TGn Editor Report Sept 2008 Date: Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0445r0 Submission May 2009 Adrian Stephens, Intel CorporationSlide TGn Editor Report May 2009 Date: Authors:
Advertisements

Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
Doc.: IEEE /0275r1 Submission March 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report March 2008 Date: Authors:
P802.16q to Sponsor Ballot: Conditional Approval Request 17 July 2014 IEEE Gdoc.
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE /0648r5 Submission July 2007 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2007 Date: Authors:
Doc.: IEEE /0792r0 Submission July 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2008 Date: Authors:
Doc.: IEEE /0420r0 Submission March 2008 Bruce Kraemer, MarvellSlide Marvell Lane, Santa Clara, CA, TGn Closing Report Orlando, FL,
TGn Editor Report Jan 2009 Date: Authors:
TGmb Editor Report - Jan 2010
November 2008 doc.: IEEE /1437r1 July 2011
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
P802.11n report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r3 November 2010
P802.11w report to EC on request for approval to proceed to RevCom
IEEE P Motions at the July Plenary EC Meeting
TGn Chairs’ Closing Report Waikoloa, HI 802 Interim – Sep ‘07
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11z conditional approval report to ExCom
P802.16Rev4 to Sponsor Ballot: Conditional Approval Request
TGn Editor Report Nov 2007 Date: Authors: Nov 2007
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z conditional approval report to ExCom
TGn Editor Report Jan 2009 Date: Authors:
IEEE Motions at the November Plenary EC Meeting
Avoiding unnecessary delays in the WG Letter Ballot process
IEEE Motions in July Plenary DCN:
P802.11w report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r4 November 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
Closing IEEE 802 EC Friday 15th March 2019
IEEE Motion at the July EC Closing Meeting
Closing IEEE 802 EC Friday 15th March 2019
Closing IEEE 802 EC Friday 15th March 2019
TGmb Editor Report - Sept 2010
IEEE MEDIA INDEPENDENT HANDOVER
November 2010 doc.: IEEE /0800r9 November 2010
November 2008 doc.: IEEE /1437r1 August 2010
June 2009 r2doc.: IEEE /0674r0 doc.: IEEE /0674r0 April 2010
Mar 2010 Closing Plenary Motions
TGn Editor Report Nov 2007 Date: Authors: Nov 2007
TGad Editor Report Date: Authors: July 2011 April 2007
TGn Editor Report March 2007
TGmb Editor Report - Nov 2010
TGmb Editor Report - Nov 2009
TGn Draft Redline Notice
Motion via Ballot IEEE motion Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot.
Motion via Ballot Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot Motion Start: May.
TGmb Editor Report - May 2010
Avoiding unnecessary delays in the WG Letter Ballot process
IEEE MEDIA INDEPENDENT HANDOVER
November 2010 doc.: IEEE /0800r9 November 2011
TGn Editor Report March 2007
P b to RevCom: Conditional Approval Request
P802.11aq Report to EC on approval to forward draft to RevCom
P802.16Rev4 to Sponsor Ballot: Conditional Approval Request
TGn Editor Report Sept 2007 Date: Authors: Sept 2007
Presentation transcript:

802.11 TGn Editor Report Sept 2008 Date: 2008-09-02 Authors: May 2006 doc.: IEEE 802.11-06/0528r0 September 2008 802.11 TGn Editor Report Sept 2008 Date: 2008-09-02 Authors: Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell

May 2006 doc.: IEEE 802.11-06/0528r0 September 2008 Abstract This document summarises editorial activities on the TGn Draft since the July 2008 meeting Status of Draft Status of ad-hocs and assignments Plan for this meeting Editorial motions Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell

Acknowledgements Speculative draft D6.01: Krishna Pillai, May 2006 doc.: IEEE 802.11-06/0528r0 September 2008 Acknowledgements Speculative draft D6.01: Krishna Pillai, Eldad Perahia, Douglas Chan, John Ketchum Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell

September 2008 LB134 comments Adrian Stephens, Intel Corporation

September 2008 Comments by ballot Adrian Stephens, Intel Corporation

Status by ad-hoc – Sept 01 September 2008 Adrian Stephens, Intel Corporation

May 2006 doc.: IEEE 802.11-06/0528r0 September 2008 LB134 Documents TGn DRAFT and redlines (members’ area of 802.11 website) Draft P802.11n_D6.01.pdf Includes speculative edits of comments assigned to editor LB134 composite comments (all ad-hocs) 11-08-0958-00-000n-tgn-lb134-composite-comments.xls LB134 comments assigned to editor 11-08-0959-00-000n-tgn-lb134-editor-comments.xls Includes tentative resolutions matching speculative edits to D6.01 Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell

