By Robert J. Blight Project Engineer Bureau of Materials.

Slides:



Advertisements
Similar presentations
Volvo Construction Equipment Road Institute Paving Principles.
Advertisements

HST Toolpaths.
F&T Inc. OVERHEAD CRANE SAFETY.
Construction of Longitudinal Joints 2014 VDOT/VAA Regional Asphalt Seminars Ken Arthur Quality Control Manager Templeton Paving.
1 Cold planers Prestudy Jan 2009 / Jürgen Seemann.
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Earthwork Operations & Equipments
Highway Engineering Pavement Types
AMERICA RIDES ON US Basics of a Good Road: Part 3 Foundation Prep, Testing Standards, Quality and Inspection LTAP Road Scholar Core Course #6.
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
Presented at: Rutgers Asphalt Paving Conference March 8, 2011 Presented by: Eileen Sheehy, P.E. Manager, Bureau of Materials NJDOT.
PPTG Thin Overlays Task Group (TOADS) Team Overlay Asphalt Debaters Presented by Basem Muallem (CT) - Tony Limas (Industry) April 19, 2005.
Uniform Paving Platform Regional Asphalt Seminar, Blacksburg, VA March 12, 2015 David P. Shiells, P.E. District Materials Engineer.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 2 Surface Characteristics.
The Future is Thin: Surface Mix Experience and Performance in the City of Ottawa Steve Goodman, M.Eng., P.Eng. Senior Pavement Engineer, City of Ottawa.
Construction of LLP HMA Pavements Pre-bid Meeting Solano 80; 04-4A0104 District 4 Oakland, CA September 14, 2012 Bob Humer.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Tranlation: EASL’s Average Daily Traffic Time or Traffic Pavement Condition Index Pavement Performance Pavement Condition High Performance Intersections.
Uniform Paving Platform A Contractor’s Perspective J. Brent Moore Regional Manager Branscome, Inc. - Richmond.
SESSION 3 Subgrade This module presents the concepts and methods of characterizing the subgrade for the purpose of concrete pavement design. It also highlights.
HMA Construction Program
3- Pipsqueak Piston and Cylinder. Work holding in the Lathe Collets have definite advantages over chucks in gripping work pieces in the lathe. They apply.
Session 3-6 HMA Overlays.
Chapter 5 Patching and Edge Repair
Street and Local Roads Inspection and Acceptance of Alternative Pavements.
APPLICATIONS MILLING MACHINE CONTROL SYSTEMS LAYOUT FOR SUPER-ELEVATED CURVES PAVER CONTROLS POTENTIAL PROBLEMS.
Pavement Maintenance II
I. Advantages of Smooth Pavements: Longer Life Public Opinion Save Fuel Less Surface Maintenance II. Ways to Ensure Smooth Pavements Subgrade and Subbase.
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
Pavement Distresses Flexible Pavement
Performance & Distress of Flexible Pavement Serviceability/Performance Concept.
Pavement Analysis and Design
ROAD WITHOUT DRAIN A GREAT DISASTER - A case Study By Er. Nandanandan Das Ex. E.I.C cum Secretary, Works, Govt. Of Odisha 1.
Perpetual Pavement Design John D’Angelo Federal Highway Administration Washington, DC Canadian User Producer Group for Asphalt Saskatoon, Saskatchewan.
Maintenance & Rehabilitation Strategies Lecture 5.
Procedures in Modern Road Construction I. Development of Ancient Roads 1. Great civilizations throughout history enhanced road building. 2. Cross-section.
Pavement Types Dr. TALEB M. Al-ROUSAN.
PERFORMANCE MODELS. Understand use of performance models Identify common modeling approaches Understand methods for evaluating reliability Describe requirements.
Module 3-4 Cold Milling. Learning Objectives  Describe the cold milling process  Describe the characteristics of typical milling equipment  Describe.
4/25/2017 9:25 AM Inertial Profiler Forum Intro to the Inertial Profiler Implementation September 28, 2015 © 2015 California Department of Transportation.
SESSION 9 Construction Considerations. Objectives  Describe key aspects of: Prepaving operations Paving operations Postpaving operations  Understand.
Ultra Thin Bonded Wearing Coarse Sponsored by: Minnesota LTAP Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman, P.E. SemMaterials.
Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association.
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
Chip Seal Design Chapter 2. North America (ranked by prevalence) Empirical / Past Experience No Design Method Own Method McLeod (1960’s) - Asphalt Institute.
Jerry L. Larson IRMCA Indiana LTAP Basics of a Good Road
Extending Performance with Proper Asphalt Compaction
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
Micro-milling The Economics A Rehabilitative Strategy for Savings Presented By: Sheila Hines Georgia Department of Transportation.
Pavers & Mix Laydown Module 6. Pavers & Mix Laydown  Review paver components –Tractor –Screed –Grade and slope control  Operational principles of screed.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
Milling & Micro Milling
Alabama Asphalt Pavement Association
Concrete Repair.
David P. Shiells, P.E. District Materials Engineer
WAPA / WSDOT Joint Training
General Road Construction Information
Uniform Paving Platform A Contractor’s Perspective
Surface Preparation before laying Hot Mix
Pavement condition index calculation
Barry Paye, PE Chief Materials & Pavement Engineer Wisconsin DOT
Alabama Asphalt Pavement Association
Longitudinal Joint Construction – Why Straightness Matters
SUBGRADE HOW TO DEAL WITH SOFT SPOTS
F&T Inc. OVERHEAD CRANE SAFETY.
How to install pavers..
Surface finish Flóra Hajdu B406
ACEC Designer Training
Presentation transcript:

