Engineering Services New Delhi Engineering Services 17.01.07.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Symantec 2010 Windows 7 Migration Global Results.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
APPA CEO Roundtable Phoenix, AZ March 15, 2011
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 3 CPUs.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Tennessee Higher Education Commission Higher Education Recommendations & Finance Overview November 15, 2012.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) FAR.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Break Time Remaining 10:00.
KARACHI FASHION WEEK CHAPTER 3 JANUARY 27 – 30, 2011 FASHION RUNWAY SHOW FASHION RUNWAY SHOW BRAND PRESENTATIONS BRAND PRESENTATIONS FASHION BRANDS EXHIBITIONS.
Analyzing Transactions
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
October 22, 2010; Tallinn, Estonia Cosimo Garofalo III ESTONIAN NUCLEAR POWER CONFERENCE.
PP Test Review Sections 6-1 to 6-6
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
15. Oktober Oktober Oktober 2012.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Equal or Not. Equal or Not
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

Engineering Services New Delhi Engineering Services 17.01.07

Presentation Sequence Company Profile Engineering Services, ONGC Assets Created Typical Offshore Facilities Assets under Creation/Renewal Assets Creation – Under Tendering Asset Creation – Future Plan Contd . . Engineering Services

Company Profile MSP Engineering Services

ONGC’s Strategic Vision 2001-2020 To focus on core business of E&P Doubling reserves (i.e. accreting 6 billion tonnes of O+OEG) by 2020; out of this 4 billion tonnes are targeted from the Deep-waters. Improving average recovery from 28% to 40%. Equity Hydrocarbon from abroad. SH Engineering Services

Financial Status (2005-06) ONGC posted a net profit of Rs. 14431 Crores, the Highest by any Indian Company. Practically zero debt Corporate. Contributed over Rs. 23376 Crores to the exchequer. Highest ever Dividend of Rs. 6417 Crores by any Indian Corporate. Engineering Services

Recognition in Last 12 Months ONGC became the NO. 1 E&P Company in the World and 20th among leading Global Energy majors as per Platts Top 250. ONGC became the first Central Public Enterprise to receiver the designated national authority for its clean development mechanism under the Kyoto Protocol. ONGC was conferred the “Golden Peacock Award for Corporate Social Responsibility in Emerging Economics, 2006. Engineering Services

Recognition in Last 12 Months ONGC secured the NDTV Profit Business Leadership Award in the Oil and Gas Category, handed over by the Hon’ble Prime Minister of India. ONGC was awarded the highest-ever Credit Rating for any Indian corporate by the International Credit Rating Agency Moody’s Investor Services. FY06 performance of ONGC has been rated ‘Excellent’ by the Department of Public Enterprises. ONGC has become the first PSU to get ISO 9001-2000 Certification from DNV for Internal Audit. Engineering Services

Engineering Services ONGC Engineering Services

Engineering Services, ONGC Engineering Services is responsible for creating facilities for exploitation & transportation of hydrocarbons. To meet the above objectives, Engineering Services undertakes following activities:- Engineering Construction Facility Renewal Marine Surveys MSP Engineering Services

Engineering Services, ONGC Activities Works(ISO-9001-2000 Certified) Tendering & Award of EPC Contract Contract Execution including Project Management Engg. & Construction related Surveys. Design(ISO-9001-2000Certified) Engineering Consultancy Facility Optimization Technological Upgradation Maintenance Management Engineering Services

Engineering Services, ONGC Offshore Process Platforms Well Platforms Clamp-on structures on existing Platforms Submarine Pipelines (trunk line, in-field lines) Offshore Power Generation/Submarine cabling etc. Onshore GGS/GCS CTF ETP Mini Refineries Pipelines Power Generation BHS SA PF Engineering Services

Projects Execution Strategy Major Works Centers of Engg. Services Western Region North Eastern Region Assets: Ahmedabad, Ankleshwar, Mehsana Projects Execution Strategy Assets: Assam, Tripura Mumbai Region Central Region Assets: Mumbai High, Bassein & Satellite, Neelam & Heera & Engineering Services Southern Region Assets: Karaikal, Rajamundary Engineering Services

Projects Execution Strategy Major Works Centers of Engg. Services Western Region North Eastern Region Assets: Ahmedabad, Ankleshwar, Mehsana Projects Execution Strategy Assets: Assam, Tripura Mumbai Region Central Region Assets: Mumbai High, Bassein & Satellite, Neelam & Heera & Engineering Services Southern Region Assets: Karaikal, Rajamundary Engineering Services

