Prime Factors for Successful Preservation Treatments

Slides:



Advertisements
Similar presentations
HMA Warranties Seminar for CALTRANS Lee Gallivan FHWA Indiana Division April 3 rd, 2003.
Advertisements

EMS Checklist (ISO model)
Checking & Corrective Action
Monitoring the Product Production, Import, Wholesale and Retail Level Monitoring.
Rigid Pavement Concrete. Transverse Cracking Rigid Pavement Transverse Cracking Causes:  Slab longer than 15’ Slab Curl Curing.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
1 Assessment: Norms and Accreditation. Assessment: Norms and Accreditation-Module 11 2 Learning Objectives At the end of this module, participants will.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
The New TNI Laboratory Accreditation Standards Requirements for an Accreditation Body.
District 8-0 QA Review Trends Summary Documentation and Certification Project certifications for materials should be reviewed as they.
ISO 9001 : 2000.
Pavement Preservation Update By Shakir Shatnawi Chief, Office of Pavement Preservation PPTG Caltrans Co-Chair Gary Hildebrand and Casey Holloway PPTG Industry.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Surface Rehabilitation Treatments
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
Asphalt Quality Assurance Program
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
ISO 9000 Certification ISO 9001 and ISO
SAFETY AUDIT. 2.1 Definition of audit. Critical systematic inspection of an organization‘s activities in order to minimize losses due to accidents.
5.2 Personnel Use competent staff Supervise as necessary
 Quality Management Program (QMP) Review  HTCP Program  IRI News.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
WELCOME TO TRAINING PROGRAMME FOR CONSULTANTS’ SERVICES FOR 3 rd PARTY QUALITY CONTROL AND QUALITY ASSURANCE G. PRABHAKAR.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Introduction to ISO New and modified requirements.
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
PAVEMENT MAINTENANCE 1:
Chapter 3 Framework for Treatment Selection From… Maintenance Technical Advisory Guide (MTAG)
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
MICHIGAN EXPERIENCE WITH WARRANTY WORK. Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
Gary Hicks and Rob Marsh Gary Hicks and Rob Marsh April 19, 2005 April 19, 2005 Pavement Preservation Sub-Group on Strategy Selection & Evaluation.
Session 4 Preventive Maintenance Treatments. Learning Objectives 1.Identify typical preventive maintenance techniques used on HMA and PCC pavements 2.Identify.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
THE ROLE OF PROFICIENCY TESTING - A PERSPECTIVE FROM AN ACCREDITATION BODY Randall Querry American Association for Laboratory Accreditation (A2LA) November.
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
NCSLI 2007 Training Records from an Auditors Viewpoint Shawn Mason Boston Scientific.
Visit us at E mail: Tele:
ISO Certification For Laboratory Accreditation ISO Certification For Laboratory Accreditation.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
INDOT Roadway Preservation Initiative Update
Update from FHWA Emulsion Task Force
ISO/IEC
Third Party Activities for FH1 Project
UNIT V QUALITY SYSTEMS.
QC Document Update Todd Shields, INDOT.
Pavement condition index calculation
Acceptance Process for Manufactured Products by Certification:
Implementation of pavement preservation treatments
2018 Pavement Workshop May 23-24, 2018
Construction Management
Quality Assurance: Pay Factors and Dispute Resolution
2018 Pavement Workshop May 23-24, 2018
Chip Seal Quality Assurance Guide
Pavement Preservation
Quality Control Personnel Training
Quality Assurance For Emulsion Treatments In Pavement Preservation
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Emulsion Task Force Meeting
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Quality Assurance for Emulsified Asphalt Surface Treatments
Advancing Pavement Preservation Through Certification
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Presentation transcript:

Prime Factors for Successful Preservation Treatments Arizona Pavements / Materials Conference Larry Galehouse, P.E., P.S. National Center for Pavement Preservation

Preservation Treatments Asphalt Treatments Concrete Treatments Fog Seal Crack Treatment Joint & Crack Sealing Chip Seal Scrub Seal Diamond Grinding Slurry Seal Micro Surfacing Diamond Grooving Cape Seal Patching Dowel-Bar Retrofit Ultrathin HMA Overlay Hot In-place Recycling Partial Depth Repair Thin HMA Overlay (1½”) Cold In-place Recycling Full Depth Repair Ultrathin Bonded Wearing Course High Friction Surface Treatments Cross-Stitching Slab Stabilization

Successful Preservation Treatment Examples Chip Seal Micro Surfacing Dowel Bar Retrofit

So what are the prime factors for successful preservation treatments?

Factor 1 – Qualified Personnel Training is essential for successful pavement preservation projects.

Qualified Personnel Contractor and agency employees need to acquire knowledge about how to build a pavement preservation treatment.

Qualified Personnel Technicians conducting material sampling and testing for quality acceptance or quality control activities need to be certified by a nationally recognized organization.

Qualified Personnel Certain contractor employees need to be certified for the treatment(s) they construct. These employees should include: Superintendents Foreman Operators of major equipment

Qualified Personnel Certification is confirmation that a person has the necessary knowledge of a specific pavement preservation treatment by examination from a recognized independent third party specializing in the field.

