Technical Committee Training Prof Richard Mackay, AM June 2012 & Management of Tourism Carrying Capacity.

Slides:



Advertisements
Similar presentations
Background Presenters Work done in preparation for WHS changes
Advertisements

[Organisation’s Title] Environmental Management System
Corporate Records Management (Practitioner) Information Governance Policy Team NHS Connecting for Health.
PUENTE IN THE CARIBBEAN
Action Plan Skills Building: Module 2 Defining Action Plan Purpose and Scope January 2013.
© 2012 Jones et al: Strategic Managerial Accounting: Hospitality, Tourism & Events Applications 6thedition, Goodfellow Publishers Chapter 18 Sustainability.
Status Quo Assessment of Wastewater Ponding Systems.
Project Monitoring Evaluation and Assessment
Course Title: Ecotourism Course Code: (TM371) Lecture:3.
This document is contained within the Visitor Use Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest,
TRM 450 X Research Methodology Spring Semester 2004 Dr. Zongqing Zhou.
ISO General Awareness Training
Future Research NeedsWorld Heritage and Climate Change World Heritage and Climate Change - Future Research Needs Bastian Bomhard World Heritage Officer.
TOU101 INTRODUCTION TO TOURISM
Minnesota Manual of Accommodations for Students with Disabilities Training Guide
The Management of Tourism Destination Pertemuan 9-10 Matakuliah: G1174/Tourism Management and Planning Tahun: 2007.
Presentation and Management of Heritage Assets
WORK HEALTH AND SAFETY ACT IMPLICATIONS FOR SMALL BUSINESS
Tourism attractions planning and development Lecture 2.
Legal & Administrative Oversight of NGOs Establishing and Monitoring Performance Standards.
Business Continuity Check List PageOne. - Why Does Your Business Need A Continuity Checklist? Should the unexpected occur, your business will be able.
Management strategies and policies for achieving and maintaining healthy and sustainable outdoor environments that may be adopted by public and private.
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
Lecture :TitleEcotourism Management Considerations
Strengthening General Aviation Security November 2011.
7th International Forum on Tourism Statistics
ISTEP: Technology Field Research in Developing Communities Instructor: M. Bernardine Dias CAs: Sarah Belousov and Ermine Teves Spring 2009.
Ship Recycling Facility Management System IMO Guideline A.962
APAPDC National Safe Schools Framework Project. Aim of the project To assist schools with no or limited systemic support to align their policies, programs.
The Policy Company Limited © Control of Infection.
Guidance for AONB Partnership Members Welsh Member Training January 26/
1 What are Monitoring and Evaluation? How do we think about M&E in the context of the LAM Project?
Developing Indicators
Rwanda MCC Threshold Program CIVIL SOCIETY STRENGTHENING PROJECT Cross-Cutting Advocacy Issues Data Collection Monitoring and Evaluation.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Health and Safety Policy
July 2011 Improving the image of construction. July 2011 PROJECT MATRIX July 2011 Update.
Goals and Indicators. Sustainable Measures Goals, Principles, Criteria, and Indicators  Goal – a description of future condition community members wish.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
Leisure, Sport and Tourism – Year 12 Lesson 14.  What is sustainable tourism?  What might limit its success?  Will some environments have more successful.
PARKING STRATEGY POLICY DEVELOPMENT Transportation & Asset Management Environment & Regeneration Scrutiny Committee 28 February 2007.
Regional Study Abu Dhabi Global Environmental Data Initiative CEDARE Report Hossam Allam Senior Information Systems Specialist.
Indicators to Measure Progress and Performance IWRM Training Course for the Mekong July 20-31, 2009.
Screen 1 of 22 Food Security Policies – Formulation and Implementation Policy Monitoring and Evaluation LEARNING OBJECTIVES Define the purpose of a monitoring.
Sample Codes of Ethics in Adventure Tourism
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Biodiversity Health Index Main Streams for Life John MacKinnon UNDP consultant June 2012.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
Minnesota Manual of Accommodations for Students with Disabilities Training January 2010.
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
Monitoring Afghanistan, 2015 Food Security and Agriculture Working Group – 9 December 2015.
Monitoring and evaluation Objectives of the Session  To Define Monitoring, impact assessment and Evaluation. (commonly know as M&E)  To know why Monitoring.
The Logical Framework (Log Frame). Programs & Projects Programs Broad areas of work required to implement policy decisions. Usually focused on a sector.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Childhood Neglect: Improving Outcomes for Children Presentation P21 Childhood Neglect: Improving Outcomes for Children Presentation Measuring outcomes.
A Sustainable Tourism Framework for the Caribbean Mercedes Silva Sustainable Tourism Specialist Caribbean Tourism Organization “Ma Pampo” World Ecotourism.
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
UNESCO INSTITUTE for STATISTICS Indicators for the Periodic Reporting Working group on the simplification of the Periodic Reporting questionnaire
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Heritage and Cultural Eco-tourism along the Badagry Peninsular By Mrs A.M Johnson Focal Point (Tourism) Lagos State, Nigeria.
ITC-ILO/ACTRAV Course A Trade Union Training on Occupational Safety, Health & HIV/AIDS (26/11 – 07/12/2012, Turin) Introduction to National Occupational.
Tourism Master Plan A master plan for tourism destinations usually incorporates concerns that includes all aspects of Tourism development process. Factors.
Gender-Sensitive Monitoring and Evaluation
Gender-Sensitive Monitoring and Evaluation
Monteverde cloud forest, Costa Rica
Controlling Measuring Quality of Patient Care
Monitoring and Evaluation of Sustainable tourism
Helene Skikos DG Education and Culture
How to conduct Effective Stage-1 Audit
Monitoring and evaluation Part 1 Lecture 10. Appraisal Vs Evaluation  Appraisal is before an activity takes place  Evaluation after the activity has.
Presentation transcript:

