September 2009 Closing Report Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2009 September 2009 Closing Report Date: 2009-09-24 Authors: Dorothy Stanley (Aruba Networks) John Doe, Some Company
Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2009 Abstract This document contains the TGv closing report for September 2009. Dorothy Stanley (Aruba Networks) John Doe, Some Company
Goals and Accomplishments Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2009 Goals and Accomplishments Comment resolution from LB 155 Completed resolution of LB 155 comments, see https://mentor.ieee.org/802.11/dcn/09/11-09-0929-04-000v-lb155-comments.xls Met requirements for Conditional Approval for Sponsor Ballot Report in https://mentor.ieee.org/802.11/dcn/09/11-09-1057-00-000v-conditional-approval-ec-report.ppt Teleconferences, ad-hoc None Dorothy Stanley (Aruba Networks) John Doe, Some Company
Comment Processing Summary Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2009 Comment Processing Summary Total 24 Technical 12 Editorial Editor Done/To Do 24/0 – No changes to the draft Comment resolutions adopted to date 21, 3 withdrawn Comments remaining Dorothy Stanley (Aruba Networks) John Doe, Some Company
Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2009 Output Documents 11-09-1074-00-000v-TGv-September-2009-closing-report.ppt 11-09-0933-02-000v-September-2009-agenda.ppt 11-09-1073-00-000v-September-2009-meeting notes Dorothy Stanley (Aruba Networks) John Doe, Some Company
Motion – Approve LB155 Comment Resolutions Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2009 Motion – Approve LB155 Comment Resolutions Move to adopt the comment resolutions in 09-0929-04 as the approved comment resolutions for TGv Draft 7.0 LB 155 comments. Moved: Allan Thomson Seconded: Qi Wang Result 2-0-1 Motion Passes Dorothy Stanley (Aruba Networks) John Doe, Some Company
Motion – Approve Report on Conditional Approval Requirements Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2009 Motion – Approve Report on Conditional Approval Requirements Approve document 09-1057-00 as the report to the 802 Executive Committee (EC) showing that P802.11v has met the conditional requirements to proceed to sponsor ballot. Moved: Allan Thomson Seconded: Qi Wang Result 3-0-1 Motion passes Dorothy Stanley (Aruba Networks) John Doe, Some Company
TGv Timeline – Updated Sept, 2009 Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2009 TGv Timeline – Updated Sept, 2009 Initial Working Group Letter Ballot: July 07 – completed Jan 08 – D2.0, May 08 – D3.0, Nov 08 – D4.0 Re-circulation Working Group Letter Ballot: November 08 (D4.0) Mar 09 – D5.0, May 09 – D 6.0, July 09 – D7.0, D7.0(unchanged) Form Sponsor Ballot Pool: August 09 (was June 09) Initial Sponsor Ballot: Oct 09 Oct 09 – D7.0 (was Sept 09) Approved Sponsor Ballot: Nov 09 Jan 09 – D8.0, Feb D9.0, March D10.0, April D11.0 May 12th ( or so) for Revcom June Approval Final WG/EC Approval: July 2010 RevCom/Standards Board Approval: June 4th/June 5th(or so) Note: TGv PAR is authorized through Dec 2010 Dorothy Stanley (Aruba Networks) John Doe, Some Company
Goals for November 2009 Comment resolution on Initial Sponsor Ballot Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2009 Goals for November 2009 Comment resolution on Initial Sponsor Ballot Recirculation Sponsor Ballot Dorothy Stanley (Aruba Networks) John Doe, Some Company
References September 2009 Month Year doc.: IEEE 802.11-yy/xxxxr0 Dorothy Stanley (Aruba Networks) John Doe, Some Company