Richard Fairholme Transmission Workstream 4th September 2008

Slides:



Advertisements
Similar presentations
Code Governance Review: WWU views on potential changes to UNC and the Modification Panel Simon Trivella – 30 th March 2010 Governance Workstream.
Advertisements

Review of industry code governance 26 March 2010.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Mod Publication of UK Wholesale Gas Market Liquidity Data Richard Fairholme E.ON UK Transmission Workstream, August 7 th 2008.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
Moving the QSEC and AMSEC Auctions Update. 2  Presented proposal at October Workstream  Questions / suggestions received, mainly around  Over & Under.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Transmission Workstream 6 January 2011
Moffat - Capacity System Entry Point
Transitional Exit Capacity Proposals -Update
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
Entry Capacity Overrun price calculation
EU Implementation Programme
Grid Code What is the Standard Modification Process? Panel
Review of UNC Section Q “Emergencies”
Grid Code Development Forum – 6 September 2017
Code Governance Review UNC Modification Proposals
Transmission Planning Code
Introduction of Code Contingency Guidelines Document
SO Incentives from April 2010
UNC Trader User – Licence obligations
Transmission Workgroup – 1st December 2011
Proposer: National Grid NTS Panel Date: 17th April 2014
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Code Governance Review UNC Modification Proposals
NTS Entry Charging Review Update
Assignment Workshop 2 16th September 09, Solihull.
Publication of Historical Gas Operational Data by National Grid NTS
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
UNC Modification Proposal “Allocation of Daily NTS Entry Capacity Within-Day” Richard Fairholme.
CSS Update for CoMC 19th September 2018
Richard Fairholme Transmission Workstream, 2nd October 2008
Exit Capacity Substitution and Revision
The Necessary Criteria for a UNC Modification Proposal
Consideration of issues raised by UNC Modification Proposal 0244
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
QSEC auction timetable
Long Term Non Firm Capacity Update
Introduction of Code Contingency Guidelines Document
Transmission Workstream 1st September 2005
Publication of UK Wholesale Gas Market Liquidity Data TR 1099/1100
Proposed Transitional Gas Exit Arrangements
Richard Fairholme E.ON UK
Consideration of issues raised by UNC Modification Proposal 0244
Entry Overrun Calculation
Options for the Development of a Demand Side Response Mechanism
Proposer: Debbie Brace Panel Date: 20th March 2014
Information Provision for Transitional Exit Capacity
Commercial Arrangements For Gas Quality Service – Introduction
Implementation Approach Distribution Workgroup – June 2014
Market Information Provision Initiative (MIPI) Phase 2
Modification 0043 – Limitation on offering for sale unsold capacity
Transmission Workstream 05 November 2009
Gas Customer Forum 28 July 2008
Modification 0621 / GB Charging Project DSC Change Management Committee update June 2018.
Presentation transcript:

Richard Fairholme Transmission Workstream 4th September 2008 Modification Proposal 0219 – “Publication of UK Wholesale Gas Market Liquidity Data” – UPDATE Richard Fairholme Transmission Workstream 4th September 2008

Update At the last Transmission Workstream, the proposal received initial support from many industry participants (including Ofgem). Subject to discussions here today, it is still our intention to present this Modification Proposal to the September Mod Panel. Therefore, looking to iron out any issues to ensure it is developed as fully as possible before it is submitted formally. All views welcome. Please overwrite text

Specific Issues for Discussion & Development Publication Timing Historical Data Defining “Total Daily Physical” Interaction with the ‘MIPI project’ Additional Data Items NCORM or UNC Modification Proposal? Please overwrite text

1. Publication Timing 2. Historical Data Currently D+1. Suggested move to D+2, however… Entry closes out at D+5. Any other timing issues to be considered? 2. Historical Data Mod currently specifies publication of 10 years of data. 2 years of data more realistic?

3. Definition of “Total Daily Physical” Current definition is based on National Grid’s Ops Forum report where term is used and is taken to mean: “Amount Physically Delivered to the NTS from the NBP trades. i.e. from the Total Gas Traded on the NBP, the amount that actually ended up as a Physical Supply flow to the NTS.” Is this a reasonable definition for the Mod? Any alternative suggestions?

4. Interaction with the ‘MIPI Project’ National Grid Workshop on 17th September 2008. However… If integrated into the ‘MIPI Project’, seems unlikely to deliver this information until end of 2009. This would be too late. A key reason for raising this Mod is to address current misinformation about the level of liquidity in the wholesale gas market. Not a suitable route if it involves new Code obligations?

5. Additional Data Items Further to suggestions from other Users, we propose to also include: The number of parties trading on the day The number of trades on the day Views sought on the value of this information. Any other information that would be of use?

6. NCORM Change or UNC Modification Proposal? UNC Modification Governance Only seems appropriate if presenting existing data in a different way. Necessary if changes to timing of publication of data and/or new data items. Little opportunity for industry participation. Formal industry consultation & variation / alternative Mod options. Requires UNC Committee approval. Mod Panel recommendation & Ofgem decision. No implementation obligation? Implementation obligations in Code (if approved).

Theme Date Department