Tanana River School Districts- Converting Wood into Educational Dollars and Economic Development July 29, 2013 Presenters: Daisy Huang, Research Engineer.

Slides:



Advertisements
Similar presentations
Chuck Kutscher National Renewable Energy Laboratory
Advertisements

Green Impacts of Public Transportation on our Communities Help Florida Turn the Corner with Transit.
Who Wants To Be A Millionaire? Sustainab ility Question 1.
Solar Energy. The Earth receives energy at a rate of 1365 W/m 2 ( R 2 )=174,000 TerraWatts R=6.37x10 6 m (Area =1.3x10 14 m 2 )
Operations Management Maintenance and Reliability Chapter 17
Energy in the U.S. - Why Wind? Financing Wind Power: The Future of Energy Institute for Professional and Executive Development Santa Fe, N.M. July 25,
Renewable Energy and Energy Efficiency Program: Farm Bill Section 9006 Section 9006 Program : Rural Energy Efficiency Renewable Energy Projects May 9,
Energy in the U.S. - Why Wind? Financing Wind Power: The Future of Energy Institute for Professional and Executive Development Scottsdale, Arizona May.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
An overview of the National Performance Measures 118 NOVEMBER 2011 THE CORPORATION FOR NATIONAL & COMMUNITY SERVICE.
16 th April 2008 Energy Outlook View of an International Oil Company Thierry PFLIMLIN President & CEO Total Oil Asia-Pacific Pte Ltd 2 nd ARF Seminar on.
Karlovac County Situated in the central part of Croatian state territory Covers an area of approximately km 2 Population people, density.
Wood to Warmth – Case Studies Alison Wilshaw, TV Energy 16 February,
Woodfuel: The Community Choice Wood Heat Solutions New Forest Keith Richards 10 th March 2011
Regional responses to the Europe 2020 Strategy with particular focus on energy efficiency – Hungarian case.
Regional Policy Changes in Common Indicators Definitions and Discussion Brussels, 14 th March
Information - CommunicationDirectorate general for Energy and Transport European Commission ECCP II Stakeholders` Meeting 24 October 2005 Luc Werring Principal.
Technology, Energy Efficiency & Renewable Energy for Emission Reduction John Morrison and Ward Lenz Advanced Energy April 20, 2004.
Welcome to Who Wants to be a Millionaire
Who Wants To Be A Millionaire?
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
World energy economy at a glance Uri Barenholz Weizmann institute of science December, 2011.
Building a Better Future Stretch Building Code October 15, 2009.
Biomass Furnaces for Heating Poultry Houses November 2008 By Jim Wimberly BioEnergy Systems LLC Fayetteville, AR.
DIASPORA HOMES (K) Ltd Providing housing space to eradicate slums By ERNEST KAMAU Tel /5 Nairobi, Kenya.
Thailand’s Energy Conservation Policy : Industry Programs
1 Building Use Study Plattsburgh City School District Advisory Committee Meeting September 18, 2013 Castallo and Silky- Education Consultants Bill Silky.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
An Impact Analysis of Electrifying Florida’s Public Buses
* A chiller capable of producing water temperatures of low 40s on the evaporator side and above 135° on the condenser side.
Legal Framework for Bioenergy in Germany Sebastian Kilburg THE FUTURE OF BIOFUELS IN LITHUANIA: ISSUES AND OPPORTUNITIES Vilnius, November 8 th 2007.
EDISON INTERNATIONAL® SM October 2012 Project Management Technical Services Customer Generation Team SCAP Energy Management Committee Meeting October 23,
1 Equity in School Lunch Pricing (Section 205) Howard Leikert Supervisor School Nutrition Programs March 22, 2011.
ANTHC DIVISION OF ENVIRONMENTAL HEALTH & ENGINEERING Wagner ANTHC Rural Energy – Washeterias Briefing for the Arctic Research Commission January 2014 Daniel.
Who We Are Alaska Native Tribal Health Consortium Division of Environmental Health & Engineering June 2011.
Buckeye Wood Energy Converting Waste Wood Into Energy.
Montpelier District Energy Gwendolyn Hallsmith, Director Planning and Community Development City of Montpelier, Vermont.
Wood Biomass Basics Woody biomass: Thermal and combined heat and power (CHP) technology, applications & opportunities. Rick DeMark, Coordinator North Country.
Biomass Development A State Perspective Arthur Butch Blazer New Mexico State Forester.
Workshop: Opportunities for Wood Heat from Forest Residues in Alaskan Communities Alaska Wood Energy Conference November 16 Fairbanks, Alaska Tom Miles.
Geoexchange at CMU Regional public higher education institution 3 campuses in Grand Junction, CO. Main campus 78 acres and 1.5 million s.f. under.
NET ZERO STUDY ON A COMMUNITY COLLEGE By: Amanda OConnell Doenges.
1 © GDC Group Heat Solutions. Source; House Hold budget survey (2004/2005) Irish Heating Market.
Producing energy does not have to threaten the environment. In fact, its very production can reap major environmental benefits. The United States biomass.
Ultra-Low Freezer Rebate Program Report Fiscal Year
Sprayer Economics Gary Schnitkey University of Illinois.
CHAPTER 1: UNDERSTANDING THE FINANCIAL PLANNING PROCESS.
© Vattenfall AB The Swedish Power Market Presented for Invest in Sweden Agency and Sun Microsystems Stockholm 20 March, 2009 Sandra Grauers Nilsson, Vattenfall.
First Solar FuelSmart™: Powering Energy Security
City of Miami PROPOSED Fiscal Year 2009 BUDGET. 2 Budget Focus To prepare a structurally balanced general operating budget. To provide a budget, which.
1 Town of Colchester FY 12 Budget. 2 Current Financial Challenges Vermont and the nation are coming out of a recession Expenses rarely go down.
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
District Advisory Council (DAC) 1 October 22, 2012 Westlawn Elementary School.
Example of a Decision Tree Problem: The Payoff Table
Strategy Review Meeting Strategy Review Meeting
Aspen Power, LLC Danny Vines, President October 7, 2010.
Equal or Not. Equal or Not
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Fundamentals of Cost Analysis for Decision Making
Alaskan Renewable Schools- Burning Wood into Educational Dollars! Art Nash, