ST800 Service Tester, 800 Amps.

Slides:



Advertisements
Similar presentations
Presentation : IMS – Tech Managers ConferenceAuthor : IMS StaffCreation date : 08 March 2012Classification : D3Conservation :Page : # 05 - Wiring Methods.
Advertisements

The D.C. Scout Battery Distribution System Ground Locator
AnaSonde Assembly. What is the AnaSonde? *Reads temperature, pressure, and humidity data from the atmosphere *After it is sent into the atmosphere, it.
UVM CricketSat Assembly Manual. Getting Started Make a hard copy print out of the following page It will help you identify the proper components Place.
Super Beast- Three-Phase WYE Application
Color Patch on TV Screen Color Patch Repair Guide
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
Using a Multimeter.
BASIC ELECTRICITY n VOLTAGE n AMPERAGE n OHMS Page 242Autobody Text.
Electrical Wiring Residential
EET Survey of Electronics
Proposed Design and the Operation of a Disconnecting Device for Small EG Installations Prepared by Hendri Geldenhuys.
MEASUREMENT DEVICES OUTLINE Multimeters Analog Multimeters
Vex 1.0 © Carnegie Mellon Robotics Academy Inc. MULTIMETER Introduction This PowerPoint is a companion to the videos in “Background / Resources / Multimeter.
Applications of Inductor
© 2011 Ericson Manufacturing, Willoughby, Ohio
Charging System Service
VAT: Volt Ampere Tester
Chapter 19 Charging Systems.
Electrical Fundamentals
Smitty’s Speed Drills 2008 Code Drills Health Care Facilities (C) Copyright 2008 Ted "Smitty" Smith1.
DIAGNOSTIC TEST TOOLS. JUMPER WIRES n USED FOR TEST PURPOSES n ABOUT 6”, 12” 3 FT, AND 15 FT. n LARGE ENOUGH GAUGE n DIFFERENT TERMINAL ENDS n ALLIGATOR.
© 2007 Ideal Industries 1 of 15 IDEAL Tracer Training Introduction on the IDEAL Industries, Model Series Tracers.
Home Electrical Systems. Behavior Objectives  Define the basics of Electrical Systems  Explain the basic principles of Electricity.  Describe the different.
Unit 5 Learning Objective(s) L5.1a To understand the need for safe working practices when carrying out practical electronics L5.1b To understand relevant.
© 2007 Ideal Industries 1 of 15 IDEAL Tracer Training Introduction on the IDEAL Industries, Model Series Tracers.
PR570 POWERITE II TRAINING Dedicated to Success in Electronic Servicing for 50 Years.
Ag. Mechanics for Beginning Teachers
Direct Hot Water. What Cold Water System is Pictured? What hot Water System is Pictured?
The Basics Electronics. To familiarise yourself with electronics To have an understanding of how and why we test electronic circuits. To complete a test.
Electrical Testers Basic test equipment used in today’s shops may include an analog type meter, a VAT (Volt-Amp-Tester), DMM (Digital Multimeter),
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
Residential Wiring Unit 3 – Installation and Planning.
ELECTRICAL INSTRUMENTS ( service and utilization )
Installing Branch Circuits Unit #32. What are Wiring Boxes? hold cable or conduit and protect connections attached to building contain all electrical.
Current Transformer Testing
Using a Multimeter.
Electrical Safety.
2011 Changes Two Minute Drill
DESCRIPTION AND GUIDE TO OPERATIONS
GROUND-FAULT GROUND-CHECK MONITOR
The D.C. Scout Battery Distribution System Ground Locator
HVI HIPOT TEST SET Pft sERIES.
Agricultural Systems Technology II
Associated Hazards and Safety Practices
EZCT TURNS RATIO TEST The EZCT’s use the “Voltage Method” to determine the CT Turns ratio The ideal connection is shown in this illustration.
Engineering Project Cable Management.
ET 438B Sequential Control and Data Acquisition
Fast Phasing Made Possible by the G3 Field Probe
Overcurrent Protection— Fuses and Circuit Breakers
LONG RANGE PHASING TOOL
Grounds Tester GT400 or GT600.
Equipotential Grounding Procedures Protective Grounding Training
Safety Meeting Topics Standby Generator Safety
Multimeter Purpose Used to measure Voltage and Current around a circuit. Multimeter is the generic name given to the universal, Volt, Amp, and Ohmmeter.
A. Touching both terminals with the hands can cause electrical shock
Relocating a Three Phase Transformer Bank
2008 Code Drills Health Care Facilities
Electrical components and systems
CORDLESS PHASING TESTER
USING A DIGITAL VOLT- OHM - METER
FIGURE 15–21 When connecting a starter tester such as a Sun VAT 45 to the vehicle, make certain that the inductive probe is placed over all of the cables.
Presented by: HJ Arnett Industries, LLC
Relocating a Three Phase Transformer Bank
Fluid Power System Electrical Control
Presentation transcript:

ST800 Service Tester, 800 Amps

Overview Theory of Operation & Principles Equipment Overview Procedures Features

Theory of Operation & Principle Using a microprocessor, the ST800 circulates a maximum of an 800 Amp pulse, through the cable assembly to test the instantaneous ampacity capability of a conductor, while simultaneously identifying it. When the “V/I” button is in the “I” position, the ST800 will alternate between the current display and the pulse count every second until the current reaches 500 amps, then every other second until it reaches 800 amps.

