Chapter 11 Aggregate Planning. Production Planning in Manufacturing.

Slides:



Advertisements
Similar presentations
A Multiperiod Production Problem
Advertisements

PowerPoint Presentation
Who Wants To Be A Millionaire?
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Sales and Operations Planning
Sales and Operations Planning (Aggregate Planning)
Capacity Management Planning the resource capacity that a firm will need to meet its demand.
Master Scheduling and Rough-Cut Capacity Planning
Industrial Facilities Design (7 th Term, Batch 2009)  28/3/2012 11  lectur # 31 & 32.
HA 7712: Human Resource Management Professor Sturman, Spring 2010 Human Resource Planning February 23, 2010.
Business Processes Sales Order Management Aggregate Planning Master Scheduling Production Activity Control Quality Control Distribution Mngt. © 2001 Victor.
Operations Management Contemporary Concepts and Cases Chapter Twelve Capacity Planning Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
© 2004 Prentice-Hall, Inc. 8-1 Chapter 8 Aggregate Planning in the Supply Chain Supply Chain Management (3rd Edition)
Operations Management Dr. Ron Tibben-Lembke
Chapter 13 Capacity and Aggregate Planning. Aggregate Production Planning (APP) Matches market demand to company resources Matches market demand to company.
Operations Management Aggregate Planning Chapter 13
IES 371 Engineering Management Chapter 14: Aggregate Planning
Chapter 12 Aggregate Planning.
OPSM 301 Operations Management
Ardavan Asef-Vaziri Systems and Operations Management
WEEK 11A – [S&OP] AGGREGATE PLANNING (CHAPTER 13) Planning levels (long, intermediate and short ranges and real time control); Planning & Control Model;
Aggregate Planning.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
ISQA 459 Sales & Operations Planning
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Aggregate Planning Operations.
Supply Chain Management (SCM) Aggregate Planning
Aggregate Planning Ash Soni ODT Department Kelley School of Business.
Chapter 8 Aggregate Planning in a Supply Chain
© 2007 Pearson Education Sales and Operations Planning Chapter 14.
Rev. 03/09/05SJSU Bus David Bentley1 Chapter 12 – Aggregate Planning Planning levels (long, intermediate and short ranges and real time control);
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Chapter 14 Aggregate Sales and Operations Planning.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 Learning Objectives:  Understand the concepts and methods of aggregate.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
Aggregate Planning and Resource Planning Chapters 13 and 14.
© 1997 Prentice-Hall, Inc Principles of Operations Management Aggregate Scheduling Chapter 12.
Operations Management Aggregate Planning
Chair Manufacturing Operation.  Operation Strategy (Ankush Moham)  Process (Jae Won Yu)  Forecast & Production (Prab Sandhu)  Site & Equipment (Alvin.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
AGGREGATE PLANNING Rachmat A. Anggara 9th of April 2010.
Aggregate Planning Chapter 13. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
Operations Management Aggregate Planning
© The McGraw-Hill Companies, Inc., DOM 511: Operations Mgt Practice Aggregate Planning.
 The McGraw-Hill Companies, Inc Irwin/McGraw-Hill 1 Facilities and Aggregate Planning Chapter 12 Due Date!
Operations Management For Competitive Advantage 1 Aggregate Planning Operations Management For Competitive Advantage Chapter 12.
Aggregate Planning and Resource Planning Chapters 13 and 14.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Aggregate Sales and Operations Planning CHAPTER 11.
1 Chapter 13 Production Planning Supplemental Slides.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
To Accompany Ritzman & Krajewski, Foundations of Operations Management © 2003 Prentice Hall, Inc. All rights reserved. Alternatives Quarter Total.
McGraw-Hill/Irwin  The McGraw-Hill Companies, Inc. 2007, All Rights Reserved Facilities and Aggregate Planning Chapter 12 Due Date!
© 2007 Pearson Education Sales and Operations Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
AGGREGATE PLANNING BY GRAPHICAL APPROACH Particularly for high volume, standardized product system & closed job shop systems, the concepts & methods of.
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Aggregate Planning Chapter 13.
Chapter 14 Aggregate Planning.
Inventory Control: Part 1- Fundamentals
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
Chapter 8 Aggregate Planning in the Supply Chain
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
Fundamentals of Production Planning and Control
Dr Sh Salleh bin Sh Ahmad
PRODUCTION AND OPERATIONS MANAGEMENT
Aggregate Production Planning (APP)
Presentation transcript:

Chapter 11 Aggregate Planning

Production Planning in Manufacturing

Aggregate Demand Example

Aggregate Planning How many workers are needed each quarter? (each worker works 520 hours per quarter) Labor hrs needed: # workers needed: Labor Standard # units hrsPrinters8,00012,00010,0006,000 2 hrsCD drives20,00016,000 12,000 3 hrsDVD drives15,00020,00012,00015,000 Quarter

Aggregate Planning 2 basic strategies: Matching Demand –matching capacity with aggregate demand –carry little inventory –change work force size Level Capacity –stable work force size –use inventory or backlog as buffer

Level Capacity: Produce-to-Stock

Level Capacity: Produce-to-Order

Level Capacity: Produce-to-stock For each period, Beg.Inv. + Production = Demand + End.Inv. Given: beg. inv. in Qtr. 1 = 24; CC = $15 per unit per qtr. QuarterDemandProduceBeg.Inv.End.Inv

Level Capacity: Produce-to-order For each period, Production - Demand = Beg.Backlog - End.Backlog Given: beg. BL in Qtr. 1 = 31 QuarterDemandProduceBeg.BLEnd.BL

Quarterly demands for the coming year are 145, 150, 226, and 95 for a make-to-stock product. The company uses a level capacity plan. In any quarter that demand cannot be met by production and inventory on hand, a costly stockout will occur. What is the least amount of beginning inventory for the first quarter that can be used without having any stockout during the year? Show what the ending inventory level for each quarter would be. QuarterDemandProduceBeg.Inv.End.Inv.Beg.Inv.End.Inv

Level Capacity Plan or Matching Demand Plan Quarterly demand forecasts: 85, 107, 136, 124 Carrying cost rate: $68 per unit left at end of each qtr. Hiring/training cost rate: $125 per new person Layoff cost rate: $50 per person Initial inventory = 0 Currently 57 employees prior to Quarter 1 Labor standard = 250 hours per unit Each employee works 520 hours per quarter Which costs less, a level capacity plan or a matching demand plan?

Level Capacity Plan QuarterDemandProduceBeg.Inv.End.Inv

Matching Demand Plan QuarterDemandProduce Lab.Hrs. Needed # of Employ# Hired # Layoffs

Rough-Cut Capacity Planning Labor standard = 24 hours per unit Weekly capacity = 5000 labor hours 12345Total Gross # units Requirements Load (hrs) Capacity (hrs) Underload Overload Week

Shifting Production Earlier Gross Req. (units) Capacity (units) Week Produce:

Straight-time vs. Overtime vs. Outsourcing Straight-time cost rate = $10 per hour Straight-time capacity = 20,000 hours per quarter Labor standard = 4 hours per unit Overtime cost rate = time-and-a-half Overtime capacity = 20% of straight-time capacity Outsourcing capacity = 1,000 units Outsourcing cost = $70 per unit (plus materials) Forecasted demand next quarter = 6,700 units Develop a production plan that minimizes total cost.

Straight-time vs. Overtime vs. Outsourcing Straight-timeOvertimeOutsourcing Unit cost ($) Capacity (units) Produce (units) Total cost ($)