1 Session 14 Capacity Management lecture session 15

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

Números.
C) between 18 and 27. D) between 27 and 50.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
/ /17 32/ / /
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
& dding ubtracting ractions.
Job Order Costing Chapter 4.
Operations Scheduling
Sequential Logic Design
Copyright © 2013 Elsevier Inc. All rights reserved.
STATISTICS Linear Statistical Models
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
1  1 =.
CHAPTER 18 The Ankle and Lower Leg
Summative Math Test Algebra (28%) Geometry (29%)
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
L.O.1 To be able to recall multiplication and division facts involving the 2,3,4,6,7 and 8 times tables.
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Numerical Analysis 1 EE, NCKU Tien-Hao Chang (Darby Chang)
The basics for simulations
MM4A6c: Apply the law of sines and the law of cosines.
Look at This PowerPoint for help on you times tables
Manufacturing Planning and Control
Capacity Planning For Products and Services
Chapter 7. Capacity Planning and Management
Capacity and Constraint Management
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Sprayer Economics Gary Schnitkey University of Illinois.
Progressive Aerobic Cardiovascular Endurance Run
Visual Highway Data Select a highway below... NORTH SOUTH Salisbury Southern Maryland Eastern Shore.
Evelyn CP School Foundation Stage Results (Specific Learning Goals – Reading, Writing and Number) 2013 Reading (Expected) 77% Writing (Expected) 43% Number.
Area under curves Consider the curve y = f(x) for x  [a, b] The actual area under the curve is units 2 The approximate area is the sum of areas.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
Subtraction: Adding UP
Numeracy Resources for KS2
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Static Equilibrium; Elasticity and Fracture
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
ANALYTICAL GEOMETRY ONE MARK QUESTIONS PREPARED BY:
Resistência dos Materiais, 5ª ed.
& dding ubtracting ractions.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Patient Survey Results 2013 Nicki Mott. Patient Survey 2013 Patient Survey conducted by IPOS Mori by posting questionnaires to random patients in the.
A Data Warehouse Mining Tool Stephen Turner Chris Frala
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Introduction Embedded Universal Tools and Online Features 2.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Lecture 12 Capacity Management and Planning (continued) Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM,
Presentation transcript:

1 Session 14 Capacity Management lecture session 15 Capacity Planning Issues Finite Capacity Planning Example Twin Disc Capacity Bills Example Applicon Capacity Bills Example Concluding Principles

2 Capacity Planning Issues To determine the capacity required to achieve the MPS relative to the capacity available To make necessary capacity adjustments before creating crises To determine an the appropriate level of safety capacity To determine the required level of detail and the critical machines and work centers To use an appropriate technique given the tradeoff between accuracy and computational effort

3 Finite Capacity Planning Example The Single Square Company summarizes the capacity requirements for three of its key resources from each of its three product lines. A typical report (before any action is taken) is shown on the next slide.

4 Finite Capacity Planning Example (Continued) Key resource typePercent capacity by line MachineNumberShiftsABCTotalRemarks Drill Drill Drill Filer Filer Dryer Dryer Dryer a.What actions would you recommend? (Assume each machine type is equivalent in terms of capacity.) b.What other observations would you have for management, based on the preceding report?

5 Finite Capacity Planning Example: Single Square Company Key Resource Type% Capacity by Line MachineNumberShiftsTotal ABCTot.Equiv.Remarks Drill Req'd. Drill Move Drill from to 1 Filer Excess Filer _capacity Dryer Increase Dryer to three Dryer shifts

6 Finite Capacity Planning Example: Single Square Company (continued) a.There is enough capacity now in the Drill and Filer areas. To correct the imbalance in the Drills, it is necessary to move some of the load from Drill 2 to Drill 1. In the case of the Dryers, it is necessary to increase capacity. Adding shifts will provide enough for the current load. b.Why is there so much capacity for the Filers? They can be brought back to one shift and are okay. Secondly, if there is any upward trend in the loads for the Dryers, it behooves management to begin to worry about where they can get additional dryer capacity.

