Objective Revie the Cooling Cycle Learn about air distribution systems

Slides:



Advertisements
Similar presentations
HVAC 13a CNST 305 Environmental Systems 1 Dr. Berryman
Advertisements

Chapter 3. HVAC Delivery Systems
HVAC Basics Bin Yan HVAC – Heating, Ventilation, Air-conditioning.
HEALTHCARE BUILDING AUTOMATION
Heating, Ventilating, and Air-Conditioning
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Foundations of Real Estate Management BOMA International ® Module 3: Building Operations I Heating, Ventilating, and Cooling the Building ®
Foundations of Real Estate Management TM BOMA International ® Module 3: Building Operations I Heating, Ventilating, and Cooling the Building.
Components of HVAC System
VAV DESIGN FOR IMPROVED INDOOR AIR QUALITY. “Air conditioning is the control of the humidity of air by either increasing or decreasing its moisture content.
Objectives Finish with ducts and fans Define project topics.
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
Announcement Course Exam October 6 th (Thursday) In class: 90 minutes long Examples are posted on the course website.
Active beams versus VAV with Reheat Analysis of May 2013 ASHRAE Journal article Ken Loudermilk Vice President, Technology & Developement.
Objectives Finish with Multizone Systems
AIR CONDITIONING SYSTEMS 1. All Air Systems An all-Air System is defined as a system providing complete sensible and latent cooling capacity in the cold.
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Objectives Review/Learn about HVAC Configurations Describing systems and processes in the psychrometric chart Analyze processes in AHU and buildings –Finish.
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
Lecture Objectives: Model processes in AHU –Use eQUEST predefined models –Use detail modeling Define your topics for your final project.
Equation solvers Matlab Free versions / open source codes: –Scilab MathCad: Mathematica:
Important variables Water: Air: Conversion:
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
STUDY ON HVAC SYSTEM STUDY ON HVAC SYSTEM
Lecture Objectives: Finish with software intro HVAC Systems
Course project presentation Thursday in class Timing: 4 minutes (strictly controlled) Approximately 1 PowerPoint Slides per minute Content Problem Introduction.
Objectives Analyze processes in AHU and buildings.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
Announcements 1) Thursday 02/09 In class Midterm Exam - I will be in the classroom at 9:20 AM - Example and solution are posted on the course website 2)
Introduction to Energy Management. Week/Lesson 7 HVAC System Types.
Final Projects Grading criteria is posted on the course website Preliminary results are due Next Tuesday Final Project delivery on Monday Dec. 7 th –Final.
Announcement Course Exam November 3rd In class: 90 minutes long Examples will be posted on the course website.
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
Lecture Objectives: Differences in Conduction Calculation in Various Energy Simulation Programs Modeling of HVAC Systems.
Final Project I need your proposal about the final project! It should include –Title –Group members –Objective –Short description –Methodology –Expected.
Objectives Propose residential system related final project –Compare VAV systems with DOAS systems.
HCB 3-Chap 19B: All-Air_Multizone_Reddy1 Chapter 19B: ALL-AIR SYSTEMS FOR MULTIPLE SPACES Agami Reddy (July 2016) 1)CAV terminal reheat 2)CAV multizone.
HCB 3-Chap 19A: All-Air Systems_Single Zone 1 Chapter 19A: ALL-AIR SYSTEMS: SINGLE ZONE AND SINGLE DUCT Agami Reddy (July 2016) 1)Introduction and common.
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Objectives Finish analysis of most common HVAC Systems
Technology in Architecture
Lecture Objectives: Continue with air-conditioning (psychrometric)
ZONING (see section 17.0) Zoning alternatives Constant Volume (CV)
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Types of HVAC Technology Used in Business Establishments
Lecture Objectives: Answer questions related to HW 4
Lecture Objectives: Finish HW3 Discussion
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Lecture Objectives: Answer questions related to HW 4
Chilled Beam Performance:
Objectives Continue with advance HVAC systems
Objectives Psychometrics Psychometrics of AHU.
HCB 3-Chap 19A: All-Air Systems_Single Zone
Chapter 19B: ALL-AIR SYSTEMS FOR MULTIPLE SPACES
VAV DESIGN FOR IMPROVED INDOOR AIR QUALITY
Frenger “Radiant” chilled beam performance at 1 Shelly St - Sydney
Objectives Psychometrics Psychometric chart Examples in AHUs.
Objectives Plot processes in AHU and buildings on psychrometric chart
Lecture Objectives: Discuss HW4 parts
FBE03: Building Construction & Science
Announcements Exam 1 Next Class (Thursday, March 14th):
Objectives Processes in Cooling towers and AHUs.
Objectives Psychometrics Psychometric chart Examples in AHUs.
Presentation transcript:

Objective Revie the Cooling Cycle Learn about air distribution systems Define Building Zones Solve part of HW3

Zones In building How to define the zone in building Based on cooling/heating load requirement Based on ventilation requirement Based on use of buildings – different apartments deferent zones

Air Handling Units (AHU) Control of air Systems Provide conditioned air Heating, cooling, humidification, dehumidification Ventilation Provide fresh air, remove contaminated air

Air Handling Unit (AHU) Roof top AHU Gas/Electric Heater to building Fan air from building fresh air Evaporator filter mixing AHU schematic Exhaust From room Return fan flow control dampers Supply fan Compressor and Condenser Fresh air To room Outdoor air hot water cool water

Air Handling Units (AHS) Equipment For AHU: Fans Cooling and heating coils Combustion heat exchangers Filtration Dampers, controls, mixing valves Humidification: steam/spray Dehumidification: cooling coil/desiccant Noise control

Control of air Systems Vary temperature, constant flow Constant temperature, vary flow Vary temperature, vary flow

Constant Temperature, Variable Volume On-off systems Residential and small commercial Vary volume by turning system on and off

Constant Air Volume Single zone constant air volume Fan always runs Vary temperature of air in response to space thermostat Single zone constant air volume with reheat Often used for precise humidity control Multizone constant air volume with reheat Good humidity control, flexible Not very efficient

Multizone constant air volume with reheat 55°F 62°F Require less cooling

Variable Air Volume Single zone VAV Multizone VAV Can also use reheat Varies air flow based on room thermostat Multizone VAV Central chilled air supply Zone thermostats control flow to each zone Can also use reheat Still need to provide adequate air flow for ventilation and for comfort Smaller energy penalty than CAV

VAV terminal

Multizone VAV 55°F Vary the flow

Reading Assignment Tao and Janis Chapter 3 Chapter 6 (from 6.1 to 6.7)

Homework Assignment 4 Table 1 Results of cooling load calculation and required amount of fresh air for ventilation Zone 1 Zone 2 Zone 3 Whole building Sensible cooling load for zone Time when the max cooling load appear 41000 Btu/h at 4 PM 45000 Btu/h at 6 PM 27000 Btu/h at 8 AM 92000 Btu/h Sensible cooling load for critical hour for whole building (6 PM) 37000 Btu/h 9000 Btu/h Latent cooling load (internal sources + infiltration) 5400 Btu/h 5200 Btu/h 16000 Btu/h Required amount of fresh air based on number of occupants 240 CFM (12 occupants) 520 CFM (26 occupants) 1000 CFM (50 occupants)

Homework Assignment 3 Supply air 55°F Recirculation air 76°F Fresh air (Dallas, TX) DBT=102°F