Energy24 limited Modification Proposal 0502: Amendment to Gas Quality NTS Entry Specification at the px Teesside System Entry Point.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Information Transparency Proposal Transmission Workstream 2 nd November 2006 Presentation by Abid Sheikh, energywatch and Angela Love, Poyry Energy.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
Domestic Natural Gas Installations Marc Billington.
Didcot Biomethane to Grid project Learning Points SGN and CNG Services Ltd (CSL)
Transfer & Trades Special Transmission Workstream
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Bacton blending feasibility study Gas Quality Workshop 23 April 2007 Dr Nick Bates, National Grid Gas Transmission.
Gas emergency cash-out Ofgem perspective Transmission Workstream - 3 July 2008.
Metering Standards and Impact on Shrinkage Issue for Consideration 1 October 2009 for Gas Transmission Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
“Amendment of Network Entry Provisions at the European Interconnector NTS sub- terminal at Bacton" Transmission Workstream 1 st December 2005.
Review Group -140 Thoughts on additional information requirements.
Entry Capacity transfers in the constrained period Transmission Workstream 5 th October 2006.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
System Operator information transparency. As Transmission System Transporter National Grid Gas undertakes responsibility for safe, effective and efficient.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Transmission Workstream 6 January 2011
Wales & West Utilities Entry – Standard Special Condition D12
Entry Capacity Overrun price calculation
Transmission Planning Code – Draft Document
Transmission Workstream, 01 October 2009
Review of UNC Section Q “Emergencies”
Code Governance Review UNC Modification Proposals
Transmission Planning Code
Study on interoperability in and gas quality in SSE
Transmission Workstream, 2nd March 06
Transmission Workstream 4th July 2007
Study on interoperability in and gas quality in SSE
UNC Modification Proposal 0373
UNC Trader User – Licence obligations
Transmission Workgroup – 1st December 2011
Proposer: BP Gas Marketing Ltd Panel Date: 17 April 2014
Study on interoperability in and gas quality in SSE
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Amendment to NEA & NExA Measurement Provisions Change Process
Simon Trivella – 22nd May 2008 Distribution Workstream
0332 – Impact of combining the Entry and Exit Capacity credit processes Chris Shanley.
UNC Modification Proposal “Allocation of Daily NTS Entry Capacity Within-Day” Richard Fairholme.
Assignment of NTS Entry Capacity – Background and UNC Obligations
Transmission Workgroup June 7th 2012
Development of Entry Capacity Substitution
Transmission Planning Code Review
Modification 501 slides for Workgroup
Long Term Non Firm Capacity Update
Transmission Workstream – Partial Assignment
Transmission Workstream 1st September 2005
Review of Trade and Transfer Winter 09/10
Richard Fairholme Transmission Workstream 4th September 2008
Assured Pressures Proposal
Entry Overrun Calculation
Reinstatement of NTS Interruption
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Modification Proposal Amendment of IUK’s Minimum Wobbe Limit
Information Provision for Transitional Exit Capacity
Open Letter - Summary of Responses
Transmission Workstream 1st February 2007
Stefan Leedham Transmission Workstream 2nd November 2006
IECR Incremental Step Size
Title slide [from Title Slide master]
195AV “Future work” – system flexibility
Commercial Arrangements For Gas Quality Service – Introduction
Assignment of NTS Entry Capacity – Work currently being Undertaken
Transmission Workstream, 1 Mar 07
OFFERING CAPACITY AT DONOR ASEP IN TRADES & TRANSFER PROCESS
Presentation transcript:

Transmission Workstream 6th November 2008 Modification Proposal: Amendment to px (TGPP) Limited Network Entry Agreement Transmission Workstream 6th November 2008

Background 1 The Wobbe Index of a unit of gas provides a measure of the energy released during combustion. The Calorific Value (CV) of a unit of gas provides a measure of the heat released during combustion. GS(M)R limits the range of Wobbe Index that National Grid Gas (NGG) can accept into the NTS to between 51.41 and 47.20 MJ/m3 for safety reasons. The GS(M)R CV range is between 42.3 and 36.9 MJ/m3. The site specific limits to Wobbe Index and Calorific Value are detailed in the Network Entry Provisions in the px (TGPP) Network Entry Agreement (NEA). The Wobbe Limits and CV ranges set out in the px (TGPP) NEA are more restrictive than necessary to satisfy GS(M)R.

Background 2 Energy24 believes that other ASEPs have been given the full GS(M)R range for Wobbe and CV and the existing px (TGPP) Network Entry Provisions may act to constrain the amount of gas that can enter the NTS at this Teesside ASEP. The proposal, therefore, is to align the px (TGGP) Network Entry Provisions with the GS(M)R limits In addition, the delivery pressure of gas into the NTS as stated in the px (TGPP) Network Entry Provisions is currently 75 barg. The actual pressure rating of the pipe-work downstream of the Teesside ASEP is 70 barg and it is therefore proposed to correct this anomaly.

Modification Proposal [Insert Proposal Number] Proposal [insert mod number ] seeks to: Lower the minimum Wobbe Limit set out in px (TGPP) Network Entry Provisions to the GS(M)R limit of 47.20MJ/m3. Reduce the CV lower range set out in the px (TGPP) Network Entry Provisions to align with the lower GS(M)R range of 36.9MJ/m3. Lower the Delivery Pressure set out in the px (TGPP) Network Entry Provisions to 70barg to reflect the physical capability of the downstream pipe-work. Energy24 believes that National Grid supports these changes

Modification Proposal [Insert Mod Number] Benefits: Enhance the availability of gas supplies at the Teesside System Entry Point Offer increased scope to process a wider range of offshore gas supplies and support the development of new gas fields with different gas compositions Enhanced Security of supply by supporting UKCS production Increased competition between ASEPs to attract offshore production