Technical Committee Training Prof Richard Mackay, AM June 2012 & Management of Tourism Carrying Capacity

The maximum number of visitors who can use the site without risk of damage to the site, without unacceptable change to the setting and natural environment, and while ensuring visitor safety and satisfaction How many people can be permitted into an area without risk of degrading the site and the visitors experience of it

An understanding of carrying capacity is essential for planning and decision making Evaluating carrying capacity is linked to site policy goals and management objectives This is essential for determining when undesirable change is taking place at a site and knowing how to respond appropriately

Carrying Capacity is dynamic It is generally broken down into three categories: Physical Environmental Social

Physical Carrying Capacity Space available for visitors How many cars can be accommodated in the parking areas? How many people can fit into a temple enclosure? What is the limit of available resources such as water, electricity and waste disposal?

Environmental Carrying Capacity The degree to which the environment can tolerate change and human interference while continuing to function How much change to the landscape is acceptable? How do changes to the environment impact on the site?

Social Carrying Capacity The limit at which the number of people causes: impact on visitor satisfaction changes to traditional behaviour Overcrowding is a social carrying capacity issue. There is a relationship between number of visitors and traditional use of the site or specific locations within the site

Considerations Not all visitors have the same degree of impact – one destructive visitor may cause more impact than 50 well aware visitors Not all areas within a site have the same limits – some areas may be able to sustain more numbers than others Visitors expectations and desires differ – some visitors may be happy surrounded by crowds, while others seek quiet and solitude

Limits of Acceptable Change (LAC) Carrying Capacity methodology should be based on the idea of limits of acceptable change The degree of change or impact that will be tolerated for the resource or the visitors Impacts can be limited by understanding desired conditions and using indicators to monitor change LAC sets standards and monitoring indicators based on management and stakeholder concerns

LAC Environmental or social conditions such as air quality or crowding have quantifiable standards based on desired conditions When conditions approach the limits of acceptable change there are impacts to the site or visitors Through understanding these changes management can take actions such as reducing access or changing visitor behaviour to prevent further impacts

LAC Managers have to define how much and what kind of change is acceptable, and Agree set indicator limits or standards that would trigger a management response The standards should be set based on both management and stakeholder needs

