PN Counting from Raw Exhaust via Fixed Dilution and PMP Round Robin Project JRC and ACEA.

Slides:



Advertisements
Similar presentations
PMP Progress Since GRPE 55 GRPE 54 agreed a Roadmap of work to address concerns with ECE/TRANS/WP.29/GRPE/2007/8 ( adding particle number measurement to.
Advertisements

Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 24th WHDC, Geneva, 03 June 2008 Informal document No. GRPE (56th.
PMP: SUB 23 NM MEASUREMENT RECOMMENDATIONS B. Giechaskiel, G. Martini Institute for Energy and Transport Joint Research Centre 3 April 2014.
Institute for Energy and Transport B. Giechaskiel, G. Martini
Revisions To Heavy Duty Validation Report General Numerous clarifications to text as requested at December meeting Partial flow systems referred to consistently.
Particle Measurement Programme (PMP) Progress update
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
1 The Result of Japan’s Round Robin Engine Test: Measurement of PM and PN 3/30/2009 PMP Informal Meeting National Traffic Safety and Environmental Laboratory.
Repeatability and Reproducibility Analysis of the Round Robin Results.
PMPN Report to WLTP DTP 16 Jan 2013 Prepared by Caro Hosier Post 14 and 15th WLTP PMPN Meetings audio / web conferences.
REGENERATION ISSUES Institute for Energy and Transport Joint Research Centre B. Giechaskiel, J. Andersson, G. Martini 3 April 2014.
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 7 th DTP Meeting Bern 12 th – 14 th September 2011 Chris Parkin.
PMP Progress Report Activities since GRPE 58 Heavy Duty Validation testing Exercise completed in October Draft report and draft proposal to insert PN measurement.
Jan Gåsste, AVL MTC Hua Lu-Karlsson, Scania London, PMP Heavy-Duty Inter ‑ Laboratory Exercise Validation Exercise at AVL MTC.
1 Review from previous class  Error VS Uncertainty  Definitions of Measurement Errors  Measurement Statement as An Interval Estimate  How to find bias.
Summary of the latest PMP related activities Giorgio Martini, Athanasios Mamakos* Institute for Energy and Transport Joint Research Centre * Southwest.
PMP: SUB 23 NM REVIEW B. Giechaskiel, G. Martini Institute for Energy and Transport Joint Research Centre 8 January 2014 GRPE-PMP
GRPE 71 ST SESSION PMP INFORMAL GROUP PROGRESS REPORT TO GRPE 8 Jan 2015 Informal document GRPE st GRPE, 8-12 June 2015,
Worldwide Harmonized Heavy Duty Emissions Certification Procedure UNITED NATIONS 57th GRPE, Geneva, 15 January 2009 Informal document No. GRPE (57th.
37 TH PMP MEETING Institute for Energy and Transport Joint Research Centre B. Giechaskiel, G. Martini 7 Oct 2015.
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 38th UNECE IWG PMP MEETING Exhaust emissions.
JRC 30 March Particle Measurement Programme Exploratory work & Validation Exercise (JRC) First Validation Exercise comparisons B. Giechaskiel, G.
RDE testing: how to define NTE emission limits?
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 72th UNECE GRPE session PMP IWG Progress Report.
RDE PN-PEMS programme Progress Update F. Riccobono, B. Giechaskiel, P. Bonnel STU, IET, JRC, European Commission.
PN-Calibration Issues
Technologies for low emission light duty powertrains
India’s Comments on EPPR (Part-B2)
HD CNG ENGINE PN MEASUREMENT
PMP IWG Progress Report
PMP IWG Progress Report
43rd PMP-Meeting Rosa Delgado IDIADA 15/03/ /03/2017 TITLE
Inter-laboratory comparison exercise cpc calibration material: 2nd stage Focus on soot as harmonized calibration material for Automotive PN counters. Generators:
PMP IWG Progress Report
PMP IWG Progress Report
PMP Heavy Duty Validation Exercise
Presented by Harry C. Elinsky, Jr. Filtech, Inc.
Particle Measurement Programme - Report
Technologies for low emission light duty powertrains
Institute for Energy and Transport B. Giechaskiel, G. Martini
Preliminary results of the OEMs HDV PN-PEMS validation study
In-Situ Filter Testing
76th UNECE GRPE session PMP IWG Progress Report
76th UNECE GRPE session PMP IWG Progress Report
77th UNECE GRPE session PMP IWG Progress Report
Exhaust Emissions Light Duty-PMP-2017/2018 Sub23nm Round Robin
Light Duty-PMP-2017/2018 Sub23nm Round Robin
PARTICULATES PROGRAM WP500
WLTP DTP PM-PN Subgroup Activity Report
PMP IWG Progress Report
HD ENGINE RAW PN MEASUREMENT
HD ENGINE RAW PN MEASUREMENT
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans
Exhaust Emissions Light Duty-PMP-2017/2018 Sub23nm Round Robin
LDV Real Driving Emissions: - Drafting of physical PEMS protocol –
Lemnos 11/9/03 Comparison of PM exhaust emissions measured at a chassis dynamometer and on-road chasing on a test track.
Input ACEA Boundary Conditions.
PMP sub-group on CPC calibration
Informal document GRPE Rev1
Inter-Laboratory Comparison Exercise CPC CALIBRATION
PMP – PN sub 23nm Route to transfer from ‘in case of urgent need’ into planned delivery into regulations PMP-48 Presentation from Technical Secretary.
WLTP-DTP Subgroup Additional Pollutants VP2 Results & Open Issues
Revision of the Work Plan
Francesco Riccobono, Barouch Giechaskiel, Pierre Bonnel
PN-PEMS Progress update
78th UNECE GRPE session PMP IWG Progress Report
Current status All European laboratories (except 3rd JRC measurement) have conducted their measurements Equipment finally returned to JRC US, Japanese.
PMP INFORMAL GROUP Exhaust particle emissions – progress report
ACEA and JRC PMP meeting 7/11/2018
PNC and VPR Validation PMP Meeting 30th March 2009
Presentation transcript:

