOR Track and Evaluate Adoption of Dynamics 365/CRM
ESEA Consolidated Pre-Monitoring Meeting
Writing the Response to Intervention (RtI) District Plan
Rapid Connect® Getting Started
Government of Jharkhand Ease of Doing Business – Labour Reforms
Installation Restoration (IR) Collaboration Gateway
Governance Assistant for Office365
Leigh Grundhoefer Indiana University
ESEA Consolidated Monitoring
Cloud Management Mechanisms
CLIENT ZipDial.
IMS UPDATE (Information Management System) 9th Tuna Data Workshop
TAKING THE BIG LEAP-FROM NECESSARY EVIL TO BUSINESS ASSET
SECRETARY OF STATE’S OFFICE CAMPAIGN FINANCE MODERNIZATION PROJECT
Certification Phase: PLANNING
Project Information Management Jiwei Ma
ICAO Aviation English Language Test Endorsement
The European Union’s programme for India
WESTERN REGIONAL WORKSHOP
Technical Capabilities
22nd Annual CUNA Lending Council Conference
IHCDA Online Annual Owner Certification
Training 101 : Accessing iBoomerang Tools
10th Annual Air Quality Governance Lekgotla
Red Sky Update “Watching the horizon for emerging health threats”
A Guide to the Sharing Information on Progress (SIP)
Development Goals for Year 2
ArcGIS Online Steps for Success A best practices approach
Project Certification Planning Phase August 27, 2014
Certification Phase: Implementation
Presentation transcript:

OVERVIEW: BUILDING ENERGY PERFORMANCE- ENERGY MONITORING INFORMATION SYSTEM Integrated online platform for ECBC COMPLIANCE and BUILDING ENERGY MONITORING

SALIENT FEATURES OF THE TOOL ECBC COMPLIANCE BUILDING ENERGY MONITORING Facilitates COLLABORATION among stakeholders STRUCTURED and GUIDED compliance procedure SEAMLESS workflow, interweaving functionalities of different Users EASY TO USE and INTUITIVE User Interface CUSTOMIZED Interface caters to various user groups Real-time tracking of ONGOING Energy and Demand MONITORING (via. Smart meters) Different hierarchies (National, State, ULB, Building) and time period (daily/weekly/annually/custom) Customizable DASHBOARDS for different user groups Assess building performance based on metrics Energy Performance Index (EPI) Daily Energy Use Building Rating (Future Provision) Update building information (Typology, Occupancy, etc.)

ECBC COMPLIANCE

PROCESS FOR ECBC COMPLIANCE THROUGH EMIS TOOL Empaneled Firm (Buildings) DESIGN TEAM WITH TECHNICAL EXPERTISE OWNER ECBC eligible building 1. Submit construction and compliance documents 2. Site inspection and document scrutiny and verification 3. Gives ECBC compliance certificate 5. Occupancy Certificate 6. Energy use data transfer through smart meters 4. Submit ECBC Compliance certificate from Empaneled Firm at different construction stages AUTHORITY HAVING JURISDICTION Building Energy Performance Dashboard END USER/ Owners SDA + BEE 8. PENALITIES AND INCENTIVE (as decided by state government) 7. EPI report

PORTAL HOME PAGE

LOGIN PORTAL

PROJECT INFORMATION

PROJECT INFORMATION

ONLINE SELECTION OF EMPANELED FIRM

ENERGY AND DAYLIGHT REPORT GENERATION

BACKEND ENERGY SIMULATION OUTPUT PROPOSED CASE ENERGY MODEL IS UPLOADED AS SUBMISSION IN idf FORMAT

REVIEW AND RAISE ISSUE

NON-COMPLIANCE/ INSUFFICIENT DOCUMENTS CREATE ISSUE: NON-COMPLIANCE/ INSUFFICIENT DOCUMENTS

CERTIFICATE GENERATION

EMPANELED FIRM OWNER OWNER OWNER DESIGN PHASE CONSTRUCTION PHASE COMPLETION PHASE FORM III (GENERATE) FORM VII (GENERATE) FORM X (GENERATE) ON SATIFACTORY SUBMISSION BY OWNER AND VERIFYING COMLIANCE ON SATIFACTORY SUBMISSION BY OWNER AND INSPECTION OF COMLIANCE ON SATIFACTORY SUBMISSION BY OWNER AND INSPECTION OF COMLIANCE SUBMIT SUBMIT SUBMIT OWNER OWNER OWNER

OWNER APPROVING AUTHORITY APPROVING AUTHORITY APPROVING AUTHORITY DESIGN PHASE CONSTRUCTION PHASE COMPLETION PHASE FORM II (GENERATE) FORM II (GENERATE) FORM II (GENERATE) FORM III (FROM EMPANELED FIRM) FORM VII (FROM EMPANELED FIRM) FORM X (FROM EMPANELED FIRM) SUBMIT SUBMIT SUBMIT APPROVING AUTHORITY APPROVING AUTHORITY APPROVING AUTHORITY

BUILDING ENERGY MONITORING

ULB LEVEL: ENERGY USE MATRIX SIMILARLY, NATIONAL, STATE AND BUILDING LEVEL DATA CAN BE VIEWED

PROJECTS BEING MONITORED

ENERGY USAGE PATTERN

PROJECT WISE: ENERGY USAGE PATTERN

ENERGY USE MATRIX

TIME PERIOD WISE: ENERGY USAGE PATTERN

BUILDING LEVEL: ENERGY USE MATRIX

ENERGY USE MATRIX

THANK YOU !