Donald Hamadyk Director, Research and Development

Slides:



Advertisements
Similar presentations
Supporting New Business Imperatives Creating a Framework for Interoperable Media Services (FIMS)
Advertisements

© 2009 Autodesk Autodesk’s Commitment to BIM-MEP AUS Rob Malkin, Director ANZ Architecture, Engineering and Construction.
1 NYP BEST PRACTICES EXISTING CONDITIONS SURVEYS Presentation to Approved A/E Vendors to NYP June 17, 2013.
JUNE 2007 page 1 EDS Proprietary Applications Modernization Services Modernizing the Applications Portfolio.
Panel 5: The Latest in OA Innovation and C4ISR 4 November, 2014 Mike Rice President / Senior Systems Engineer R2E Inc.
1 Inherently Linked!!!! RequirementsResourcesAcquisitionSustainment Requirements Resources Acquisition and Sustainment Changing the Acquisition Paradigm.
A Navy Business Initiative Defense Daily OA Summit 12 November 2013 Nickolas H. Guertin, PE Director for Transformation DASN RDT&E
Distribution Statement A:: Approved for Public Release. Distribution is Unlimited Panel: The Power of Modularity and New Open Business Models Dr. Megan.
Office of the Secretary of Defense Defense Microelectronics Activity (DMEA) Defense Microelectronics Activity (DMEA) Doug Casanova Defense Microelectronics.
CDR A.J. Hoffman PEO IWS 1AD AEGIS Baseline Development
Flexible Warships in Foreign Navies: Applications for Future U. S
Unlocking Potential 1 Understanding the Open Business Model The value proposition for the government – Learning from industry DISTRIBUTION STATEMENT A.
Copyright © 2011 Raytheon Company. All rights reserved Customer Success Is Our Mission is a registered trademark of Raytheon Company. Statement A: Approved.
2015 Small Business Outreach and Industry Day
Azad Madni Professor Director, SAE Program Viterbi School of Engineering Platform-based Engineering: Rapid, Risk-mitigated Development.
Eleventh Edition 1 Introduction to Information Systems Essentials for the Internetworked E-Business Enterprise Irwin/McGraw-Hill Copyright © 2002, The.
Flexible Ships Affordable Relevance over the Life Cycle
Nickolas Guertin, PE DASN RDT&E, Director for Transformation
Business Plan Components SectionNumber of Pages Executive Summary1 Company2-3 Management1-2 Product3-5 Market4-7 Competition2-3 Sales and Marketing3 -5.
1 EVALUATING INTELLIGENT FLUID AUTOMATION SYSTEMS USING A FLUID NETWORK SIMULATION ENVIRONMENT Ron Esmao - Sr. Applications Engineer, Flowmaster USA.
Submitted By Tanmoy Mondal IIFT MBA (IB) The future lies on Business transformation & Employee- Organizational Alignment.
TEKNOLOGI IKERTEGIA TECHNOLOGICAL RESEARCH CENTRE Dependable applications for DeSIRE (Pisa November 2002) A.R.Olano/Ikerlan
Future Airborne Capability Environment (FACE)
1 A Perspective on New Maritime Strategy in the Current Environment John O’Neill.
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
MDS Global IT Strategy Discussion July 7, Agenda  IntroductionErnest  Strategic directionsGanesh  DiscussionAll  Next stepsErnest.
© Mahindra Satyam 2009 Decision Analysis and Resolution QMS Training.
RBC Supply Chain Solutions. Who we are ? RBC Sourcing provides e-procurement solutions through a unique blend of proven on-demand technologies, affordable.
Yellow Team Sketch Models Living and Working in Constrained Space.
Build the Right Team 1 Organize for Success 2 Build Coalition with Business Partners 3 Maintain Flexibility 4 Key Success Factors KSF 1.1: Relentlessly.
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
GREG CAPPS [ ASUG INSTALLATION MEMBER MEMBER SINCE:1998 ISRAEL OLIVKOVICH [ SAP EMPLOYEE MEMBER SINCE: 2004 GRETCHEN LINDQUIST [ ASUG INSTALLATION MEMBER.
Supporting New Business Imperatives Creating a Framework for Interoperable Media Services (FIMS)
Access to Enabling Technologies for Innovation
Interim SCIM and STEP Implementation 2008 System Technology Panel Project Ted Briggs, Intergraph Mike Olson, Northrop Grumman Ron Wood, Northrop Grumman.
March 2004 At A Glance NASA’s GSFC GMSEC architecture provides a scalable, extensible ground and flight system approach for future missions. Benefits Simplifies.
Next Generation ISEA Roadmap
EGovOS Panel Discussion CIO Council Architecture & Infrastructure Committee Subcommittee Co-Chairs March 15, 2004.
Mine Warfare - A Total Force Approach for the Future
E-commerce Platforms 10 th March 2010 Lifecycle of a successful e-commerce platform Ralph Lorkins Solution Architects Manager Claranet UK.
ELECTRONIC SERVICES & TOOLS Strategic Plan
Driving Innovation Concept to Commercialisation A strategy for business innovation, David Bott Director of Innovation Programmes Mark Glover.
Driving Innovation Technology Strategy Board The UK’s agency for business innovation –Business benefit –Economic growth –Quality of life.
Developing Products and Services. ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 6,
Making Choice Possible in the Acquisition of Machinery Control Systems Program Executive Office Integrated Warfare Systems (PEO IWS)
Life at Oracle Inseok Chong, Ph.D. Consulting Member of Technical Staff.
Open GIS Consortium Charles Heazel March 19, 2003.
Azure Stack Foundation
Open Platform 3.0™ Overview – 3rd August 2016 Dr Christopher J Harding
Multi-Purpose Reconfigurable Training System (MRTS) Overview
Critical Factors in Managing Technology
Exploring Application Lifecycle Management and Its Role in PLM
Flexible Infrastructure Bulkhead Track Improvements Final briefing to NSRP SWSI Panel March 29, 2018 John Walks Ingalls Shipbuilding Mechanical Engineer.
Extending Your Integration Strategy
Performance Playbook for GPO Value
Lockheed Martin Canada’s SMB Mentoring Program
Supply Chain Transformation Highlights
ESA's TEC Directorate Asset Management - Present and Future
Ship Design & Material Technologies Panel
Evaluation of Plasma Beam Technology for Coating Removal
2019 NSRP All Panel Meeting March 12-14, 2019 Charleston, SC.
NSRP Workforce Development Panel – Navy Program Manager Thoughts
SWSI Panel Meeting March 14, 2019 Charleston, SC.
DCN# Jamie Breakfield R&D Project Manager/Systems Engineer
BROADBAND SA CONNECT - AN OPPORTUNITY FOR SMALL ICT BUSINESSES
Shore Power Connector Tester
Cost Reduction of Shock Application Project Overview for NSRP Panel Meeting July 16, 2019 Kristi Carroll and John Walks.
Build Your Future Shipbuilding and Ship Repair Works!
NSRP Electrical Technologies Panel Meeting – July 23-24, 2019
Opportunities and Challenges
Presentation transcript:

