The SPL-based Proton Driver at CERN

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

H. Haseroth July 26 – August 1, 2004 NuFact04, Osaka 1 The 3 MeV H - Test Stand at CERN - The first part of the SPL - H. Haseroth on behalf of the SPL.
Eurisol driver: heavy ion capabilities A. Pisent, M. Comunian, A. Facco, E. Fagotti, (INFN-LNL) R. Garoby (CERN), P. Pierini (INFN-MI)
PS Seminar – 27/06/2002 SPL status & plans 1 Status & plans of the SPL* study  Why upgrade the proton beams at CERN ? Approved physics programme Potential.
Catalina Island Meeting May, Proton Drivers for Neutrino Factories: The CERN Approach Presented by B. Autin, CERN.
Linac4 Status C. Carli presenting (a slightly adopted selection of) slides prepared by and on behalf of M. Vretenar Looking from this point and with a.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
R.G. – 17/03/2003 MORIOND Workshop The SPL* at CERN OUTLINE  Why ?  How ?  Roadmap  Summary * SPL = Superconducting Proton Linac A concept for.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Chopping Simulations Results M. Garcia Tudela, JB. Lallement, PA. Posocco, A. Lombardi, G.Bellodi, M. Eshraqi, E. Sargsyan, L. Hein 1 17/06/2010.
August 27, 2006R. Garoby Introduction 5 GeV version of the SPL Scenarios for accumulation and compression Conclusion SPL-BASED 5 GeV PROTON DRIVER.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Parameters of 2 nd SPL feasibility study A.M.Lombardi (reporting for the working group)
LAGUNA meeting September , 2010 CAES – CNRS – Aussois - FRANCE Prospective Proton Drivers for neutrino facilities at CERN 8/09/2010 R. Garoby.
F Project X Overview Dave McGinnis October 12, 2007.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
Alexander Aleksandrov Oak Ridge National Laboratory
12/10/05NuPAC – CERN 2005M. Benedikt 1 Potential future proton beam performance at CERN for HIE ISOLDE, n_TOF phase 2 and EURISOL Michael Benedikt AB Department,
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Andreas Jansson, Neutrino Workshop, ANL, March 3-4, 2004 Possible beta beam scenario(s) in the US Andreas Jansson Fermilab.
1 PS Days - Evian / MV The SPL : a High-Power Superconducting H – Linac at CERN  Motivations  Applications  Design features  Improvements.
Linac4 Status 1 M. Vretenar sLHC public event
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
CHARGES TO THE ESAC The External Scientific Advisory Committee for the HIPPI JRA inside CARE has been nominated to analyse the work done and planned in.
RF Summary SLHIPP – 1 o. brunner BE-RF. RF sources and beam dynamics: o Magnetrons (Amos Dexter Lancaster Univ. ) o LLRF for the SPL SC cavities (Wolfgang.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
A. FaccoEURISOL DS Orsay, 3 Feb 2005 Task 7 Proton Accelerator “The objective of the Proton Accelerator Task is the design a 5 mA CW, 1 GeV proton linac.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Status and Perspectives of the SPL R&D R. Garoby – 6/12/2012 SPL Seminar 2012 December 6-7, 2012 CERN.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
UK Neutrino Factory Conceptual Design
Proton Driver Scenarios at RAL and CERN
Linac4 & SPL Status of preparation and Opportunities M. Vretenar (R
The CERN Linac4 history, performance, perspectives
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
WP5 Elliptical cavities
Plans for a Superconducting Proton Linac at CERN
SPL R&D at CERN R. Garoby for S. Atieh, I. Aviles Santillana, G. Arnau Izquierdo, R. Bonomi, O. Brunner, S. Calatroni, O. Capatina, J. Chambrillon, F.
Abstract EuSPARC and EuPRAXIA projects
Linac4 M. Vretenar for the Linac4 design team
Linac4 Beam Characteristics
Other Scenarios for a partial Upgrade of the Injector Complex C
Plans for a Superconducting Proton Linac at CERN
Status of the CERN chopper.
Status of the CLIC main beam injectors
Physics design on Injector-1 RFQ
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Part2: Cavities and Structures
Superbeams with SPL at CERN
Report from the 1st meeting of Linac4 Machine Review Committee
Plans for new LHC injectors R. Garoby
Progress towards Pulsed Multi-MW CERN Proton Drivers
Status of the CLIC Injector studies
LHC (SSC) Byung Yunn CASA.
Pulsed Ion Linac for EIC
Collective Effects and Beam Measurements in Particle Accelerators
Part2: Cavities and Structures
A Design Study of a Compressor ring for
Generation of Higher Brightness Beams for LHC
SLHC-PP kick-off meeting, CERN 9 April 2008
Physics Design on Injector I
LHC Machine Advisory Committee, CERN 12th June 2008
Presentation transcript:

The SPL-based Proton Driver at CERN OUTLINE 1. Introduction 2. SPL characteristics 3. On-going work 4. Staging 5. Summary and Conclusion R. Garoby for the SPL W.G. 1

SPL Working Group REFERENCE Conceptual Design of the SPL, a High Power Superconducting Proton Linac at CERN Ed. M. Vretenar, CERN 2000-012 R. Garoby for the SPL W.G. 2

