TGaf Waikoloa Closing Report

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0095r0 Submission July 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for July 2013 Notice: This document has been prepared to.
Advertisements

Doc.: IEEE /0460r1 Submission March 2015 Slide 1 IEEE ah Closing Report for March 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE /1291r0 Submission November 2009 Matthew Gast, Trapeze NetworksSlide 1 November 2009 TGmb Closing Report Date: Authors:
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
Doc.: IEEE /0185r0 Submission September 2012 Prabodh Varshney, NokiaSlide af Liaison Report Notice: This document has been prepared to.
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: IEEE /0077r1 Submission May 2013 Hyunduk Kang, ETRISlide 1 TG1 Closing Report for May 2013 Notice: This document has been prepared to assist.
Doc.: IEEE /0382r0 Submission IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone Hiroshi MANOAlliedtelesis R&D.
Doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 1 TGy July Closing Report Date: Authors:
TGv Closing Report March 2008
TGaf Dallas Closing Report
IEEE TGz Vancouver Agenda
TGs Process, July Date: Author: July 2009 July 2009
TGaf San Francisco Closing Report
IEEE TGai Closing Report
IEEE TGai Closing Report
TGaf Waikoloa Closing Report
TGae Closing Report – January 2010
TGs San Diego Closing Report
TGae Closing Report – March 2010
IEEE TGai Closing Report
802.11af Liaison Report Date: Authors: November 2011
802.11af Liaison Report Date: Authors: January 2012
802.11af Liaison Report Date: Authors: March 2012
TGae Closing Report – May 2010
IEEE TGaf Beijing Closing Report
TGs Atlanta Closing Report
TGs Waikoloa Closing Report
July 2009 TGmb Closing Report
TGaf Geneva Closing Report
IEEE TGaf Waikoloa Closing Report
TGs Process, July Date: Author: July 2009 July 2009
TGaf Indian Wells Closing Report
TGaf San Francisco Closing Report
IEEE TGaf Orlando Closing Report
IEEE TGaf Dallas Closing Report
TGaf San Antonio Closing Report
IEEE TGaf Singapore Closing Report
January 2011 Closing Plenary Motions
Tgae Closing Report – November 2009
IEEE TGaf DRAFT Meeting Plan and Agenda
September 2009 TGmb Closing Report
July 2009 TGmb Closing Report
TGs Process, July Date: Author: July 2009 July 2009
TGs Process, September Date: Author: September 2009
IEEE TGaf Palm Springs Closing Report
TGu Teleconference Motions
September 2009 Closing Report
TGae Closing Report – July 2010
November 2010 Closing Report
TGm Closing Report – May 2010
TGaf Orlando Closing Report
TGaf Nanjing Closing Report
TGae Closing Report – July 2011
TGae Closing Report – January 2011
TGaf San Antonio Closing Report
802.11af Liaison Report Date: Authors: January 2013
802.11af Liaison Report Date: Authors: July 2011 Month Year
IEEE TGai Closing Report
TGae Closing Report – November 2011
TGs San Diego Closing Report
IEEE aj May Closing Report
July 2009 Closing Report Date: Authors: July 2009
TGaf Waikoloa Closing Report
TGaq Closing Report Date: Authors: March 2015 March 2015
IEEE TGaf Beijing Closing Report
TGae Closing Report – September 2010
Presentation transcript:

TGaf Waikoloa Closing Report April 2009 doc.: IEEE 802.19-09/xxxxr0 May 2013 TGaf Waikoloa Closing Report Date: 2013-05-17 Authors: Rich Kennedy, BlackBerry Rich Kennedy, Research In Motion

April 2009 doc.: IEEE 802.19-09/xxxxr0 May 2013 Abstract This presentation is the closing report for the 21st face-to-face meeting of IEEE 802.11 TGaf, taking place the week of May 13th, 2013 at the IEEE 802 Wireless Interim in Waikoloa. Rich Kennedy, BlackBerry Rich Kennedy, Research In Motion

Plan for the Week Approve meeting and teleconference minutes May 2013 Plan for the Week Approve meeting and teleconference minutes Regulatory update Review the results of LB195 Review of the progress since March Editorial review; spreadsheet 11-12/1017r42 Review and Approve all comment resolution submissions Update the draft and comment resolution spreadsheet with approved changes, and request a recirculation letter ballot Prepare a PAR extension request Plan for July meeting and teleconferences Rich Kennedy, BlackBerry

May 2013 TGaf Accomplishments Reviewed the comment spreadsheet and resolved all of the remaining comments from LB195 Requested the Editor to prepare D5.0 and then asked WG to start a recirculation letter ballot Prepared a PAR extension request Planned for July meeting, and weekly teleconferences Tuesdays at 21:00 ET for 2 hours Rich Kennedy, BlackBerry

Plan for July Approve Waikoloa and Teleconference minutes May 2013 Plan for July Approve Waikoloa and Teleconference minutes Review and resolve comments from the recirculation letter ballot on Draft 5.0 Ask the WG for a recirculation letter ballot and request conditional approval to go to Sponsor Ballot Request an extension of the PAR Plan for September and Teleconferences Rich Kennedy, BlackBerry

TGaf Timeline – Updated May 2013 January 2010 doc.: IEEE 802.11-yy/xxxxr0 May 2013 TGaf Timeline – Updated May 2013 Initial Working Group Letter Ballot: January 2011 Second Working Group Letter Ballot: July 2012 Recirculation Letter Ballot: January 2013 Form Sponsor Ballot Pool: June 2013 Initial Sponsor Ballot: September 2013 Recirculate Sponsor Ballot: November 2013 Final WG/EC Approval: March 2014 RevCom/Standards Board Approval: June 2014 Rich Kennedy, BlackBerry Michael Montemurro, RIM

Teleconferences Weekly on Tuesdays through July 30th May 2013 Teleconferences Weekly on Tuesdays through July 30th Until recirc is complete, calls will be used for regulatory updates as required Time: 21:00 ET for up to 2 hours Rich Kennedy, BlackBerry

May 2013 Motion Having approved comment resolutions for all of the comments received from LB195 on TGaf D4.0, as contained in document 11-12/1017r45 Instruct the editor to prepare Draft 5.0 incorporating these resolutions and, Approve a 15 day Working Group Recirculation Ballot, asking the question “Should P802.11af D5.0 be forwarded to Sponsor Ballot?” Moved: Rich Kennedy on behalf of the task group. Discussion? Result: 94 / 0 / 1 TG vote: Moved by: Peter Ecclesine, Seconded by: Yongho Seok, Vote:7/0/0 Rich Kennedy, BlackBerry