LAC Steps 1. Determine Management Goals and Objectives 2. Formulate Indicators based on Goals and Objectives 3. Undertake Monitoring 4. Establish Management Response

1. Goals and Objectives Derive management objectives and goals from the concerns of managers and stakeholders Outline tasks to achieve these goals and objectives For example: an objective may be to minimise physical damage to bas reliefs

2. Indicators Indicators should be based on the goals and objectives For example an indicator might be measurement of only one bas relief (in a heavily trafficked area) So the indicator provides an understanding of what is happening without having to measure everything In the natural environment a single measure like a bacteria count might indicate water quality

Criteria for Indicators Quantitative – the indicator can be measured Easily measurable – the indicator can be measured using simple, available field techniques or equipment Relevant to concerns – the indicator needs to reflect the concern being monitored Significant – the indicator can detect a meaningful change that is worth monitoring

Criteria for Indicators (cont) Sensitive – the indicator allows detection of changes Reliable over time – monitoring of the indicator can be carried out in the same way over time Responsive – the indicator can detect a change which results from management actions Cheap – the indicator does not require large ongoing costs, equipment or staff time

3. Monitoring Develop a plan of implementation based on identified indicators and baseline information Implement this plan and determine how to monitor management goals and objectives are being met Undertake regular and consistent monitoring For example undertake regular measuring of bas relief damage or bacteria counts in water

Baseline data The first stage of a monitoring programme is to collect baseline data An understanding of baseline data is essential for agreeing on indicators and standards Baseline data allows measurement of how much change has occurred Understanding change reveals how the current situation is different from the desired condition

4. Response Take action if agreed standards are not being met For example limit visitor access to areas of unstable masonry and undertake stabilisation work to OR Place rope barriers to prevent access to bas relief OR Change sanitary arrangements to prevent bacteria entering the river

Tourism Impact Indicators Should be reflective of policy statements, stakeholder concerns and needs and management objectives Should be informed by field experience Should be able to track physical, environmental and social conditions Should only monitor some key changes – it is not necessary to monitor everything

Examples of Indicators Abrasion of monuments Status of vegetation Number of human encounters while travelling per day, by number of groups and their sizes Visitor awareness of values and site significance Signs of pollution from humans, litter, food in streams

Examples of Indicators (cont) Tourists complaints about conditions Number of disturbances to an archaeological site Erosion Complaints from community members on deteriorating community values

Agreement of indicators is one of the most important steps for management

Case Study p. 59

Congestion Goal: minimise visitor crowding within Preah Khan central axis Indicator: number of people and group sizes within Preah Khan over time, length of time visitors are obstructed by congestion. Monitoring: record the number of people and group sizes at key locations in Preah Khan over time and record length of time that visitors are obstructed.

Monitor the tourism activity Develop alternative visitor programmes Develop pricing and ticketing policies Develop staff capacity to manage congestion Establish high visitation periods and areas of congestion Appropriate management of visitor numbers onto site Greater capacity to manage congestion Ensure adequate staff and resources for busy periods Appropriate design and management of visitor movement Appropriate education programmes Greater range of product choice Attractions at alternative places to spread tourism activity

Establish high visitation periods and areas of congestion Appropriate management of visitor numbers onto site Greater capacity to manage congestion Ensure adequate staff and resources for busy periods Appropriate design and management of visitor movement Appropriate education programmes Greater range of product choice Attractions at alternative places to spread tourism activity Monitor fluctuating business activity Provide information to visitors about issues related to congestion Cooperate with site management on movement of groups on-site Cooperate with site management to coordinate arrival schedules Ensure training of tour guides to be sensitive to visitor congestion on-site

References Tourism Congestion Management at Natural and Cultural Sites – A Guidebook World Tourism Organization Managing Tourism at World Heritage Sites – A Practical Manual for World Heritage Site Managers UNESCO World Heritage Centre Sustainable Visitation at the Mogao Grottoes: A Methodology for Visitor Carrying Capacity M. Demas, S. Maekawa, J. Bell and N. Agnew. Social and Environmental Monitoring as a Tool for Managing Visitor Impact at Jenolan Caves, Australia R. Mackay.