PN Counting from Raw Exhaust via Fixed Dilution and PMP Round Robin Project JRC and ACEA

Current status Interest in this approach confirmed by some engine manufacturers and some instrument manufacturers 01 Series of amendments to Reg. 132 already includes such possibility but the procedure is not defined First analysis of potential benefits/issues presented during the last meetings Correlation with other methods (CVS and partial flow system) and advantages/disadvantages to be checked – Additional data required

Current status Experimental program (Ricardo 37th PMP meeting) Primary dilution (cold / hot) Losses (thermophoresis, agglomeration) Volatile removal efficiency (CS or ET) Pressure effects Time alignment Interested parties are expected to generate data to be then discussed within the PMP group Limited number of tests from JRC from PN-PEMS for HD program

Testing program Raw exhaust sampling Uncertainty vs CVS or PFDS Robustness of systems Technical specifications Equations Sub-23 nm

Testing program Commercial systems should be the base Starting technical requirements from PFDS/PMP or PN-PEMS (eg distance to tailpipe etc) Equations PN-PEMS (+uncertainty estimation) CNG, DPF regenerations, high bio-fuels Crankcase emissions connected to tailpipe Instruments will be calibrated (especially 10 nm CPCs)

Scenario 1* Evaluation testing at OEMs with JRC equipment in 2018 to address open issues Feasibility decision and final technical specifications Round Robin with Golden instrument(s) at tailpipe to evaluate repeatability and reproducibility of raw exhaust method with fixed dilution (no engine to circulate) *assuming no availability of LD Golden instruments

Detailed evaluation program (OEM 1) Instruments (minimum, in green provided by JRC) PMP at CVS or PFDS (+10 nm JRC) PMP at tailpipe (+10 nm JRC) CS at tailpipe (JRC?) (+10nm JRC) Daily protocol WHTC cold, WHTC hot, WHSC, high temperature cycle, “pressure cycle”, WHTC hot High temperature and pressure cycles could be short

Engine 1 (week one) All 3 systems at the same sampling location (more repetitions necessary) Systems 2 and 3 at tailpipe with PCRF high Systems 2 and 3 at tailpipe with PCRF low System 2 with longer sampling line System 2 with different temperature at the sampling line or “pre-diluter” (if applicable) Engine 2 (week two) As above. The engine should be different technology or different aftertreatment concept or concentration levels. Or different fuel. Or different engine capacity

Detailed evaluation program (OEM 2) Instruments as OEM 1 Daily protocol as OEM 1 Engine 1 (week one) If OEM 1 used PFDS, CVS should be used. Engine 2 (week two ) desirable Final protocol decision after OEM 1 or OEM 2 OEM 3: 2-3 days confirmation testing OEM 4: as above OEM 5: as above…