Theory of Operation & Principle When the “V/I” button is in the “V” position, the ST800 will alternate between the line voltage display and the pulse count every second until the current reaches 500 amps, then every other second until it reaches 800 amps. Operating voltage is from 10V AC to 500V AC.

ST800 Push Button Controls V / I pushbutton for Voltage or Current display. “Test” light is green when unit is ready for operation. Power OFF / ON pushbutton

STRCV Probe Switch Positions OFF position - Unit Off for storage and transit. High - 300+ Amp position Medium- 50 – 300 Amps position Low- Less than 50 Amp position “T" position tests internal battery voltage by sounding buzzer and light indications.

STRCV Probe Note: Concave Tip that should rest against outside jacket of cable.

Procedure for Testing Service Connections/Cable Pull meter base or leave meter base in, whichever is more convenient. Attach alligator clips to either Hot leg / Neutral as shown in slide #10 and #11, only 3 connections are possible. Push ON/OFF pushbutton IN to turn on ST800. It is recommended, using the “V/I” pushbutton in the “V” (voltage) position, Line Voltages are verified on both Line-to-Line and Line-to-Neutral connections before proceeding. Note: Before removing alligator clips under possible load, turn OFF the ST800 and then back ON after the connections have been made. If any Voltage readings from Step #3 are not consistent with the System Voltage(s), identify which conductors are not terminated/connected and make necessary repairs before proceeding.

Procedure for Testing Service Connections/Cable 5. After Line-to-Line and Line-to-Neutral Voltages have been verified, using the “V/I” pushbutton in the “I” position, the current reading will display alternately with the number of counts until the service reaches 800A or 158 counts (90 degrees). A good service should, under most conditions, achieve 800 Amps in less than 158 counts. Note: Extremely long (500ft.>) and or small (#2) conductor good services may cause the ST800 to NOT achieve 800 Amps because of too much Voltage Drop. It is up to each Utility to develop their own “Pass/Fail” criteria under these conditions.

ST800 Connected Hot to Hot leg with Full Current Displayed

ST800 Connected Hot to Neutral with Voltage Displayed

Procedure for Identifying Transformer Conductors While the ST800 is attached to Pedestal or Meter Base as shown in slide #13, it is pulsing a current on the conductors, note the Maximum current reading on the ST800. Adjust the STRCV Probe current selector switch to the respective current setting as displayed on the ST800 in step #1. Place the concave STRCV probe tip, as pointed out in slide #7, firmly against the outside of each jacket cable going into the X1,X2,X3 terminals. An Audible/Visual tone on only two conductors represents the cables to be identified as shown in slide #14, note direction of pulse and match from Step #1 for correct (hot(s) or neutral) identification.

Check for Identification away from close proximity from other conductors for a more consistent reading. The conductors in the left picture are too close, while the conductors in the right picture are much better with the conductors further apart.

Procedure for Testing URD Primary Cable for De-energized Isolate the URD Cable on near end and leave grounded on far end. Test for de-energized cable on near end using Utility approved device before installing ST800. Connect ST800 to hot leg (X1 or X3) of secondary and center conductor of de-energized grounded primary cable. Using the STRCV probe at the open point, identify the de-energized cable via audible/visual tone. The de-energized cable will have an Audible/Visual tone in the opposite direction, as shown in slide #16, from the other conductors or the only Audible/Visual tone. Note: If no Audible/Visual tone is received from the STRCV, Bierer’s optional part# ACDM with the CT Clamp (part# Q110) can be adjusted for more sensitivity.

Testing IN/OUT Feed on Energized URD Primary Cable Attach Black lead to X1 hot leg bushing and Red lead to X3 hot leg bushing as shown in slide #19. Place the STRCV probe tip on each primary cable just below the elbow such that the cable rests in the concave section of the tip (as shown in slide #19) but not on the concentric neutral. An audible tone and a directional light will come on when the tip of the probe is on the cable being fed from the source. NOTE: The ST800 can be installed and left at the end transformer. At the next transformer, the directional light pointing “up” (as shown in slide #18) into the transformer indicates the cable from the end transformer and the directional light pointing “down” (as shown in slide #18) out of the transformer indicates the cable going to the next transformer back to the source. This process can be repeated all the way back to the riser pole.

Continue “upstream” to find the line and load primary cable

Features 9V Battery power handheld device (<1 lbs) Magnet for attaching to metal cabinets for hands free operation. IP67 rating for waterproof use. Voltage range is 10VAC - 500 VAC for testing very low voltage, three phase 277/480 customers, street light circuits, etc. Easily identifies poor neutral, i.e. cable tv, telco bonds Multipurpose device for quickly assessing power company vs customer issues, reduces RVM sets, identifies cables in the transformer, tests dead on URD primary circuits and identifies primary feed on transformers.