UITF Conduct of Operations Review

Slides:



Advertisements
Similar presentations
RF Safety Discussion Derun Li/Bob Rimmer Center for Beam Physics Lawrence Berkeley National Laboratory SRF Institute, JLab.
Advertisements

Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Bubble Chamber Planning Meeting 04 September
Electronic Cross-talk & Ground Loop Elimination in Injector Riad Suleiman Center for Injectors and Sources.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
Tuning an Accelerator for 1 MW C. Peters WAO 12 August 8 th, 2012.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
High Current Run I 2015 Feb 3 22:45 to Feb. 4 23:00 High Current Run II 2015 Feb 5 12:15 to Feb. 6 13:00 Current ~ 20 mA Approx. 40 trips, i.e. fast shutter.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Managed by UT-Battelle for the Department of Energy SNS BLM System Overview Detectors, Measurements, Simulations Alexander Zhukov Saeed Assadi SNS/ORNL.
MP Questions for LE eCooling. Why talk about this now? Is there additional equipment needed, not yet considered? (nor costed) Interfaces to systems that.
Machine Protection at the 1MW CEBAF Electron Accelerator and Free Electron Laser Facility Kelly Mahoney Presented at the Workshop for.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Re-scoping UITF Matt Poelker November 14, 2015.
John Carwardine 20 April 09 Preliminary planning for Aug/Sept studies.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility 1 Alex Bogacz UITF Beam-line Modeling (2) UITF Mtg. JLAB,
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
Low-Energy RHIC electron Cooling (LEReC) MPS meeting MPS Meeting April 21, 2016.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker April 12, 2016.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Internal Personnel Safety Review UITF Overview and Introduction Matt Poelker.
UITF Laser and Gun High Voltage John Hansknecht UITF Operational Review March 18, 2016.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker July 12, 2016.
Operations Machine Simulator.
RF acceleration and transverse damper systems
UITF MPS system requirements
Introduction: FCC beam dumping system
RF interlocks for higher intensities (LMC 15 June)
CEBAF Injector Update PREX/CREX March 3-4, 2017
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
XFEL Vacuum System Commissioning
Operational Experience - Field Emission
Notes on Machine Protection for long bunch trains
Jefferson Lab Low Level RF Controls
G0 Backward Angle Accelerator Preparations
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
UITF Project Status Meeting
CEBAF Injector Overview
UITF beamline installation
UITF Operational Review
LLRF and Beam-based Longitudinal Feedback Readiness
Upgraded Injector Test Facility
Machine Protection Xu Hongliang.
Interlocking of CNGS (and other high intensity beams) at the SPS
UITF MPS system requirements
Low Level RF Status Outline LLRF controls system overview
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Center for Injectors and Sources
Upgraded Injector Test Facility
Low Level RF Status Outline LLRF controls system overview
RF Local Protection System
A. Freyberg Aug 2016 ECT’16 =>
Uses of UITF 10 MeV spin-polarized electron accelerator, beam current up to 100 uA M. Poelker December 12, 2018.
Test of Booster at UITF Reza Kazimi (12/12/18)
Installation and Beam Test Schedule
07/08/2010 Fill #1264 dump at 02:14:38.
Upgraded Injector Test Facility
UITF beamline installation
Operation of Target Safety System (TSS)
RF introduction Anders Sunesson RF group leader
UITF Conduct of Operations Review
Presentation transcript:

UITF Conduct of Operations Review UITF Review #3 Machine Protection System Matt Poelker Wednesday, April 24, 2019

UITF Machine Protection System - what will it protect? Protect the QCM (we also call it “the booster”) Protect against beam loss and burn-through, maintain ultrahigh vacuum Protect viewers (this is a software interlock – Not a fast shutdown node, FSD) Protect magnets, ensure proper field for beam transport: comparator interlock, water flow or klixon interlocks Protect RF beamline components: vacuum and water flow interlocks Protect cups, apertures and dumps: water flow interlocks (and limit beam current via “operational restriction”) Protect the experiment, e.g., HDIce (mostly, this means putting the beam where it is supposed to go, limit beam current if necessary, protect against mis-steered beam) UITF Conduct of Operations Review - MPS

Hardware configuration Valves OPEN only when vacuum deemed acceptable Current limiting resistors in series with magnets Water flow interlocks at cups, dumps and apertures Window comparators on dipoles and gun HV Viewers inserted only when laser in pulsed-mode Water flow interlocks at buncher and chopper cavities, RF applied to chopper and buncher only when vacuum reads “good” Helium liquid level interlocked to klystron high power RF UITF Conduct of Operations Review - MPS

FSD Input Signals An FSD trip will shutter laser and sometimes close all valves BLMs will shutter laser: CEBAF-style BLM modules RF field control chassis with CEBAF-style FSD signals Vacuum FSD signals from QCM, helium liquid level interlocked to klystron control panel All beamline ion pumps ganged together, close laser shutter and close all pneumatic valves when pressure exceeds a setpoint Window comparators using 16 bit ADC cards designed by EES HDice “off target” detector (it will look like a BLM) UITF Conduct of Operations Review - MPS

What happens when there’s an FSD signal is triggered? UITF Machine Protection Ion pump values too high, then can’t OPEN valves. Close valves when ion pump current rises too high Chopper/Buncher Ion Pump current too high, can’t turn ON chopper/buncher RF, trip OFF the rf supplies Viewer IN, allow only Viewer Limited beam Water flow through apertures, cups and dumps OK BLMs trip OFF beam, close laser shutter. These can be maskable so we can tune up in Tune Mode Dipole window comparator on 15 degree ben magnet: no Laser when bend magnet current wrong Gun HV window comparator, no laser when gun HV set wrong UITF Conduct of Operations Review - MPS

Similar to CEBAF Safety System Group BLM chassis, x2 units New LLRF control boards, aka Field Control Chassis Cryo and SRF signals from QCM Window comparators using 16 bit ADC cards designed by EES FSD signals summed using VME boards with 12 input channels each FSD signals transmitted via fiber at 5 MHz SCAM to create low duty factor modes CEBAF style pockel-cell tune mode generator: RTP cell with <250ns response time, backed by shutter that closes 5-10ms later UITF Conduct of Operations Review - MPS

BLM locations UITF Conduct of Operations Review - MPS

(Songsheets = UED) MeV beamline UITF Conduct of Operations Review - MPS