TRICS AUSTRALASIAN DATABASE WORKSHOP

Slides:



Advertisements
Similar presentations
EUCLID Student Award Processing Preview Demonstrations Student Systems Presented by Matthew Taylor Student Systems.
Advertisements

Kevin Travers, Hampshire County Council.  TRICS Launched in 1989  TRICS and TRAIDS merged in  GENERATE Group joined TRICS in 2007  TRICS and.
August 2014 Liver quest User Demo: Liver Quality Enhancement Service Tool (QuEST)
1 Unit & District Tools Phase 1. 2 To access the new Unit and District Tools, you will need to click on the link embedded in the MyScouting Flash page.
Kendle Implementation of Clinical Data Acquisition Standards Harmonization Dr Elke Sennewald Kendle 9th German CDISC User Group Meeting Berlin, 28 September.
Ian Coles, TRICS Project Manager, JMP Consultants Limited.
7 Day Self Assessment Tool (7 Day SAT) User Guide v7 (June 2015)
2015 ANNUAL USER SURVEY Nick Rabbets Managing Director – TRICS Consortium Limited.
ONLINE CLAIMS TRACKING
How to Fill Out the CARD Form (Course Assessment Reporting Data Form)
Upay User Guide
Introduction to our On-Line Self Service Center at
DWINSA 2007 Website. Website Purpose Allow states to track status of questionnaires Allow systems >100K or states to upload project data.
Introduction to Excel Line Graphing The ‘Quick’ and ‘Easy’ guide to using Microsoft Excel for Line Graphing * Created by: Bunch of BHS science teachers.
240-Current Research Easily Extensible Systems, Octave, Input Formats, SOA.
Microsoft ® Office Excel 2003 Training Using XML in Excel SynAppSys Educational Services presents:
Mtivity Client Support System Quick start guide. Mtivity Client Support System We are very pleased to announce the launch of a new Client Support System.
3M Partners and Suppliers Click to edit Master title style USER GUIDE Supplier eInvoicing USER GUIDE The 3M beX environment: Day-to-day use.
The 2016 TRICS User Survey and Forthcoming System Developments Nick Rabbets, Managing Director, TRICS Consortium Limited.
Google Chromecast download Update Via Preview Program BE THE FIRST TO ACCESS THE NEW FEATURES.
Adding Students in EbD-BUZZ
Dissertation Guidelines for Students MSc in Econ; MSc EIFE 2016/2017
The 2017 TRICS User Survey and Forthcoming System Developments
Nick Rabbets Managing Director – TRICS Consortium Limited
WeatherSTEM Data Mining Tool
Unit & District Tools Phase 1
What’s New in ProMonitor 9
Using Wikis to Facilitate Collaborative Research Projects
The TRICS Good Practice Guide Revised
ePartner Portal for A/C Managers -
Poole CPD Online - Lisa Tickhill
User Habits & Trends – An analysis of how TRICS is used
WorkIT SQA Work Placement Units & Pupil Questionnaires.
Standard Operating Procedure
Good Practice: Hints & Tips on Everyday Use of TRICS
ERO Portal Overview & CFR Tool Training
COMMISSIONED TRICS SURVEYS & THE TRICS BUREAU SERVICE – AN UPDATE
Mike Green Surrey County Council
How to Use Members Area of The Ninety-Nines Website
Collaboration with Google Docs
TDB Database Internet Access
Adding Students in EbD-BUZZ
Introduction to EbD-BUZZ for EbD Teachers
New Functionality in ARIN Online
Using the Online Ag Business Planning Tool “AGPLAN
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
Getting Started and working with Pearson myautomotivelab
CO1301: Games ncepts 2016 Lecture 2
Trip Generation Case Studies Residential & Employment
Using Your PSAT/NMSQT® Scores to Increase College Readiness
The MIS and Dashboard.
ZIMS Charts, Maps & Data Management
Teacher Learning Communities
TRICS SYSTEM DEVELOPMENTS FOR DECEMBER 2018
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Analysing your pat data
Updating the TRICS Good Practice Guide for 2019
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Student Pathways Survey 2009 Principals
Geoffrey Cheung IME Winter 2010
Getting started – Example 1
Phase one demonstration
Reporting 101 Keenan & Mona.
CFR Enhancement Session
The 2019 TRICS User Survey and Forthcoming System Developments
TRIP RATE CHANGES OVER TIME: AN EXAMINATION OF MAIN TRICS LAND USES
THE TRICS GOOD PRACTICE GUIDE & ITS NEXT MAJOR UPDATE
The Taxidermy Studio of Alfred Giles
Neonatal Workload Tool standard BOXI reports
Presentation transcript:

TRICS AUSTRALASIAN DATABASE WORKSHOP Nick Rabbets Managing Director - TRICS Consortium Limited

Quick recap TRICS & TDB working together since 2014 to have an Australasian Database Legal Agreement Signed in April 2017 Australasian System to be separate so that data from different regions can not be combined Phase One – System to Contain Historic TDB Data Phase Two – System to include TRICS Methodology Surveys, in 15 minute intervals Ongoing Survey Programme by TRICS & TDB A quick recap of what has been undertaken to date with regard to the Australasian Database. Since 2014 TRICS and TDB have been working together to create a siloed database for your historic data. The legal agreement was signed in 2017 which formally started the development of a two phase project. It was agreed at an early stage that the Australasian system should be siloed, this ensures that incompatible data can not be combined and also enables the database to be very much Australasian centric in its design. Phase One of the system is to contain the historic data already contained within an Excel spreadsheet, this has been quite problematic, as the data is not in our usual TRICS format, as you will see later in this presentation. Phase Two of the system is to be more akin to the TRICS UK system, 12 hour counts (undertaken in 15 minute intervals). Once Phase Two has been completed there will be a continuing survey programme by TRICS and TDB to undertake TRICS surveys within the region.

