License Amendments Patrick Boyle Nuclear Engineer

Slides:



Advertisements
Similar presentations
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Advertisements

1 Extension of Construction Authorization for the Mixed Oxide Fuel Fabrication Facility David Tiktinsky Senior Project Manager Division of Fuel Cycle Safety,
1 Current Reviews of Standards by NRC Tom Boyce, NRC/RES/RGDB Nuclear Energy Standards Coordination Collaborative (NESCC) November 7, 2013.
Albert Coons April 21, 2009 Emergency Preparedness and New Reactor Licensing Process: An Update on Where We Are Now Federal Emergency Management Agency.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
Learning Objectives LO1 Prepare reports for review and compilation of unaudited financial statements, given specific facts. LO2 Write a report on a review.
NREP 2009 Emergency Preparedness and the New Reactor Licensing Process: An Update on Where We Are Now Dan Barss Division of Preparedness & Response Office.
NRC LICENSE APPLICATION PROCESS
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
CBER Managed Review Process Sheryl A. Kochman Deputy Director, DBA, OBRR, CBER September 15, 2009.
Sole Source Training.
Oconee RPS/ESPS Digital Upgrade Presented by: Michael Bailey June 3,
Design Bases From 1957 to 2003 June 18, 2007 Chuck Casto Region II NRC.
Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.
GSI-191 Status and Lessons Learned Presented by: Donnie Harrison Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Presented at:
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
Stephen Dembek, Section Chief Export Controls and International Organizations Section Office of International Programs Contact Info: ,
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
1 A Dialogue to Raise Awareness of Operating Nuclear Power Plant Issues RIC 2009 Regional Breakout Session A Dialogue to Raise Awareness of Operating Nuclear.
ACADs (08-006) Covered Keywords CFR policy, CFR violation, CFR enforcement Description Supporting Material
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
2.2 Acquisition Methodology. “Acquisition methodology” – the processes employed and the means used to solicit, request, or invite offers that will normally.
Regulatory Framework for Uranium Production Facilities in the U.S.
1 Current Issues in Siting Safety Reviews Michelle Hart, Sr. Reactor Engineer Division of Site and Environmental Reviews NRC Regulatory Information Conference.
1 NEI Process Discussion. 2 Topics for Discussion Relationship to NFPA 805 Relationship to Regulatory Guide Technical Process currently in NEI
Integration of Safety into the Design Process Overview of DOE-STD-1189 Richard Black, Director Office of Nuclear & Facility Safety Policy.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
1 Impact of Revised 10 CFR 50.46(b) ECCS Acceptance Criteria 2009 Regulatory Information Conference Rockville, MD March 12, 2009 Mitch Nissley Westinghouse.
Formative assessment of the Engineering Design process Review questions in handout Write brief, informal answers to each question.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Science & Engineering Research Support soCiety Guest Editor Guidelines for Special Issue 1. Quality  Papers must be double -blind.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
1 EVALUATING DIVERSITY IN DIGITAL I&C SAFETY SYSTEM DESIGNS Michael E. Waterman Digital Instrumentation and Controls Branch Division of Engineering Office.
THE PROFESSIONAL REVIEW – DOCUMENTATION 1.The documentation you must supply, ie, the Engineering Practice Reports Part 1: Training and Experience Part.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
HighImpactSoft 2010 Organizing a Better Future. Agenda Specify Goals ScopeDefinitions Process Model Preliminary Requirements Issues and solutions TraceabilityPrototype.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
1 WELCOME This is for RFP 7227 ONLY Restrooms Cell Phones Turn on vibrate Take calls outside Sign in sheets – please sign in Conference will focus on.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Status Update on the NRC Proposed Rule to Amend 10 CFR Part 61
Upcoming NIH Proposal Preparation Changes
Requirements for Low-Level Radioactive Waste Minimization Plans Rich Janati, M.S., Chief Division of Nuclear Safety PA Dept. of Environmental Protection.
Proposed Revisions to 10 CFR Part 61
Joe Bellini, Exelon Drew Miller Exelon April 6, 2012
South Carolina Perspective on Part 61 Proposed Revisions
Industry Guidance on Part 21 Evaluation and Reporting
NRC’s LLW Regulatory Program: Update of Emerging Issues
10 CFR Part 61 Low Level Waste Disposal Rulemaking Update
Flooding Walkdown Guidance
NRC Export and Import Licensing 10 CFR Part 110
NRC’s LLW Regulatory Program: Update of Emerging Issues
Standards and Certification Training
Alignment of Part 4B with ISAE 3000
Certain asset retirement obligations
State of Configuration Management
Overview of NRC Low-Level Waste Activities and Initiatives
Research and Test Reactors Licensing Program 2013 TRTR Conference
Engineering Waiver Management
MIT Nuclear Reactor Laboratory
Research and Test Reactor Safety: The Regulatory Perspective
Tom Wolf, Governor Patrick McDonnell, PA DEP Secretary
Overview of NRC Low-Level Radioactive Waste Activities and Initiatives
2018 AASHTO Civil Rights Conference
Thomas Koshy, On Behalf of Brian Thomas, Director
Margin Management Configuration Management Benchmarking Group
TRTR Briefing September 2013
Sponsor Ballot Comment Resolution
RESOLUTION OF GENERIC SAFETY ISSUE 191
USOAP Continuous Monitoring Approach (CMA) Workshop
Presentation transcript:

License Amendments Patrick Boyle Nuclear Engineer Research and Test Reactors Licensing Branch

License Amendments 10 CFR 50.90 10 CFR 50.59(c)(1)-Changes may be made without obtaining a license amendment per 50.90 only if: (i) A change to the technical specifications incorporated in the license [Appendix A] is not required (ii) does not meet any of the criteria in … (c)(2) Application for amendment 50.90 Issuance of Amendment 50.92 Noticing 50.91 – not required for most RTR NIST is the only test reactor, and as such is the only one required to notice an amendment (No Significant Hazards Consideration) per 50.91.

License Amendments Submittal Requirements 10 CFR 50.4 - All license amendment requests and supplemental correspondence must be signed and submitted under oath or affirmation including: Initial request Supplemental information Response to a letter from the NRC (RAI) Response to a conversation or email with the NRC provided the question is restated in the response (public disclosure requirement) May be volunteered for clarification Any information not submitted per 50.4 cannot be used in a regulatory decision.

License Amendments Content Per 10 CFR 50.90 must fully describe the changes desired, and following as far as applicable, the form prescribed for the original application What is being changed? What is the relation to safety? How is the safety basis affected? What makes the change acceptable? (especially when safety margin is decreased) These questions should have been developed when performing the 50.59 screening. Now the information needs to go to the NRC to determine acceptability. The answer to an amendment request can be “no.”

License Amendments Safety Analysis If equipment-related, how does it currently function and describe how that function is affected by the change If new equipment or interface is included describe potential failures Build “What if” scenarios Consider partial failures Consider impact to other equipment or ability to operator to respond (is equipment used to make operational decisions?) Discuss redundancy impact (defense in depth)

License Amendments WHY? NRC needs to determine: Do the bases and assumptions make sense? Can the information be independently verified? quantifiable - perform separate calculation/analysis engineering judgment - consistent with current practices Is the impact to safety is acceptable (FINE PRINT: reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner)

License Amendments TS Revisions Marked up original TS Only replace page(s) affected by change (with change bars in margin) Cannot change other sections of TS without specifically addressing in request letter (includes administrative changes) Wholesale replacement of all TS pages requires careful review for unintended changes

License Amendment Opportunities Original bases may need to be more robust Formatting less than ideal TS wording may include ambiguities Equipment function descriptions can be enhanced TS may contradict other sections

License Amendments Current Status License renewal included attempt to “modernize” TS and bases ANS 15.1/NUREG-1537 includes allowance for action statements related to Limiting Conditions for Operation Equipment LAR are very infrequent Currently have 12 amendment request in progress that are not license renewal. Two are administrative in nature, two are related to material possession limits and one is security related. Only one is purely equipment related. Time to process the amendment directly related to complexity and completeness of submittal.

Questions ?