NASA AMES Research Center Utility Energy Services Contract & Project Funding Sources August 23, 20121.

Slides:



Advertisements
Similar presentations
Energy Audit Process For Data Centers Len Kientz
Advertisements

Maximizing ARRA Impacts With ESPC Tennessee Green Building Summit Nashville, TN September 22,
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
U.S. Russia Energy Efficiency Workshop November 17, 2010 Public Sector Energy Efficiency Financing Presenter – Amy Chiang, VP Global Energy Government.
Energy Performance Contracts Chip Barnes. What is an EPC? Popular way to obtain infrastructure energy efficiency & operational improvements with: Popular.
State of Illinois Energy Office Programs Illinois Energy Now Construction Workshops 2011.
Energy, Water Consumption & Carbon Emissions June 2010.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District July 21, 2008 BUILDING TOMORROW TODAY 1.
Facilities: A Sampling of Sustainability Efforts Guaranteed Energy Savings Agreement (GESA) Geothermal LEED Building Construction Natural Gas Vehicles.
Federal Reserve Bank of Boston Case Study
1 1 BASICS OF ENERGY MANAGEMENT Section A - Energy Basics.
Improve Facility Operation through Commissioning-A Case Study Mingsheng Liu, Ph.D., P. E. University of Nebraska.
Company Introduction…….
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
New Paradigms for Measuring Savings
1 Partner with the Con Edison Commercial and Industrial Energy Efficiency Program.
The value in mechanical & electrical retrofits What Pays and what Doesnt? What Pays and what Doesnt? June 16, 2011 June 16, 2011 Mark Kesseler Mark Kesseler.
Eglin Air Force Base & Gulf Power
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1.
Program Overview February 25, Program Summary Approximately $14M in incentives per year Cap for Large Customers: $300,000 per year Prescriptive.
NCAT- Butte 3040 Continental Drive P.O. Box 3838 Butte, MT Pursuing Energy Conservation Opportunities in YOUR School.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Energy Saving in Hospitals: Hong Kong Initiatives
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Jim Pauley, P.E. Vice President, Industry and Government Relations – Schneider Electric Chair, NEMA High Performance Building Council Building Star An.
NJ SmartStart Buildings New Jersey Higher Education Partnership for Sustainability (HEPS) January 20, 2012 Presenter: BPU President Robert Hanna.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
UTPA Energy Conservation Initiatives Oscar Villarreal Director, Facilities Management David Ortega Assistant Director, Energy Manager.
Branford Board of Education Conservation Report Efforts and Results 2001-Present Mark Deming Facilities Director Branford Board of Education November 19,
Worcester Polytechnic Institute Gordon Library and Fuller Laboratory B.N. Tripathi Senior Vice President CES/Way.
ENERGY MANAGEMENT & EFFICIENCY JOSÉ D. NUÑEZ, LEED AP VICE CHANCELLOR FACILITIES PLANNING, MAINTENANCE & OPERATIONS "Facilities Excellence" 1 “This Way.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Franklin County Technical School Performance Contract Project.
ORNL ESPC Overview GovEnergy ESPC Project Summary  $89M project funded by $8.2M in guaranteed annual savings  Energy Conservation Measures: 1.Select.
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Utility Rebates Services and Funding to Help Build “Green” Restaurants and Hospitality Facilities Tom Coughlin Program Manager.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
GREATER LAWRENCE SANITARY DISTRICT ENERGY EFFICIENCY PROGRAM.
Massachusetts High-Performance Green Schools – Case Study Whitman-Hanson Regional High School Library & Media Center. This projects features include utilizing.
Contract Mechanisms and Project Structures to Implement Energy/Water Projects February 24, 2010.
Cheri Cousens, P.E. – Executive Director September 15, 2010.
PASBO Building Considerations for Vo-Tech Education March 17, 2011 Pat Adams Dave Kramer Collin Sandifer.
UESC Case Studies – PG&E
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Phoenix Convention Center Phoenix, Arizona Evolution of Energy Services Integrated Energy TrackIntegration of the Energy Industry Nicole Bulgarino Ameresco.
MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster David Jump, Ph.D., P.E., Matt Denny, P.E. Quantum Energy Services & Technologies,
Best Practices in Overall Sustainable Design Cal State University, Long Beach - Liberal Arts 2, 3 and 4 Renovation Presented By:Mark Zakhour,, CASp, LEED.
Name of Building(s) or Project Speaker(s) Organization(s)
Facility Improvement Program Town of Shirley June 17, 2013 Robert Reddish ABM Building Solutions.
International Newspaper Group 2008 Gannett’s Green Campaign.
Vanderbilt Energy: 15,000 20,000 25,000 30,000 35,000 40,000 45,000 18,708,842 Kilowatt Hours.
Retrocommissioning Program UBS 677 Washington Blvd, Stamford, CT.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Slide 1 Fort Detrick Sustainability Planning Workshop #1 – Out Brief 1 Jul 08.
A collection of short stories Energy Savings Performance Contracting.
1 May 10, 2011 Procurement and Financing Options for Facility Improvements Siemens Industry, Inc. Building Technologies.
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
Town of Woodbridge Beecher Road School Infrastructure & Energy Upgrade Presentation to Board of Education December 17 th, 2012 AKF John B. Rice, PE, LEED.
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
1 Town of Dedham Energy Saving Performance Contracting.
DRAFT Status Report: Five-Year Energy Plan Town of Athol January 2013.
Harness the Power of your Operating Budget to Enhance your Learning Environment MASBO Winer Conference – Jackson, MS.
January 12, 2017.
Sustainability Best Practices
Dynamic Chiller Optimization The Next Level of Retro-Commissioning
Presentation transcript:

NASA AMES Research Center Utility Energy Services Contract & Project Funding Sources August 23, 20121

PRESENTATION AGENDA NASA Overview UESC Project Background Facility Challenges / Issues UESC Project Goals Project Overview Questions August 23, 20122

NASA AMES OVERVIEW NASA AMES OVERVIEW Located at Moffett Field, CA in the heart of Silicon Valley One of ten (10) NASA field installations with a primary focus on providing critical R&D on enabling technologies for NASA missions Approximately 271 structures totaling over 2.6M ft 2 Total annual utility spend of $15.5M Aging mechanical and electrical infrastructure Three large and inefficient central steam systems Over sixty chilled water plants Extensive and problematic pneumatic control systems (minimal DDC) August 23, 20123

UESC PROJECT BACKGROUND UESC PROJECT BACKGROUND Previously implemented two small ESPC projects (1999 & 2000) – primarily indoor / outdoor lighting upgrades Significantly behind federal goals / mandates Seeking a mechanism to implement a comprehensive & bundled project Engaged Pacific Gas & Electric (PG&E) in 2010 to discuss the viability of using their UESC program PG&E/NASA selected AECOM as UESC ESCO partner August 23, 20124

FACILITY CHALLENGES / ISSUES FACILITY CHALLENGES / ISSUES Low electric and natural gas rates ($0.045/kWh, $0.70/therm) Significantly behind federal and NASA energy mandates and goals (224,890 BTU/GSF vs. goal of 157,423 BTU/GSF) Much of the low hanging fruit was included in two prior ESPC projects – eliminated leverage for future projects Aging and inefficient steam systems causing significant operational issues impacting mission August 23, 20125

FACILITY CHALLENGES / ISSUES FACILITY CHALLENGES / ISSUES Many of the facilitys boilers were not in compliance with local air quality district NOx standards (pending fines) Lacked adequate funding to address boiler NOx compliance issue within required time frame Funding shortfall for installation of photovoltaic system at new state of the art headquarters building (required for LEED Platinum certification) August 23, 20126

UESC PROJECT GOALS Bundled / integrated project meeting federal mandates while also addressing critical facility infrastructure needs Install roof-mounted photovoltaic systems in the new Collaborative Support Facility (Building N232) attain LEED Platinum certification. Replace aging and inefficient boilers not meeting Bay Area Air Quality Management District standards (approximately 31 boilers) August 23, 20127

UESC PROJECT GOALS Replace centralized steam systems with high efficiency hot water boilers Replace / upgrade existing pneumatic controls with DDC and integrate to base-wide EMCS Capture utility incentives, rebates, and appropriated funds to maximize scope of work August 23, 20128

PROJECT OUTCOMES Project affected 131 buildings totaling 2.6M ft 2 Total construction cost $22M Total financed cost $20.2M over a thirteen (13) year term Project buy-down included $1.2M of appropriated funds, $420k utility incentives, $300k water incentives (verified by utility) Additional $600k in retro-commissioning incentives being used to implement additional scopes of work Annual energy savings: 9,095,382 kWh (9.1% of non- industrial consumption), 957 kW of peak demand, and 1,291,757 therms (33.3% of estimated boiler consumption) Annual cost savings: $1,648,331 (energy and O&M) Construction will be complete in October 2012 August 23, 20129

PROJECT MEASURES ECM 1 – Base-Wide Inlet Guide Vane (IGV) to Variable Frequency Drive (VFD) Retrofits ECM 2 – Upgrade Indoor Lighting ECM 3 – Upgrade Outdoor Lighting ECM 4, 5 – Base-Wide Hydronic Boiler Replacements ECM 6 – Steam Decentralization ECM 7 – Base-Wide Retro Commissioning and FMCS Upgrades ECM 8 – Bldg. 239 VAV & Central Chilled Water Plant Upgrades ECM 9 – Bldg. N258 Air System Optimization ECM 10 – Bldg. N233 Multiple Measures – chiller replacement and plant optimization, boiler plant upgrades, EMCS expansion. ECM 11 – Bldg. N233A Multiple Measures – boiler plant upgrades, variable volume pumping, EMCS expansion ECM 12 – Bldg. N232 Photovoltaic System ECM 13 – Bldg. 245 Chiller Replacement ECM 14 – Base-Wide Domestic Water Retrofit June 25,

QUESTIONS AND ANSWERS Our projects leave the world a better place. August 23,