Phase one completed Historic TDB Data included within the Australasian Database Extensive BETA Testing undertaken by TRICS & TDB System Released in Australasia on 17th September 2018 It has taken a while to get this phase completed, as the data is very different to TRICS’ standard format. Extensive Beta Testing was undertaken by TRICS and TDB to ensure that the system was working properly and that all the niggles had been ironed out and we have now got a system which uses mainly single hour surveys into a form that is more TRICSesk. The system was released to the Australasian TDB members in September 2018.

Site Selection Screens and Icons are the same within both systems Quick Screen shot showing the Map feature and the location of the Fast Food sites on the system. There are actually 76 sites here, but due to the vast nature of the region covered it looks a lot less from the dots on the map. As you can see these screens are very much the same as we have within the UK system. Map Feature – Showing Residential Dwellings within system. 76 Shown but looks less due to the vastness of the region.

As you can see in this Phase One System, the Location Details Screen is very similar to the UK version. However, due to the Historic data only containing limited survey data the Survey Days screen has had to be changed so that it can handle limited data sets. Phase two of the system will contain 12 hour counts, so these sites will be more akin to the UK format. I will be undertaking a very quick Phase One demo shortly

Phase two TRICS & TDB to agree Survey Methodology suitable for Australasian Region This is very close to completion, with only a few points now to agree Amend System to enable Australasian TRICS Surveys to be hosted The final version of the database will be very similar to Phase One, with only a few changes to ensure that full 12 hour counts can be utilised. Undertake new Methodology Surveys Counts to be undertaken in 15 minute intervals with the option within the database to undertake calculations in 60, 30 and 15 minutes intervals Release System As you will probably guess, although very similar in nature, the Surveys within the region will be different to the UK. Vehicle types might be slightly different, the land-uses used within the UK or not compatible to those in Australasia and different questions regarding population densities and public transport provision may be changed. However – it would appear that this part of Phase Two is very near to completion, with only a few points to agree, hopefully during my visit. One area that is going to be trailed within the phase two system is the provision of 15 minute survey intervals. As soon as the survey methodology has been agreed and the data upload facility has been amended to reflect the changes we will start to commission the data collection within the region. System Release – this will very much depend upon the changes required. However, initial discussions appear to suggest that only slight modification to the already operational Phase One system is required to enable full 12 hour surveys to be available.

Phase two – expected changes 2 So we now move to what you will be able to expect from Phase two of the system. The main areas will not change much from the Phase one database. However, it will include the following. 12 Hour Counts – undertaken in 15 minute intervals. 15 Mins 30 Mins 1 Hour

Phase two – expected changes 2 We are intending to undertake Multi-Modal surveys within Australia and New Zealand. This slide shows how we deal with this in the UK, so it’s easy to see the types of vehicles that are now being covered within UK surveys and how you can select information from each individual main mode contained within the surveys. There will of course be differences within this area, as some of the transport modes are not the same. By selecting the “Estimate Trip Rates” Box you can undertake a simple calculation based upon the average trip rate calculation. This facility may become extremely useful if we start to look at TRICS Exports into standard outputs for other packages, such as junction analysis tools. In this instance you will see I have input 7000 m² into the revealed box and the shaded columns show the total number of trips generated for each time period selected.

Phase two – expected changes Here we have the rank order list. You can select the time range for this table, IO have selected 17:00-18:00 in this instance. The yellow highlighted column shows how the sites are ordered. The two blue highlighted rows show the 15th and 85th percentile sites. By clicking the “Scatter Plot” Icon you get the information in graph form. This enables the user to look to see how the trip rates for each site relate to each other. By clicking on one of the red dots you will be taken to the detailed site screen.

Phase two – expected changes So here we have the survey selection screen, where if you select “Graph” you will see how the trip rates for each site compare to each other. This is a great facility to use to see if there are any unusual sites.

Data collection TDB/TRICS Survey Working Group Devise a joint programme of surveys for 2019 & 2020 Data Collected using TRICS Australasian Survey Methodology to ensure consistency within the database. Minimum of 12 hour counts User feedback upon Surveys is always appreciated and can help to achieve a good survey programme To ensure that the regions specific needs are met TDB’s Survey Working Group will work closely with TRICS to ensure that the surveys undertaken are the most important for the region. It is hoped that we can start to devise a programme of surveys for 2019 and 2020 to ensure that we get a good amount of data within the system as soon as possible. 12 hour counts will be the minimum undertaken, at some developments surveys may even be longer. In the UK some Food Superstores have been surveyed for 18 hours. We hope to involve user feedback with regard to this aspect as well, so if you have ideas of particular sites or just a particular land use that you think needs specific attention please let us know.

System development The TRICS Database System has always been led by it’s users. TRICS and TDB are keen to keep this aspect within this region. Annual User Survey sent out in March each year – need to register with our MailChimp system to ensure you receive information. Send System Development suggestions via Annual Survey or Direct via email to us at any point. It is important for all users to know, that although your are on the other side of the world, TRICS looks after its users and encourages feedback and suggestions. It’s the only way we have kept the system progressing and up to date.

Phase one system demonstration

questions nick.rabbets@trics.org www.trics.org Feel free to contact me direct: nick.rabbets@trics.org www.trics.org