CBT Management and Process

Slides:



Advertisements
Similar presentations
Database vocabulary. Data Information entered in a database.
Advertisements

INFORMATION SYSTEMS APPLIED MULTIMEDIA HIGHER This presentation will probably involve audience discussion, which will create action items. Use PowerPoint.
2/16/2004Sergei Sadilov PH/SFT 1 Bonsai in Integration Testing of Geant4 This presentation will probably involve audience discussion, which will create.
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
Investigating Learner Autonomy in a Virtual EFL Classroom Jo Mynard Research in ELT Conference Bangkok, April 2003 This presentation will probably involve.
Sponsored by the U.S. Department of Defense © 2002 by Carnegie Mellon University July 2002 Pittsburgh, PA Lecture 6: Team Planning.
Project Status Chemical Engineering Lab Scheduler Team 5 This presentation will probably involve audience discussion, which will create action items. Use.
Project Status Group B-4 This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these.
Information & Computer Science Dept.
Al Akhawayn University School of Humanities and Social Sciences Communication Studies Course „Public Relations Communication“ Prof. Dr. Mohammed Ibahrine.
Hospital Management System A complete solution for Hospital Services and Activity This presentation will probably involve audience discussion, which will.
9/5/ AASHTO Trns∙port Estimation TRT Lesly Tribelhorn Mike Fowler Mike Jenkins This presentation will probably involve audience discussion, which.
Ecuador National Executive Committee INTERNATIONAL YEAR OF VOLUNTEERS 2001 IN ECUADOR "NATIONAL EXECUTIVE COMMITTEE" This presentation will probably involve.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Computer Science Program Center for Entrepreneurship and Information Technology, Louisiana Tech University This presentation will probably involve audience.
SWHISA 5th Year Work Plan Session, Bahir Dar, 06 Aug 09, COA SWHISA Finance & Accounting System Project: SWHISA Presenter: COA This presentation will probably.
Final Project Status Presentation May 1, 2003 SPOT Li Geng, Akbar Noorani, Aimee Ronn, Stephen Sisk, Mollie Wendel, Billy.
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
Chapter 3 – The Analysis Workflow CSC532: Fall 2003 Original presentation by Joshua Hughes Zehra Raoshan Kiran Balagani Guang Li This presentation will.
Project Management 1 Project Management for Instructional Technology and Distance Education Projects Welcome to.
Mid Term Report Integrated Framework, Visualization and Analysis of Platforms This presentation will probably involve audience discussion, which will create.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
My Life Scott Stillwell This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these.
Instructor information  Each slide, if applicable, has instructor notes that go with the slide.  Be sure to print the notes pages for reference prior.
US Department of Health and Human Services Health Resources And Services Administration Maternal And Child Health Bureau Diana Denboba This presentation.
Evening High School Ms. Baisden Intro to Computers Intro to Word Processing Typing This presentation will probably involve audience discussion, which will.
CSC 532 Term Paper Topic decision: 10/10/02 This presentation will probably involve audience discussion, which will create action items. Use PowerPoint.
Lecture 12 Managing Project Control and Closure. Project Control The process that allows monitoring and measurement of project progress and directing.
The Design of MCM1 Cayci Suitt, Sal Ledezma, Jimar Garcia, Gene Wie ICS 125 – Ebert 15 May 2001 This presentation will probably involve audience discussion,
THE BOOK BANK MAKERERE UNIVERSITY LIBRARY This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to.
How abstract components are returned when schema.getElementDeclarations() is called – an animation in 3 slides -- schemas that use and July 26, :00pm.
Using Internet Explorer go to driversalert.com Employees who operate vehicles on department business should use the following instructions to access and.
Accenture's IT Challenge Presented by TechVibe This presentation will probably involve audience discussion, which will create action items. Use PowerPoint.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Writing Learning Objectives Workshop
The Evaluation Matrix: When & Where & Who & How Thomas Shuster, Ph.D. Todd Braeger, M.S. Spectrum Consulting / Safe Food Institute 1770 North Research.
Health Resources and Services Administration Maternal and Child Health Bureau Presentation For DataSpeak May, 2003 Health Resources And Services Administration.
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
Create a New Work Order Corrective Maintenance Created by: Tony Bertram-Maxadmin-CHS.
IRRI - Genetic Resources Information Management System (GRIMS) This presentation will probably involve audience discussion, which will create action items.
Compliance Management System. Intelex System Overview Focus Modules: –Permits Management –Monitoring & Measurement –Training Management –Document Control.
Project Management PTM721S
Title of presentation Name(s) of author / presenter / co-authors
LoTAG conference – 1st March 2016
Software Planning Guidelines
Continuous Random Variables
APPLIED MULTIMEDIA HIGHER
TechStambha PMP Certification Training
Description of Revision
Pretest Chapter 17 This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these.
Martha Grabowski LeMoyne College
Final Project Presentation
Martha Grabowski LeMoyne College
Create and Edit Item Records
واشوقاه إلى رمضان مرحباً رمضان
Presented by: Arlene N. Baratang
Evaluation of Data Fusion Methods Using Kalman Filtering and TBM
Continuous Random Variables
Dartmouth College Status Report
PROJECT MANAGEMENT Bill Biddle.
IEEE Rail Transit Vehicle Interface Standards Committee
Baseline Matching / Grading
Test Flow: Acceptance & defect criteria The First half RUP summary
Project - Execution stage
Department of Information Technology (DoIT)
Project Design Document
Minnesota Counties Computer Consortium(MCCC) Community Registry
Managing Project Work, Scope, Schedules, and Cost
Presenting Project Status
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