Factor 2 – Laboratory Accreditation Accredited laboratories conducting tests used in mix design or acceptance have trained personnel knowledgeable on specific test methods.

Laboratory Accreditation Accredited laboratories must undergo an on-site third party assessment. This includes a scheduled review of: Technician training and competency records Equipment calibration and check records Each test method demonstrated by lab staff The proficiency sample program

Laboratory Accreditation Many laboratory accreditation programs are available:

Factor 3 – Quality Materials Quality materials are essential for quality results.

Quality Materials Specifications address quality materials through: Certificate of Compliance or Certificate of Analysis Prequalified Aggregate Suppliers Qualified Products List (QPL) Approved Products List (APL) Tested Stock Suppliers

Factor 4 – Project Selection Fiscal constraints and pressure from legislators and administrators force agencies to work on pavements too far down the deterioration curve.

Project Selection Pavement Management Systems Pavement Inventories Type, Age, Location, etc. Ride Quality Measurements Distress Functional and Structural Rutting Faulting

Project Selection Field Review (Windshield Survey) Asphalt Pavements Oxidation Early Raveling Bleeding Drainage Issues Concrete Pavements Joint Seals Pop-outs

Poor choices for pavement preservation. Project Selection Poor choices for pavement preservation.

Causes of Poor Pavement Performance in USA

Factor 5 - Quality Control The system used by a Contractor party to monitor, assess and adjust their production or placement processes to ensure that the final product will meet the specified level of quality.

Acceptable Quality Control Plan Scope and Reference Documents Definitions Quality Control Personnel Quality Control Testing Facilities and Equipment Materials Control Quality Control Sampling and Testing Production Equipment Treatment Placement and Workmanship Documentation Non-Conformance and Corrective Action

Quality Control Plan Parts SCOPE and REFERENCE DOCUMENTS ASTM Standards AASHTO Standards Guidelines and Technical Bulletins Standard Specifications and Project Special Provisions

Quality Control Plan Parts DEFINITIONS Making Terms Used in QC Plan Clear and Distinct

Quality Control Plan Parts QUALITY CONTROL PERSONNEL Company Personnel Responsible for QC Subcontractors Responsible for QC Material Suppliers Meeting Testing Requirements

Quality Control Plan Parts 4. QUALITY CONTROL TESTING FACILITIES and EQUIPMENT   Laboratory Used for Material Sampling and Testing Laboratory Used for Mix Designs Must be Accredited Laboratories

Quality Control Plan Parts 5. MATERIALS CONTROL   All Materials Used in Treatment are Identified List of Approved Material Sources Storage Requirements and Stockpiling Provisions

Quality Control Plan Parts 6. QUALITY CONTROL SAMPLING and TESTING Lot Size Defined for Sampling Sampling Identification System Storage and Retention Procedures for Samples Sampling Methods, Test Procedures and Frequency

Quality Control Plan Parts 7. PRODUCTION EQUIPMENT Identify All Equipment Used During Construction Provide Spec Sheets for Major Equipment

Quality Control Plan Parts 8. PLACEMENT and WORKMANSHIP Calibration Procedure for Equipment Equipment Checks, Inspection Methods and Frequency Pavement Surface Preparation Procedures Pre-Production Quality Control Checks Related Production Activities Traffic Control Tack Coat, etc.

Quality Control Plan Parts 8. PLACEMENT and WORKMANSHIP - continued Critical Factors That Can Affect Production Results Identify Protocols for Proper Workmanship Production QC Activities, Test Frequencies, and Inspection Methods Cleanup Daily End of Project

Quality Control Plan Parts 9. DOCUMENTATION Examples of Reporting Forms Production Quality Control Reporting Sampling and Testing Results Daily Production Records Non-Conformance Report Document Retention Details

Quality Control Plan Parts 10. NON-CONFORMANCE and CORRECTIVE ACTION Corrective Actions Described for: Materials Not Meeting Specifications All Potential Defects in Workmanship

Quality Control Plan Parts APPENDICES – Supporting Documents Company Organization Chart Resumes of QC Personnel Employee Certifications Equipment Specifications Examples of Report Forms

Factor 6 - Agency / Owner - Acceptance Acceptance is the process which the Agency, Owner, or Designated Agent determines whether the quality of the product meets the contract requirements.

Agency / Owner - Acceptance The Agency, Owner, or Designated Agent will verify the degree of compliance by independently performing: Random Material Sampling and Testing Inspection of Workmanship

Agency / Owner - Acceptance The objectives of acceptance are to: Perform sampling and testing for key quality characteristics. Inspect to identify visually deficient work. Measure the quality of all materials produced and placed by the contractor. Determine the corresponding payment the contractor should receive.

Quality Assurance Quality is critical for the contractor to achieve customer satisfaction and retain future pavement preservation work.

Quality Assurance Quality pavement preservation treatments make an important contribution to long-term revenue and profitability.

Questions