Proposed Changes to UNC Section O

Slides:



Advertisements
Similar presentations
Non-code User Pays. 2 What we will cover Background Current Services Governance Arrangements What is working well What is not working as well.
Advertisements

Project Nexus Next Steps Xoserve/Large GT View – 6 December 2011.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Information Transparency Proposal Transmission Workstream 2 nd November 2006 Presentation by Abid Sheikh, energywatch and Angela Love, Poyry Energy.
AQ Appeals and the BTU form Chris Warner. 2 AQ Appeals and the BTU form  Presentation reflects NGD’s view of UNC regime as drafted and is intended to.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
UNC Modification Proposal Daily Metered Elective Action 005: User Pays Proposal Simon Trivella – 4 th November 2008 Development Work Group 0224.
Draft Review Proposal 175 Encouraging Participation in the elective DM Regime Phil Broom 25 October 2007.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
UNC Modification 0050 – Storage Monitor Adjustment.
Industry Dialogue on xoserve Services 14 th September 2007.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
Customer Charge On behalf of all DNs 19 November 2010.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
Supply Point Enquiry Service
UNC Modification Proposal 0202 National Grid Distribution
Modification Proposal 0283 Update
Review of System Alerts
Transmission Planning Code – Draft Document
Review Group 291- Ofgem Update
Review of UNC Section Q “Emergencies”
Transmission Planning Code
Introduction of Code Contingency Guidelines Document
SO Incentives from April 2010
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
UNC Trader User – Licence obligations
Amendment to NEA & NExA Measurement Provisions Change Process
Project Nexus Workgroup
Connected System Exit Points Administration Options
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Connected System Exit Points Administration Options
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Joint Office Presentation for Modification 0678
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Transmission Planning Code Review
UNC Section H Clarification
Introduction of Code Contingency Guidelines Document
Review Group 291- Ofgem Update
AUG Query Responses 21st November 2013.
Proposed Transitional Gas Exit Arrangements
UNC Transmission Workstream 15th June 2005
PN UNC Workgroup (Settlement topic)
Options for the Development of a Demand Side Response Mechanism
Reinstatement of NTS Interruption
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Open Letter - Summary of Responses
Gemini Code Contingency Review
Modification 0043 – Limitation on offering for sale unsold capacity
Transmission Workstream, 1 Mar 07
Modification Proposal 136
Project Nexus Workgroup
Joint Office UNC Elections
Joint Office UNC Elections
Gas Customer Forum 28 July 2008
Joint Office UNC Elections
Capacity Access Review
Presentation transcript:

Proposed Changes to UNC Section O Peter Mills-Baker Commercial Frameworks

Contents History of Previous Modification Proposal (0557) Industry Consultation New Proposal Benefits of Proposal

Modification Proposal (0557) History Modification Proposal 0557 “Revision to Section O – System Planning” was raised in 2002. This proposed; Transco would no longer be required to publish the Base Plan Assumptions document. The requirement for Users to provide estimates of gas supply availability would continue, the requirement for them to provide estimates of demand would not be retained. Proposal 0557 was rejected by Ofgem due primarily to concerns about the requirement on Transco to publish the BPA information; “Ofgem does not consider that either the proposal or the revised drafting reflects the need to ensure that the detailed assumptions continue to be published, if only within the TYS.”

Industry Consultation The Base Plan Assumptions (BPA) document was last published by Transco in 1999 for 2000 The Transporting Britain's Energy (TBE) consultation process initiates Transco’s annual planning process and culminates in the publication of the Ten Year Statement The information previously contained in the BPA can now be found in the Ten Year Statement (10YS) The consultation process includes the circulation of targeted questionnaires for Shippers, Producers, Consumers, Terminal Operators, Storage Operators, Gas Importers and Transporters. The Shipper questionnaire covers the requirements of UNC Section O Chapter 3

New Proposal “Revision to Section O – Removal of Base Plan Assumption” References to Base Plan Assumptions to be removed or replaced by Transporting Britain’s Energy (TBE) where appropriate Move references in the Base Plan Assumptions section to the Ten Year Statement section Retain all current requirements for Users to provide estimates of demand and to publish this information

Benefits of Proposal This Proposal seeks to align the UNC with the current TBE process and will improve the efficient operation of the planning process by; Removing the obligation to publish duplicate information Streamlining the gathering of data for planning purposes The process of gathering and publishing planning information will be better coordinated This proposal will not have any systems impact Addresses Ofgem’s concerns regarding Modification Proposal 0557 by maintaining the current requirements for information provision