Draft P802.11n_D6.0 Mandatory Editorial Coordination (MEC) September 2008 Draft P802.11n_D6.0 Mandatory Editorial Coordination (MEC) MEC is an inspection of the draft by IEEE-SA staff which must be completed prior to sponsor ballot, and a second time during sponsor ballot. MEC was performed on Draft P802.11n_D6.0 by the 802.11 Program Manger, Michelle Turner. The initial MEC comments and the TGn Editor response are contained in document 11-08-1045-00-000n-tgn-D6.0-MEC.doc A small number of changes resulting from this MEC are included in Draft P802.11n_D6.01.pdf These are flagged with (Ed:MEC) Adrian Stephens, Intel Corporation

Draft Numbering History (D2.0+) May 2006 doc.: IEEE 802.11-06/0528r0 September 2008 Draft Numbering History (D2.0+) D2.0, February 2007 - TGn and WG approved draft for balloting D2.01-D2.02, April-May 2007 - D2.02 approved by TGn D2.03, D2.04, D2.05 June-July 2007 - D 2.05 approved by TGn D2.06, Aug 2007 - Draft for editorial panel review D2.07, Sept 2007 D3.0, Sept 2007 - Draft for Letter Ballot 115 D3.01, Nov 2007 - Draft containing speculative editorial resolutions matching 11-07/2688r0. D3.02, Dec 2008 – Draft incorporating Nov 2007 resolutions D3.03, Feb 2008 – Draft incorporating Jan 2008 resolutions D4.00, March 2008 – Draft for LB124 D4.01, May 2008 – Speculative editing of comments assigned to the editor D5.00, May 2008 – Draft for LB 129 D5.01 (June 2008) to D5.04 (July 2008) – Speculative edits D6.00, July 2008 – Draft for LB134 D6.01, Aug 2008 – Speculative edits (editorials, minor technical) Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell

May 2006 doc.: IEEE 802.11-06/0528r0 September 2008 Editorial Motion #1 Move to accept the comment resolutions in document 11-08-0959-00-000n-tgn-lb134-editor-comments.xls on the “Editorial Comments” tab. Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell

May 2006 doc.: IEEE 802.11-06/0528r0 September 2008 Editorial Motion #2 Move to accept the comment resolutions in document 11-08-0959-00-000n-tgn-lb134-editor-comments.xls on the“Minor Technical from MAC” tab. Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell

May 2006 doc.: IEEE 802.11-06/0528r0 September 2008 Editorial Motion #3 Move to approve IEEE P802.11n_D6.01 as the TGn draft Yes No Abstain Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell

How do we close out this Letter Ballot? September 2008 How do we close out this Letter Ballot? At some stage we need to close out the ballot – we currently have ~91% approval – which is close to the magic “95%” that may be necessary to gain EC approval With each balloting cycle, we are still getting comments, and will probably continue to get them, no matter how many ballots we have At some stage we need to reject all the comments received in one recirculation ballot and then recirculate the comment rejections with an unchanged ballot Adrian Stephens, Intel Corporation

Requirements for EC Approval September 2008 Requirements for EC Approval Even if we choose not to resolve some comments, we still have to explain why... Report created which details: Ballot results Copies of unsatisfied comments in the format produced by MyBallot LMSC 7.2.4.1.2: “Submission of a draft standard or a revised standard to the EC must be accompanied by any outstanding negative votes and a statement of why these unresolved negative votes could not be resolved.” Adrian Stephens, Intel Corporation

Procedure for conditional approval September 2008 Procedure for conditional approval LMSC P&P Clause 19. “This procedure is to be used when approval to forward a draft standard to LMSC letter ballot or to RevCom is conditional on successful completion of a WG or LMSC recirculation ballot, respectively. Seeking conditional approval is only appropriate when ballot resolution efforts have been substantially completed and the approval ratio is sufficient. ” Conditions: not yet had final recirculation resolution efforts are “substantially completed” approval ratio is “sufficient” Adrian Stephens, Intel Corporation

Conditions required to gain conditional approval September 2008 Conditions required to gain conditional approval a) Recirculation ballot is completed. Generally, the recirculation ballot and resolution should occur in accordance with the schedule presented at the time of conditional approval. b) After resolution of the recirculation ballot is completed, the approval percentage is at least 75% and there are no new [valid] DISAPPROVE votes. Adrian: inserted [valid] because a new no vote must be supported by a comment that is in order. c) No technical changes, as determined by the WG Chair, were made as a result of the recirculation ballot. d) No new valid DISAPPROVE comments on new issues that are not resolved to the satisfaction of the submitter from existing DISAPPROVE voters. e) If the WG Chair determines that there is a new invalid DISAPPROVE comment or vote, the WG Chair shall promptly provide details to the EC. f) The WG Chair shall immediately report the results of the ballot to the EC including: the date the ballot closed, vote tally and comments associated with any remaining disapproves (valid and invalid), the WG responses and the rationale for ruling any vote invalid. Adrian Stephens, Intel Corporation

Plan to close out the letter ballot September 2008 Plan to close out the letter ballot TBD – add project plan here Adrian Stephens, Intel Corporation