Assets Created Engineering Services

Assets Created Western Offshore Process Platforms : 34 (upto pre-monsoon’06) Western Offshore Process Platforms : 34 Well Platforms : 146 Clamp-on : 66 Submarine P/L (Kms) : 4500+ Eastern Offshore Well Platforms : 4 Neelam Process Complex Contd . . Engineering Services

Growth of Process Platforms Nos. IC Complex * For one year Engineering Services

Growth of Well Platforms Nos. * For one year Engineering Services

Growth of Clamp on Structures Nos. Engineering Services

Growth Of Pipelines Kms. * For one year Engineering Services

Typical Offshore Facilities Engineering Services

Typical Well Platform Requirements Structural Steel 2000 to 3000 tonnes Submarine Pipelines 15-20 Km (4” to 18”) WF/WI/GL Other Items Valves Vessels Batteries Line Pipes CP Systems Shutdown Systems Composite Materials Solar Power Systems Life Support Systems Personal Safety Systems Fire Detection & Protection Systems Electrical, Instrumentation & Fiber Optic Cables. Engineering Services

Typical Process Platform Requirements Structural Steel - 4000 to 5000 tonnes Line Pipe - 40 to 50 Km from interconnecting WF/WI/GL Cables (Elect. & Instt.) - 200 Km Other Items Pipes Valves Vessels DCS PLC UPS & Batteries HVAC Systems CP Systems HT Panels LT Panels Composite Material Pipeline Coatings CCTV Systems Paging & Intercoms Gas Turbine Generator Process Gas Compressor MOL Pumps & Water Injection Pumps Air Compressors Solar Power Systems Fire Detection & Protection Systems Produced Water Treatment Systems Life Support &Personal Safety System Electrical, Instt. & Fiber Optic Cables. Engineering Services

Assets Under Creation / Renewal Engineering Services

Asset Under Creation Facilities Value : US$ 1844 M (Rs. 8378 Crores) Process Platform : 2 (BCP-B2 & Vasai East ) Well Platforms : 16 (Heera Re-Development, C-Series, WPP-1 & 2) Submarine Pipelines : 267 Kms Value : US$ 1844 M (Rs. 8378 Crores) Engineering Services

Asset Under Creation Sl. No. Project Description Value Completion 1 BCP-B2 Gas Compressor Platform US$ 283 M (Rs. 1300 Crs.) 29.02.2008 2. Vasai East Process-cum Booster Compressor Platform Well Platform US$ 456 M (Rs. 2117 Crs.) 02.04.2008 3. WPP-I US$ 239 M (Rs. 1000 Crs.) 04.04.2007 4. WPP-2 US$ 189 M (Rs. 866 Crs.) 19.04.2007 5. C-Series Well Platforms US$ 388 M (Rs. 1791 Crs.) 20.04.2008 6. Heera Re-development Well Platforms & Pipelines US$ 289 M (Rs. 1304 Crs.) 30.04.2008 Engineering Services

Asset Under Renewal Facilities Awarded Cost : US$ 639 M Process Platform : 1 (SH-RC) Well Platforms : 26 Pipelines : 239 Kms Awarded Cost : US$ 639 M (Rs. 2855 Crores) Engineering Services

Asset Under Renewal Sl. No. Project Description Value Completion 1. 26 Well Platforms Revamp of un-manned platforms in Mumbai High US$ 71 M (Rs. 330 Crs.) 30.04.2007 2. SH Revamp Revamp of SHP Platform US$ 42 M (Rs. 194 Crs.) 15.04.2007 3. PRP Replacement of Old Pipeline US$ 526 M (Rs. 2330 Crs.) 30.04.2008 Engineering Services

Asset Creation (Under Tendering) Engineering Services

Project under Tendering Facilities Process Platforms : 1 (New MHN) Clamp-on Project : 1 Pipeline : 24 Kms. (UTG) Estimated Cost : US$ 904 M (Rs. 4160 Crores) Engineering Services

New MHN Process Platform Process Platform having following facilities:- Oil Handling : 48000 BOPD Gas Handling : 6.8 MMSCMD Water Handling : 215000 BOPD Living Quarters : For 220 Persons Flare Jacket : Pipeline : 100 Kms Modification of Existing : 14 Nos. Platforms Estimated Cost : US$ 821 M (Rs. 3776.6 Crores) Schedule Completion : April, 2010 Engineering Services

20” Gas Line between Uran & Trombay Laying of 20” pipeline between Uran Plant and Trombay Terminals Total Length : 24 Kms Onshore Area – 8.1 Kms Offshore Area – 8.4 Kms Marshy Area – 7.5 Kms Estimated Cost : US$ 52.4 M (Rs. 235 Crores) Schedule Completion : 31.05.2008 Engineering Services