Donald Hamadyk Director, Research and Development HII-Newport News Shipbuilding

Accelerated Capability Needs for Future Surface Combatants: An Ecosystem View Don Hamadyk Director, R&D HII-Newport News Shipbuilding Member, NSRP Executive Control Board

Related Themes From “Modular Adaptable Ships” THE NEED THE PHYSICS THE OPPORTUNITIES From WIKIPEDIA: Birmingham CL-2 RAND - Designing Adaptable Ships – Modularity and Flexibility in Future Ship Designs Cover Illustration

Power Competition = Shifting of Gears The NEED AGILITY !! Power Competition = Shifting of Gears

F=ma Will Remain In Effect For The Foreseeable Future The PHYSICS STABILITY SHOCK MANEUVERING & CONTROL SYSTEM TECHNICAL PERFORMANCE CORROSION SURVIVABILITY POWER MANAGEMENT SIGNATURES HYDRODYNAMICS F=ma Will Remain In Effect For The Foreseeable Future

The OPPORTUNITIES OPEN ARCHITECTURE SWAPc / MARGINS COMMONALITY ADVANCED WEAPONS ADVANCED SENSORS ADVANCED HULL MATERIALS OPEN ARCHITECTURE SWAPc / MARGINS COMMONALITY BUILD STRATEGY AFFORDABILITY PRODUCIBILITY ADVANCED COATINGS Challenge: Feasibly Match Capabilities to Technologies to Pathways

Example Enabler: Flexible Infrastructure (FI) A system of systems that provides the capability for rapid compartment re-fit without the use of “hot work” and provides the following benefits: Objectives: Maximize time for technology development prior to equipment installation during construction outfitting Eliminate cost and schedule impacts associated with the traditional conflicts from re-work and change orders during new construction Ease compartment reconfiguration to support changing missions and lifecycle refresh of electronic components

Flexible Infrastructure – Path To Adoption IR&D NSRP ManTech SBIR CVN Application Surface Navy Concept RA & Panel Projects Standards / Interfaces / Quals Track Profile False Deck Panel Improvement Testing Prototyping POC CVN77 CVN72 CVN73 CVN79 LHA 7 FUTURE SURFACE COMBATANTS DDG114 LPD 28 LHA8 Complete Creating The Pathways In Progress

Flexible Infrastructure – False Deck Panel Improvement IR&D CVN 79 DFA NSRP ManTech CVN Application Surface Navy Concept: Reduce Cost/ Expand Supplier Base Survey Industry for Potential Solution Performed FI Tile System Functional Analysis Developed FI Deck Tile Performance Specification Material Investigation Performed Prototype Tile Developed Testing Performed X-Platform MIL-PRF Developed From Performance Specification Industry Survey Performed and Material & Processes Evaluated Vendor Prototypes Developed IAW MIL-PRF Fire/ Mechanical Testing and Qualification CVN73 CVN79 CVN80 CVN81 LPD 29 LHA8 FUTURE SURFACE COMBATANTS Complete The Hard Work of Technical Rigor In Progress

Digital Thread Emerging Opportunity For Acceleration Digital Connections Will Increasingly Shape and Enable The Opportunities

The NEED The PHYSICS The OPPORTUNITIES