Modification 0043 – Limitation on offering for sale unsold capacity

Slides:



Advertisements
Similar presentations
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Advertisements

Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Entry and Exit Investment Process Outline Transmission Planning Code Workshop 3 5 th June.
Baseline Reconsultation Timeline Timeline (1) Aug SepOctNov Dec 14/8 Workshop 1: History & Timeline 17/8 Workshop 2: Methodology Brainstorm.
Auctions recommendations GTE+ Capacity Product Coordination (CPC) Workshop on 26 November 2008 Matthew Hatch National Grid.
Incremental Entry Capacity Release Methodology Statement Review 2005 Transmission Workstream - 15th June 2005.
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
September 2008 QSEC auction - Allocations Transmission Workstream
Proposal to adjust investment lead times Transmission Workstream 4 th May 2006.
Initial Thoughts on Timeline for Entry Capacity Substitution Draft for discussion purposes only.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Transitional Exit Capacity Proposals -Update
Exit Capacity Release Methodology Statement
Entry Capacity Overrun price calculation
Transmission Planning Code
Transmission Workgroup 4th October 2012
Transmission Workstream, 2nd March 06
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
UNC Trader User – Licence obligations
Entry Capacity - update
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Capacity Methodology Statements: Impact of Mod 452
NTS Entry Charging Review Update
Capacity Methodology Statements
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
Exit Capacity Substitution and Revision
Update on Exit Capacity Substitution and Revision
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Capacity Methodologies Review 2019
Transmission Planning Code Review
QSEC auction timetable
PARCA Timeline.
UNC Transmission Workstream 7th December 2006
Proposed Transitional Gas Exit Arrangements
Review of Trade and Transfer Winter 09/10
Revised Tender Timescale for DN Interruption Arrangements
Gas Customer Forum DN Interruption Update - Introduction
Mark Freeman 29th January 2007
Entry Overrun Calculation
Transmission Workstream – 6th July 2005
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Optimisation of Entry Capacity Modification Proposal
Information Provision for Transitional Exit Capacity
Transmission Workstream DN Interruption Update - Introduction
Open Letter - Summary of Responses
IECR Incremental Step Size
Review Group 221: Review of Questions from Session 2
Incremental Entry Capacity Release Methodology Statement
Review Group Action November 2008.
Transmission Workstream, 1 Mar 07
Entry Capacity Transfers - Constrained Period
Revised Tender Timescale for DN Interruption Arrangements
Presentation transcript:

Modification 0043 – Limitation on offering for sale unsold capacity Transmission Workstream 11 Aug 05

Investment Lead Time – Industry Views Desire for certainty pre-auction to understand implications of any bids post-auction arrangements not supported Where significant risk that not possible to deliver capacity within 3 years, some Users consider appropriate not to expose industry to risk of large buy-back costs …but require clarity on circumstances in which Transco NTS would use any pre-auction flexibility should be “exceptional” circumstances

Proposals - Update IECR Methodology Statement revised to include flexibility pre-auction to not release incremental capacity Ofgem approved 13 July 05 Modification 0036 raised to align UNC and IECR FMR with Ofgem for decision Modification 0037 raised to restrict unsold capacity based on similar principles (as explained at 6th July Workstream meeting) withdrawn based on industry representations considered that some concerns could be addressed

Proposal 0043 - Summary Transco NTS not obliged to release Unsold Capacity in QSEC auctions conducted before 31 March 07 for calendar quarters for which: significant risk that unable to physically deliver all or part of the unsold capacity if allocated; expectation that previously allocated capacity would need to be bought back at same entry point; and written permission obtained from Authority. If such criteria are met at any ASEP, unsold capacity set to zero for future annual, monthly or daily capacity auctions at the ASEP for gas days within the relevant calendar quarter(s)

Example – Unsold Capacity QSEC 05 auction Quarter Released Allocated Unsold Apr- Jun 07 100 90 10 July- Sept 07 50 Oct – Dec 07 Jan – Mar 08 Apr – Jun 08 80 20 Jan – Mar 21 Revised Unsold Applicable to future annual, monthly and daily auctions 100 20

Timetable 12th Aug - Close out of representations 15th Aug - Urgent Modification Report issued 17th Aug - Modification Panel recommendation 18th Aug - Ofgem decision expected 19th Aug – Transco NTS publish QSEC 05 tender