By Robert J. Blight Project Engineer Bureau of Materials

Remove Deteriorated and Distresses Pavement (to a specified depth) Improve Cross-Slope Achieve Specified Grades Provide a Uniform Surface Texture to Facilitate Compaction of HMA Provide Best Opportunity for Achieving the Ride Quality Requirement

Excavation Maintain Overhead Clearance Correct Ponding and Drainage Maintain Curb and Gutter Staged Construction

Need enough of cores to determine the consistency of the existing pavement Establish the most reasonable milling depth Provide thickness of the layers Determine depth of Top Down cracks

Need to remove the entire layer to avoid scabbing Need to remove reasonable amount of the deteriorated pavement

Need to remove the entire layer to avoid scabbing Need to remove reasonable amount of the deteriorated pavement

For every operation (or opportunity) the IRI was expected to be improved by 30% Milling = 30 % improvement of IRI Each subsequent operation (each paving lift) expected 30% improvement of of IRI

Determination of the Target IRI is more complicated 30 % improvement is no longer used in determination of Target IRI Many other factors involved that affect the target IRI THE POINT IS THAT EVERY OPPORTUNITY FOR SMOOTHNESS (MILLING) IS IMPORTANT

Equipment Self-propelled with variable operating speeds capable of removing pavement without using heat Automatic grade controls Stringline or ski type reference system Ski must be minimum of 20 length Teeth should be replaced if dislodged, broken or unevenly worn

Construction No ride quality requirement Texture requirements, but they are not typically checked Striations must be within ±1 in 200 of line parallel with the center of the traveled way Striations not to exceed 3/8 depth Milling depth within a tolerance of ± ¼ If opened to traffic, no drop-offs to exceed 2

Equipment Self-propelled with variable operating speeds and equipped with cutting drum specifically designed for milling pavement to close tolerances Drum must have 2 wraps of flighting with bolt-in blocks that accept 3 or 4 teeth on the wear side of the flight Second wrap of flighting must trail the first by 180 degrees Teeth spacing of 5/16 (±1/32) Cutting radius of the drum within ± 1/32

Construction No ride quality requirement Texture requirement, but typically not measured Striations must be within 5/16 center to center Striations not to exceed 1/16

Indiana DOT Macrotexture Requirement measured by Sand Patch Test using glass beads (ASTM 965) Not complicated Data shows improvement in HMA densities due to improved working platform

Georgia DOT Ride quality requirement for milled pavements if traffic is allowed prior to overlay IRI < 75 in./mi. for Interstates IRI < 85 in./mi. for all others

Industry has requested to allow traffic on milled surfaces If NJDOT allows traffic, we will require End Result specifications IRI Macrotexture or Combination of IRI and macrotexture Micro-milling specification will have End Result requirements

Contact Info.: Robert J. Blight Project Engineer NJDOT Bureau of Materials Phone (609)