1. Introduction CERN baseline scenario for a Neutrino Factory R. Garoby for the SPL W.G. 3

Other applications of the proton driver Approved physics experiments CERN Neutrinos to Gran Sasso (CNGS): increased flux (~ ´ 2) Anti-proton Decelerator: increased flux Neutrons Time Of Flight (TOF) experiments: increased flux ISOLDE: increased flux, higher duty factor, multiple energies... LHC: faster filling time, increased operational margin... Future potential users “Conventional” neutrino beam from the SPL “super-beam” Second generation ISOLDE facility (“EURISOL” -like) LHC performance upgrade beyond ultimate… R. Garoby for the SPL W.G. 4

2. SPL characteristics H- source, 25 mA 14% duty cycle CCDTL new SC cavities: b=0.52,0.7,0.8 Fast chopper (2 ns transition time) RF system: freq.: 352 MHz ampli.: tetrodes and LEP klystrons R. Garoby for the SPL W.G. 5

Improvements w.r.t. the reference design Improved transitions between sections  better beam stability Doubled period length above 1.1 GeV  save 25 doublets, 8m, 3 MCHF Improved error studies  100% beam radius < 20 mm, even for large error case (30 %)  quad. radius reduced from 100 mm to 60 mm, (17rms)  save 2 - 3 MCHF Reduced longitudinal emittance: 0.6  0.3 ºMeV  improved design of the transfer line (drift length 230  175 m, bunch length 180  130 ps) Use of beta=0.8 cavities up to the highest energy  shorter tunnel (- 100 m), less cavities per klystron, better control of mechanical resonances R. Garoby for the SPL W.G. 6

SPL beam specifications R. Garoby for the SPL W.G. 7

Accumulator-Compressor scheme R. Garoby for the SPL W.G. 8

Characteristics of the beam sent to the target R. Garoby for the SPL W.G. 9

Layout on the CERN site (top view) R. Garoby for the SPL W.G. 10

Cross section R. Garoby for the SPL W.G. 11

3. On-going work R. Garoby for the SPL W.G. 12

Collaboration on RFQs with CEA-IN2P3 (IPHI) and INFN Legnaro Progress highlights Chopper structure 3 D view of a coupled cavity drift tube module (CCDTL) Scaled model (1 GHz) in test Full performance prototype tested Driver amplifier in development Collaboration on RFQs with CEA-IN2P3 (IPHI) and INFN Legnaro 352 MHz test place prepared (planned tests of CEA-built DTL structures in 2002) R. Garoby for the SPL W.G. 13

Chopper  Travelling wave electrostatic deflector, meander line to match beam and wave velocity  Used to create gaps in the linac bunch distribution between accumulator buckets  Needs very short rise/fall times (2 ns !) to avoid partially deflected bunches  Development of pulser 198+2mm (33 cells) 50 mm accumulator bucket R. Garoby for the SPL W.G. 14

Study of RT structures for the SPL front-end bl Alvarez Drift Tube Linac unsurpassable <20 MeV good but expensive for 20-120 MeV bl Cell Coupled Drift Tube Linac attractive solution for 20-150 MeV (a cold model is being designed) bl/2 Coupled-Cell Cavity (LEP1) better efficiency >110 MeV quadrupole quadrupole The final choice will depend on preferred apertures, RT final energy, etc. R. Garoby for the SPL W.G. 15

Superconducting cavities  CERN technique of Nb/Cu sputtering for b=0.7, b=0.8 cavities (352 MHz): excellent thermal and mechanical stability (very important for pulsed systems) lower material cost, large apertures, released tolerances, 4.5 K operation with Q = 109 The b=0.7 4-cell prototype  Bulk Nb or mixed technique for b=0.52 (one 100 kW tetrode per cavity) R. Garoby for the SPL W.G. 16

RF and Superconducting cavities Parameters R. Garoby for the SPL W.G. 17

Pulsed operation of a LEP klystron set-up RF output power (800 kW max.) Mod anode driver 5 ms/div 1 ms/div 14/05/2001 - H. Frischholz Þ LEP power supplies and klystrons are capable to operate in pulsed mode after minor modifications R. Garoby for the SPL W.G. 18

RF power distribution & field regulation in the superconducting cavities Effect on field regulation Effect on the beam Þ unsolved problem ! Needs work Þ similar difficulties are likely in the muon accelerators... R. Garoby for the SPL W.G. 19

4. Staging Test of the 3 MeV H- injector Means: strengthen collaboration with the CEA-IN2P3 and jointly exploit the IPHI set-up Contribute to the chopper and bunchers 120 MeV H- linac in the PS South Hall Goal: increase beam intensity for CNGS and improve characteristics of all proton beams (LHC, ISOLDE…) Under study: detailed design report with cost estimate in 2003 Needs new resources (collaborations, manpower, money) SPL R. Garoby for the SPL W.G. 20

Proton Intensity increase: location of the SPL front-end in the PS South Hall PS To the PSB Beam dump H- source LEIR Þ Increased brightness for LHC, ´ 1.8 the flux to CNGS & ISOLDE, … (with upgrades to the PSB, PS & SPS) Þ “cheap” installation, giving benefits from SPL related hardware before the full machine is operational & shortening the final setting-up R. Garoby for the SPL W.G. 21

5. Summary and Conclusion The SPL design is improving Work is started on most items, based on collaborations A staged approach is proposed Feedback (and support !) is needed from potential users R. Garoby for the SPL W.G. 22