7 Twin Disc Capacity Bill Report

8 Twin Disc Capacity Bill Example Suppose, in the Twin Disc example, it was decided to move all production for product lines F and I from the Maag grinder (CEA) to the Reishauer grinder (CAB). What's the resulting total percentage of capacity for each machine and the amount for product lines F and I? (Note the Reishauer is three times faster than the Maag grinder so the Maag takes three times as many hours to complete a job.) Assume setup time is negligible.

9 Twin Disc Capacity Bill Example For Line I Grinding Hours On Maag= 3044 x.08 = On Reishauer= /3 = % of Reishauer= 81.17/950 = 9 New % of Line I on Reishauer= = 10% New % of Line I on Maag= 0% For Line F: Grinding Hours On Maag= 3044 x.05 = On Reishauer= /3 = % of Reishauer= 50.73/950 = 5 New % of Line F on Reishauer= = 7% New % of Line F on Maag= 0% New Totals: New total for Reishauer= = 83% New total for Maag= = 100%

10 Applicon Capacity Status Report

11 Applicon Capacity Bill Example Applicon has the following capacity bills for items 207 and 208: Work centerHours/unitWork centerHours/unit ALF-A 0.5 ALF-T 0.3 HLT-A 1.0 HLT-T 0.8 MIS-A 0.8 MIS-T 0.6 MVX-A 0.8 MVX-T 0.5 PCB-A 0.5 PCB-P 0.9 PCB-P 1.0 PCB-T 1.4

12 Applicon Capacity Bill Example a.A customer wants to know if Applicon can deliver 100 units each of items 207 and 208 during the next month (20 working days). Assume there are adequate materials, work center MVX-T'S crew has been increased to one full person (making standard capacity = 160), the increase has come by reducing MVX-A to 6.5 persons. and no other orders have been booked. Use the standard capacity data and conditions in the previous slides as the basis for your analysis. b.Suppose the customer (in part a. above) decided to delay the order for several months. How many units of item 207 alone could be added to the MPS in the next month? How about item 208?

13 Applicon Analysis:For Item 207 Work CenterUnits Possible ALF-A ( )/0.5 = 820 units HLT-A ( )/1.0 = 362 units MIS-A ( )/0.8 = 662 units MVX-A( )/0.8 = 801 units PCB-A ( )/0.5 = 216 units PCB-P ( )/1.0 = 552 units BUT this is if only item 207 is made.

14 Applicon If BOTH items are made in equal quantities, PCB-P is a shared work center so: PCB-P( )/( ) = 291 of each. For Item 208 Work CenterUnits Possible ALF-T (80 - 5)/0.3 = 250 units HLT-T( )/0.8 = 94 units MIS-T( )/0.6 = 110 units MVX-T( )/0.5 = 162 units PCB-P( )/( ) = 291 units PCB-T( )/1.4 = 544 units

15 Applicon a.The analysis says that 100 units of each cannot be added to the MPS without something else being done. The problem is with item 208 in work center HLT-T. To make 100 units of item 208, work center HLT-T will have to work overtime-unless capacity can be provided from a less highly utilized work center or perhaps greater productivity can be gained in some other way. b.The analysis shows that 216 units of item 207 or a total of 94 units of item 208 can be made.

16 Concluding Principles Capacity plans must be developed concurrently with material plans if the material plans are to be realized. The capacity measure should reflect realizable output from the key resources. It's not always capacity that should change when capacity availability doesn't equal need. Capacity not only must be planned, but use of that capacity must also be monitored and controlled. Capacity planning techniques can be applied to selected key resources (which need not correspond to production work centers).

17 Concluding Principles The particular capacity planning technique(s) chosen must match the level of detail and actual company circumstances to permit making effective management decisions. The more detail in the capacity planning system, the more data and data base maintenance are required. The better the resource and production planning process, the less difficult the capacity planning process. The better the shop-floor system, the less short-term capacity planning is required. Capacity planning can be simplified in a JIT environment.