RPC Renovation and Addition
Moving the Office Temporarily to the Music Room
Saving the Brick
The Deck and Concrete Pad Removed Digging the Footers
Stripping the Old Fellowship Hall
Removed the Wall between the Kitchen and the Library
Why the Floors Squeaked Upstairs (note the nails didn’t make it into the floor joists; subfloor now screwed to the joists)
Laying Block for the Expansion
Mortar Mixer
Struggling to Match the Brick
Discussing Waterproofing Window in Elementary Room
The Nursery
Louie’s Former Office (new door location for Food Pantry)
Secretary’s Former Office (new expanded Kid Care Room)
Old Copy Room (New Downstairs Entrance)
Removing the Tile Floors
Youth Room Getting New Windows
Laying Block Between Rain Storms
Stairwell off New Fellowship Hall
Someone Let Bert Out of His Cage