XBID Overview ERI SWE region Madrid 06.10.2014 Supported by.

Slides:



Advertisements
Similar presentations
SWE IG Meeting Paris, CRE XBID Overview Supported by.
Advertisements

Roadmap for Sourcing Decision Review Board (DRB)
Disclaimer Some elements of the following presentation are extracted from documents approved by the 11 CWE Project Parties. However, this presentation.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
ERI SWE region Madrid XBID Overview Supported by.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
PCR Status report AESAG, September Supported by:
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
1 GRI NW Investment project in progress Cross-border gas transmission‏ Update on Investment project I1 GRI NW Focus at Virtual Test (Business Simulation)
1 page 1 C O U P L E D NWE Day Ahead Project Update FUI IG Mtg – London 13 th September 2010 ENTSO-E Regional Group Northwest Europe C O U P L E D.
19 October 2017 Overview The Management Board, at its December 2015 meeting, has endorsed the timeframe for the implementation of the EU clinical trial.
Joint Proposal for a Day Ahead Market Coupling Initiative between GB and Mainland by National Grid, RTE, ELIA and TENNET   Results of a joint study on.
Gas Regional Initiative South South-East
NWE Day-Ahead Price Coupling
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Status of Implementation of PCR for Day-Ahead Price Coupling
CallTower Implementation Process Overview
Cross Border Intraday on the North Italian Borders Interim solution 4th Stakeholder Group Meeting Rome, 15th May 2012.
Supported by: PCR Status report AESAG, September
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
NWE Day-ahead price coupling project Cost Issue
SWE Day- Ahead market coupling
Coordinated Market Coupling for GB
EU Implementation Programme
Context 12 TSOs in North West Europe (NWE) have commenced a project to facilitate a single price coupling across a region covering CWE, Scandinavia and.
Continuous Cross-Border Implicit Intraday Trade Status update
2009 TSO Transparency Gas Regional Initiative North-West
Regulators’ update on Congestion Management and Balancing
ESB Networks AIP Programme
NWE Day-Ahead Price Coupling
37th IG Meeting South Gas Regional Initiative
ACER’s view on the future role of the Gas Regional Initiative
Draft document – Work in progress
Supported by: PCR Status report AESAG, September
Change Assurance Dashboard
26th February 2015 Teleconference
37th IG Meeting South Gas Regional Initiative
ENTSO-E IT project for Fundamental Electricity Data Transparency
Amendment Invoice Task Force Progress Report
IS&T Project Reviews September 9, 2004.
Release 3 Plan Options Decision
Update to NLAG board 24th November 2015
CRUE – The Way Forward Vicki Jackson
37th IG Meeting South Gas Regional Initiative
Amendment Invoice Task Force Progress Report
26th February 2015 Teleconference
Cutover & Implementation Aggregated Programme RAG
Amendment Invoice Task Force Progress Report
X-DIS/XBRL Phase 2 Kick-Off
Release 3 Plan Options Analysis
Gas Regional Initiative South South-East
Overall Project RAG Status:
Portfolio, Programme and Project
Amendment Invoice Task Force Progress Report
Overall Project RAG Status:
Amendment Invoice Task Force Progress Report
Overall Project RAG Status:
ACER’s view on the future role of the Gas Regional Initiative
Overview of the recommendations on software updates
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Gas Regional Initiative South South-East
XBID – A review of our 1st year and future plans
Presentation transcript:

XBID Overview ERI SWE region Madrid 06.10.2014 Supported by

Agenda Joint project approach High level overview of current project status Review cycles of Business Blueprint Phase Tentative project timeline Update on Shipping and Nominations Key risks and issues Stakeholder involvement Summary and discussion Eurelectric Proposals on Quick Wins 2

Joint project approach Delivery of XBID involves 3 areas of distinct focus Design Implementation Local /Regional Implementation Projects (LIPS) Roadmap framework conditions satisfied Roadmap info from LIPs Framework for pre- & post coupling Co-ordinate implementation of Interim Solution At this meeting we continue the focus on the project under ESA which includes the current Blueprint phase Coordinate Design & Development of Interim Solution Blueprint Agreed XBID delivered Project under ESA Project under contract 3

High level overview of current status Step 2 Phase 1 successfully completed with sign-off of the Fact Book and agreement on the detailed timeline for the Business Blueprint. Phase 2 (4th August – 9th December) delivers the Business Blueprint which enables the XBID Solution to be developed. Power Exchanges (PX’s) and Transmission System Operators (TSO’s) are now reviewing the deliverables, using an agreed approach of review cycles, including: Functional Description Trading Module and Capacity Management Module (CMM); Various other IT specifications As a whole 11 documents, 600 pages. 4

Review Cycles of Business Blueprint Phase 5

High level overview of current status (2/2) ‘All Parties Cooperation Agreement’ (APCA) approved and formal signature process completed. The APCA includes the provisions for costs recovery and validation Cost reports (September 2012-2013, Q1-Q2 2014 and estimated financial forecasts) The updated budget for the remainder of the project will be provided to the NRA’s at the conclusion of the Business Blueprint Phase XBID solution contracts between PXs and DBAG and clarifications on Performance (Quality Plan) and Code Base (Equal Treatment) to be agreed during Phase 2 of the Business BluePrint. The Realistic Test Scenario (RTS) with a 2 second peak is underway with the test having been run w/c 18th August. Results from the test will be provided to PX’s on the week of 22th September. A workshop where DBAG will present the results of the RTS and their analysis will be held in early October. A second test exploring the performance limits of the system will also be arranged. Discussions on this test are due to commence with DBAG in early/mid-September 6

