FD TIG Closing Report Date: Authors: September 2018 Name

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1301r0 Submission September 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG September 2014 Closing Report Date: Authors:
Advertisements

Submission doc.: IEEE 11-14/0114r0 January, 2014 James Gilb, TensorcomSlide 1 Requirements for Next Generation mmWave Systems Date: Authors:
Doc.: IEEE /0819r1 Submission May 2011 Tom Siep, CSRSlide 1 Text for Call for Technical Contributions Date: Authors:
1st Vice Chair Report - Sept Waikoloa
1st Vice Chair Report – November 2017 – Orlando, Florida
Month Year Month Year doc.: IEEE yy/xxxxr0 doc.: IEEE /0135r0
Extremely High Throughput (EHT) – Way forward
FD TIG agenda Date: Authors: November 2018 Name
Corrections for D2.8 Date: Authors: May 2014 Name
Extremely High Throughput (EHT) – Way forward
FD TIG Closing Report Date: Authors: July 2018 Name
Spec Text Motion Date: Authors: March 2018 Month Year
Spec Text Motion Date: Authors: July 2018 Month Year
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
Motions for 2007/09 Date: Authors: September 2007
January 2018 WG Motions Date: Authors: January 2018
FD TIG agenda Date: Authors: November 2018 Name
FD TIG agenda Date: Authors: November 2018 Name
TGp Closing Report Date: Author: November 2008 Month Year
FD TIG agenda Date: Authors: July 2018 Name Affiliations
Septe 2018 doc.: IEEE November 2018
Snapshot Slide for TGbc
Closing Report Date: Authors: September 2009 September 2009
FD TIG mid-week report Date: Authors: September 2018 Name
Extremely High Throughput (EHT) – Way forward
FD TIG mid-week report Date: Authors: September 2018 Name
FD TIG agenda Date: Authors: September 2018 Name
FD TIG Closing Report Date: Authors: May 2018 Name
FD TIG agenda Date: Authors: July 2018 Name Affiliations
<month year> doc.: IEEE <492> November 2018
FD TIG agenda Date: Authors: March 2018 Name Affiliations
Liaison from to Date: 15 November 2018
Septe 2018 doc.: IEEE November 2018
FD TIG agenda Date: Authors: July 2018 Name Affiliations
RTA TIG Agenda Date: Authors: January 2019
Submission Title: [ e Closing Report for Jan 2015 Session]
Radio Resource Measurement Closing Report to the Working Group
1st Vice Chair Report – November 2017 – Orlando, Florida
FD TIG Summary for EHT Date: Authors: November 2018 Name
FD TIG Closing Report Date: Authors: September 2018 Name
TGs LA Closing Report Date: Author: January 2011
IEEE Liaison Report for
FD TIG mid-week report Date: Authors: September 2018 Name
FD TIG Conference call agendas
<month year> doc.: IEEE < e> <March 2016>
Light Communications Topic Interest Group July 2017 Closing Report
Auto SG July 2016 Closing Report
IEEE Liaison Report for
Text Update on PHY Abstraction and SP
Straw polls and Motions on Spec text for and
FD TIG agenda Date: Authors: July 2018 Name Affiliations
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
FD TIG agenda Date: Authors: May 2018 Name Affiliations
Light communications for
FD TIG agenda Date: Authors: May 2018 Name Affiliations
TGp Closing Report Date: Author: September 2007 Month Year
FD TIG Summary for EHT Date: Authors: November 2018 Name
Straw polls and Motions on Spec text for and
FD TIG agenda Date: Authors: May 2018 Name Affiliations
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
DLS SG Closing Report Date: Authors: March 2007 Month Year
FD TIG Summary for EHT Date: Authors: November 2018 Name
Report on Date: Authors: January 2019 July 2013
WNG SC Closing Report Date: Authors: May 2019 July 2013
RCM TIG Agenda Date: June 2019 Author(s): Name Affiliation
BCS SG Closing Report Date: Authors: September 2018
Closing Plenary Meeting Report for SG 100G Group (1/2)
WNG SC Closing Report Date: Authors: May 2019 July 2013
RCM TIG Agenda Date: Sep 2019 Author(s): Name Affiliation
Discussion on The EHT Timeline and PAR Definition
Presentation transcript:

FD TIG Closing Report Date: 2018-11-15 Authors: September 2018 Name Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2018 FD TIG Closing Report Date: 2018-11-15 Authors: Name Affiliations Address Phone email Kome Oteri InterDigital Kome.oteri@interdigital.com Slide 1 1 1 Page 1 John Doe, Some Company

Abstract Closing Report for: Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2018 Abstract Closing Report for: 802.11 FD TIG (Full Duplex Technical Interest Group) November 2018 Mariott Marquis Queen’s Park, Bangkok, Thailand Chair: James Gilb (GA-ASI, USD, Gilb Consulting, GenXComm) Acting Chair/Secretary: Kome Oteri (InterDigital) James Gilb (GA-ASI, USD, Gilb Consulting GenXComm) 2 2 Page 2 John Doe, Some Company

Ran Straw Poll at Mid-week plenary September 2018 Accomplishments 2 time slots Ran Straw Poll at Mid-week plenary Option 1: Standalone project on full duplex : 55 Option 2: EHT project should include full duplex : 96 Option 3: none of the above : 78 Ran internal SPs to plan future sessions James Gilb (GA-ASI, USD, Gilb Consulting GenXComm) 3

Do we support forming a SG ? November 2018 SPs Do we support forming a SG ? 0/ 17 / 8 Do you support stopping the operation of the FD-TIG ? 16/ 11 / 3 Do you support the continuation of FD-TIG to have a focused study and discussion, and provide information to EHT ? 15 / 11 / 6 Conclusion: Do not form an SG James Gilb (GA-ASI, USD, Gilb Consulting GenXComm)