6 – Clamp-on Project Installation of Clamp-on Structure alongwith Modification works in Mumbai High Well Platforms. WA Platform WB Platform WI-6 Platform IN Platform IP Platform Estimated Cost : US$ 31 M (Rs. 148.5 Crores) Schedule Completion : 29.02.2008 Engineering Services

Asset Creation:Future Plans Engineering Services

Future Business Plan Offshore Onshore Project - 11 Nos. Indicative Cost - US$ 3986 M Onshore Project - 9 Nos. Indicative Cost - US$ 2284 M Engineering Services

Asset Creation Future Plans - Offshore Sl. No. Project Description Indicative Cost Completion 1. B-22 Platforms Well-cum Process Platform, Well Platform, Pipelines & Modifi. US$ 360 M (Rs. 1650 Crs.) 28.02.2010 2. B-193 Platform US$ 406M (Rs. 1870 Crs.) 01.03.2010 3. B-Series Gas (MH) Platform Well Platform & Pipeline US$ 290 M (Rs. 1330 Crs.) 30.04.2010 Engineering Services

Asset Creation Future Plans-Offshore Sl. No Project Description Indicative Cost Completion 4. Grid Inter Connectivity Grid Inter connectivity of 26 Well Platforms with Process Platforms US$ 175 M (Rs. 850 Crs.) 30.04.2010 5. Conversion of Sagar Samrat Conversion of Sagar Samart to MOPU US$ 75 M (Rs. 345 Crs.) 01.03.2009 6. Pipeline Replacement Project Rolling Plan for replacement of old pipelines US$ 450 M (Rs. 2025 Crs.) 31.03.2011 7. Re-Re-Devlop plan of MH Process & Well Platforms in Mumbai High US$ 1340 M (Rs. 6164 Crs.) Not yet firmed up Engineering Services

Future Revamp Projects:Offshore Sl. No. Project Description Indicative Cost Completion 1. 30 PLF. Revamp Revamp of 30 well head platforms in MH & N and H US$ 85 M (Rs. 400 Crs.) 30.01.2010 2. Revamp of WIN, WIS, ICW & SHW PLF. Revamp of Water Injection Platforms of Mumbai High US$ 400 M (Rs. 1840 Crs.) 30.04.2010 3. Revamping Well-head of PLF. 3rd Phase of revamp of Well-head Platforms US$ 85 M 30.04.2009 4. Revamp of Neelam & Heera Platforms Revamp of NLM,HRG & HRA Process Platforms and 13 Well Platforms US$ 320 M (Rs. 1470 Crs.) 15.05.2009 Engineering Services

Future Business Potential : Onshore Sl. No. Project Description Indicative Cost Completion 1. Assam Renewal Project Revamp of existing facilities in Assam Asset US$ 550 M (Rs. 2500 Crs.) 30.01.2010 2. Western Onshore Renewal Revamp of existing facilities in Western onshore Asset US$ 650 M (Rs. 3000 Crs.) 30.12.2010 3. Tripura Power Plant 1000MW Power Plant in Tripura US$ 870 M (Rs. 4000 Crs.) - 4. GCS and Trunk Pipeline GCS and Trunk pipeline in Tripura Project US$ 40 M (Rs. 180 Crs.) 31.12.2008 5. Refinery and new facilities Refinery and new facilities at Rajahmundry US$ 31.5 M (Rs. 148 Crs.) 31.05.2009 Engineering Services

Future Business Potential : Onshore Sl. No. Project Description Indicative Cost Completion 6. Cauvery Asset New Facilities at Karikal US$ 31 M (Rs. 145 Crores) 31.03.2010 7. Ahmedabad Asset Construction of 3 GGS US$ 25 M (Rs.120 Crores) 31.05.2009 8. Mehsana Asset Construction of 4 GGS and 1 ETP US$ 40 M (Rs. 185 Crores) 9. Ankelashwar Asset Construction of GGS, ETP, CPF etc. US$ 47 M (Rs. 225 Crores) 30.04.2010 Engineering Services

Expectation from the Industry Competitive and Clean bids. All BEC requirements to be addressed. Proven Technology No deviations Functional specifications are given in ONGC Tender, ONGC expects bidders to use this flexibility to provide:- Cost effective solution Optimized Design New generation of equipment ONGC is following Three Tier Safety System during Offshore Construction, it expects all statutory SHE considerations/ requirements are followed during execution for Crew Vessel Equipment Procedure Engineering Services

Thank you Engineering Services