CBT Management and Process 4/19/2019

Courseware Management and Processes Mission Statement Provide recommendations and guidelines to the Computer-based Training community that identifies the attributes of “Good CBT” processes and product. 4/19/2019

Courseware Management and Processes Objectives Re-establishing the Basics: ISD Model Establish a High Level CBT Development Process Template Establish Metric Recommendations Establish Quality Standard Recommendations Set Recommendations for ADL/SCORM as it Drives the Process 4/19/2019

Why Processes and Metrics? Streamline Approach to Courseware Development Collect Analyze Improve 4/19/2019

METRIC MANAGEMENT SYSTEM This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during your presentation In Slide Show, click on the right mouse button Select “Meeting Minder” Select the “Action Items” tab Type in action items as they come up Click OK to dismiss this box This will automatically create an Action Item slide at the end of your presentation with your points entered. METRIC MANAGEMENT SYSTEM The Boeing Company Integrated Defense Systems Mario A. Trejo 4/19/2019 V6.1a

Metric Management System Objective Identify the requirements of a metrics system for courseware development and Process Based Management as it relates to: Quality Timeliness Efficiency Cycle Time Process Compliance 4/19/2019

Metric Management System Called MMS Consists of several integrated tracking systems Tracks Quality Performance Timeliness Cycle Time Process Compliance 4/19/2019

MMS Project Prototype developed in MS Access Multi-Phase development project Each phase is based on the tracking system being integrated MMS administration tools are upgraded with each tracking system 4/19/2019

Integrated Tracking Systems Internal Discrepancy Tracking External Discrepancy Tracking Product Development Tracking Process Surveillance Tracking Quality, Timeliness, Efficiency, and Cycle Time Monitor 4/19/2019

Internal Discrepancy Tracking System Internal Discrepancy Tracking System is completed Used on all projects to track internal deficiencies Tracks Deficiency Reports Lesson Element Checkpoint Recorder Recorded Date Attribute Type deficiency quantities Notes 4/19/2019

Internal Discrepancy Tracking System Reports Hours of instruction reviewed Deficiencies per Hour Of Instruction reviewed Deficiencies by Checkpoint Deficiencies by Attribute Type per Checkpoint Deficiencies by Course 4/19/2019

External Discrepancy Tracking System External Discrepancy Tracking System is completed Used on some projects to track External Discrepancy Reports Tracks Deficiency Reports Checkpoint Lesson Element Recorder Recorded Date Discrepancy, description Recommendation, for corrective action Disposition, corrective action Recorder’s Name, corrective action reviewer Notes Attribute Type deficiency quantities 4/19/2019

External Discrepancy Tracking System Reports Hours of instruction reviewed Deficiencies per Hour Of Instruction reviewed Deficiencies by Checkpoint Deficiencies by Attribute Type per Checkpoint Deficiencies by Course 4/19/2019

Product Development Tracking System (1 of 3) Product Development Tracking System is in development Used on three different types of projects Tracks Media Types Tracks Element Types Tracks Content Types Tracks Checkpoints 4/19/2019

Product Development Tracking System (2 of 3) Tracks Project Scheduled Start and Scheduled Completion Dates Monthly Budgeted and Actual Hours Monthly Budgeted and Actual Dollars Tracks Course and Lesson Title and Number Actual Start and Actual Completion Dates Tracks Lesson Checkpoint Scheduled Person/Group and Actual Person/Group Lesson task weights 4/19/2019

Product Development Tracking System (3 of 3) Tracks similar information for Major Topics and Subtopics Tracks Cost Performance Index Tracks Scheduled Performance Index 4/19/2019

Product Development Tracking System Reports (1 of 3) Project Timeline Scheduled versus Elapsed Project Checkpoint Performance Scheduled versus Completed Project Hours Scheduled versus Used Course And Lesson Percent Completed Course Hours Scheduled and Completed 4/19/2019

Product Development Tracking System Reports (2 of 3) Monthly Hours Scheduled and Used Monthly Accumulative Hours Monthly Index Cost Performance Index Scheduled Performance Index Deficiency Report Project/Course Percent Completed Course/Lesson Percent Completed 4/19/2019

Product Development Tracking System Reports (3 of 3) Topic Performance Scheduled versus Completed Topic Hours Scheduled and Completed 4/19/2019

Process Surveillance Tracking System Process Surveillance Tracking System is completed Used on several projects Tracks Management Process Verify process existence, approval, and usage Process Requirements Verify Development Process requirements have been met Process Tasks Verify Development Process are being followed 4/19/2019

Process Surveillance Tracking System Reports IS 6.06.05 Process Compliance IS 6.06.05 Task Compliance Total quantities of Process Surveillance Nonconformance results Monthly quantities of Process Surveillance Nonconformance results Monthly Risk Level assessments 4/19/2019

QTEC Monitor Quality, Timeliness, Efficiency, and Cycle Time Status Project Level Program Level Instructional Systems Level 4/19/2019

QTEC Monitor Reports (1 of 2) Quality, Timeliness, Efficiency, and Cycle Time Reports Minimum/Maximum Acceptable Levels Goals Actual Status 4/19/2019

QTEC Monitor Reports (2 of 2) Instructional Type Development hours Total Monthly Scheduled Actuals Development hours per hour of instruction ratio Task Type 4/19/2019

Two Year Goals Finish PDT and QTEC Reports Integrate with Employee Timekeeping System Integrate with Earned Value Management Tracking System Stabilize user interface Stabilize database structure Migrate user interface to ColdFusion Convert database to Oracle Require all projects to use MMS 4/19/2019