STRATEGIC PETROLEUM RESERVE BAYOU CHOCTAW CAVERN 20 REPLACEMENT 1.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Mission Oriented, Customer Focused
1 Yell / The Law and Special Education, Second Edition Copyright © 2006 by Pearson Education, Inc. All rights reserved.
a b c d ab = cd x x = x x = x x = 1 Example 1:
Advanced Piloting Cruise Plot.
Kapitel 10. Copyright © Houghton Mifflin Company. All rights reserved.10 | 2 1. The passive voice.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
Module N° 6 – SMS regulation
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Disputes/Claims 2009 Overview Division of Construction Management.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
ZMQS ZMQS
Guidance on New CEs Emergency Repair Projects Operational Right-of-Way Limited Federal Funds EUM – March questions to:
West Elementary School May 16, % Construction Documents.
East Parking Garage Project (Executive Leadership Council) January 31, 2011.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Break Time Remaining 10:00.
Software change management
Multiple Award Construction (4 contracts) 1/5/11-1/5/16 $75M Cum (Contractors: Grimberg; NICC JV. Inc; Meltech; Biscayne) Protective Services Division.
ABC Technology Project
Module 14 Major Incident Management Module 14 Major Incident Management incident Problems in major and complex incident management Major incident management.
Project Scheduling: Lagging, Crashing, and Activity Networks
January 10, 2008www.infosecurity.ca.gov/1 Role, Responsibility and Authority of New Office Presented by Colleen Pedroza, State Chief Information Security.
VOORBLAD.
YES New Mexico Enterprise Eligibility System
15. Oktober Oktober Oktober 2012.
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
2014 National Patient Safety Goals
Sample Service Screenshots Enterprise Cloud Service 11.3.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Evaluation of an intervention to increase online filing of individuals’ tax returns Peter Lumb September 2009.
Using Technology Effectively Caroline Hargrove World Rowing Coaches Conference 22 nd January 2011.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
City Council Meeting Agenda Items October 28, 2013.
25 seconds left…...
Controlling as a Management Function
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Clock will move after 1 minute
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
STATE OF OUR FACILITIES REPORT bellwether of the asset management plan evolution of the three year rolling timeline Ivan Graff Office of Acquisition and.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
DOE Order 413.3A Program and Project Management for the Acquisition of Capital Assets Catherine Santana Deputy Director, Project Management Systems, OECM.
PULSE Building Renovation
Presentation transcript:

STRATEGIC PETROLEUM RESERVE BAYOU CHOCTAW CAVERN 20 REPLACEMENT 1

BC-102 BC-20 2

CD-0 07/21/09 (A) Approves Mission Need CD-1 03/09/10 (A) Approves Alternate Selection and Cost Range Prerequisites Completion of Conceptual Design Report(s) Development of Acquisition Strategy Evaluation of Project Risks and Hazards Analysis Value assessment (e.g., need to perform Value Engineering Study) Approves initiation of engineering design and land acquisition Approves acquisition of LLE BAYOU CHOCTAW CAVERN 20 REPLACEMENT CRITICAL DECISIONS 3

CD-205/27/11 (A) Approves Performance Baseline Prerequisites Completion of Project Execution Plan Establishment of Performance Baselines An External Independent Review Approves acquisition of construction in FY 2011 CD-305/27/11 (A) Approves start of construction CD-409/07/12 (Submission) 01/15/13 (Approval) Approves start of operation, turnover to Operations and Maintenance BAYOU CHOCTAW CAVERN 20 REPLACEMENT EXECUTIVE SUMMARY 4

STRATEGIC PETROLEUM RESERVE CAVERN REPLACEMENT AT BAYOU CHOCTAW ACTIONS & ACTIVITIES: Land Acquisition – Corps of Engineers Just Compensation Letter was sent to P/L Olefins and the Wilberts 90 Day Notice to Vacate Sent to P/L on 3/24/11 to vacate by 6/27/11 Condemnation Letter Sent to the Wilberts on 4/13/11 Negotiations completed on 4/25/11. File sent to Legal on 4/26/11 D-T package to Corps Division Office 7/9/11 Right-of-Way available on 10/31/11 PL Olefins working on the removal of its ethane (personal property) 5

STRATEGIC PETROLEUM RESERVE CAVERN REPLACEMENT AT BAYOU CHOCTAW ACTIONS & ACTIVITIES: (cont) AFC Facilities Phase I Design is Complete 100% Phase II Design is Complete Well LLE has been Awarded and is Being Manufactured. Bids Received for Phase I Construction Package 6

STRATEGIC PETROLEUM RESERVE CAVERN REPLACEMENT AT BAYOU CHOCTAW LOOK AHEAD AFC Facilities Phase II Design Pre-Qualify Drilling Mgmt Services Contractor Complete Manufacture of Drilling LLE Award Phase I Facilities Construction Complete Condemnation Process for Land Acquisition 7

STRATEGIC PETROLEUM RESERVE CAVERN REPLACEMENT AT BAYOU CHOCTAW CONCERN P/L has notified USACE / DOE that Relocation Efforts may take up to 6 Months Negotiations are Ongoing on this Mitigative Measures are Being Identified and Implemented to Maintain Overall Project Schedule 8