Tentative Project Timeline: May 14 – 4th Quarter 15 03.06.14 04.08.14 09.12.14 3M + 11M + 14M + ?? BBOP previous schedule Development of the local systems BBP(ESA Step 2 Phase 1) BBP(ESA Step 2 Phase 2) Development Test Contin-gency Go-Live Preparation ESA Step 2 Phase 1 + 2 take 1.5 months longer then planned + refers to on-going activities for integrated planning (not fixed yet) + refers to on-going activities for integrated planning (not fixed yet) + refers to on-going activities for integrated planning (not fixed yet) IAT UAT Emergency FAT I UAT Functional UAT Integration UAT Performance UAT Simulation Contingency FAT II Start 3M+ 4 M 5,5 M 6M+ 7M 8M 11M Completed Notes - High-level planning is subject to optimisation & detailed planning during ESA Step 2 The contingency can be used in any of the testing step (applicable for IAT, FAT, UAT). *Q4 does not include the contingency On-going Pending 7

Update on Shipping and Nominations The original number of potential options (8) was reduced. The 3 remaining options undergoing detailed evaluation are: A(+). Central Counter Parties (CCPs) doing the shipping (XB nomination and financial clearing) [discussed as interim solution] • Border to Border (B2B) only • Extension of Day Ahead principles • On all borders, no cross border nomination is required by the TSOs to the CCPs B. Central shipper doing the shipping (XB nomination and financial clearing) [discussed as enduring solution option] • Hub to Hub (H2H) approach C. Central physical shipper doing the physical shipping, CCPs doing the financial shipping [discussed as enduring solution option] • (Virtual) Central physical shipper doing XB nomination under an H2H approach • CCPs in charge of financial shipping under a B2B approach The selection of the S&N Solution is on the critical path. 8

Key risks and issues 9 Issue/Risk Potential Impact Status / Resolution a) Potential of delay in agreeing a 2nd Realistic Test Scenario (RTS). In terms of SLA DBAG interprets the RTS as exceeding the RFO/Offer in several areas. b) Also risk that separate Code Base issue (Equal Treatment) is not easily or quickly resolved. Medium impact on the cost of the project if higher commitment needed First RTS now underway with 2 second peak. PX’s want to explore the solution’s performance limits with a 2nd test. Due to resource constraints in DBAG in running the 1st RTS discussions on the 2nd test cannot commence until Sept. If agreement is not quickly reached this could impact sign off of the BBP. This has been highlighted to parties involved. Risk 1 b) Additional questions being agreed for legal co. VBB to answer reference competition law compliance 2. Need to agree a joint PX/TSO position on key aspects of Pre- and Post- Coupling & Local Implementation Projects Lack of coordinated approach/agreement on way forward leads to delay of completing the Business Blueprint Pre- and Post- Coupling Task Force in place with regular joint meetings and workshops. Plan in place. Discussion and evaluation underway on options and whether an interim step should be taken to achieve the final end state . 3. Interim Steps to implement the Intraday market draw resource and focus away from delivering the XBID main solution. XBID solution implementation is delayed Evaluation of potential interim steps including assessment of the impact on the main XBID project, aspects of equal treatment etc. was undertaken – risks were identified Eurelectric quick wins being considered for local borders Lack of progress in co-ordinated planning of Local Implementation Projects (i.e. NWE+ roadmap) due to : Possible PX competition issues seen by some PXs Lack of agreement on key aspects on pre- and post coupling (see Issue/Risk #2) Coordination issues leading to delayed local go-live dates TSO’s help facilitate development of the Local Implementation Projects taking into account the PX’s competitive environment Early agreement on the key aspects of the pre- and post-coupling design (see Issue/Risk #2) Identify and mitigate any competition law restrictions applying in the context of any Local Implementation and their consequences in terms of overall NWE+ co-ordination/subsequent roadmap creation No timely (before 25/09) decision on the Shipping and Nomination solution, means that the PPC TF has to continue evaluating options in parallel. Less time for a) detailing the final S&N solution and b) providing a thorough review of the DBAG deliverables The remaining three S&N solutions are being evaluated in terms of quality, costs and time to market. A distinction is made regarding potential interim and enduring solutions. 9

Stakeholder involvement A communications Task Force has been established. User Group meetings are planned to be organized starting mid-October in order to inform and involve stakeholders on project developments on: Project status and timeline Solutions for Shipping and Nomination Elaboration on the XBID platform The AESAG meeting participants are welcomed to provide their interest for participating in the User Group meetings, by sending and email to: tbus@e-bridge.com 10

Summary and discussion Delivery of ESA Step 2 Phase 1 has been successfully concluded. ESA Step 2 Phase 2 has commenced with detailed review of Business Blueprint deliverables underway Regulatory reports of historical and current year costs are being prepared together with an estimated forecast. Submission to NRA’s on 9th September Further work has been completed on evaluation of Shipping & Nominations options Quick win proposals by Eurelectric on specific borders has been evaluated by local parties Risks/issues continue to be identified and managed The project remains on track to complete the Business Blueprint phase by 9th December although this is dependent on: Reaching agreement with DBAG on the contract Reassurance on solution performance from the Realistic Test Scenarios Agreement on the separate code base issue/competition law compliance 11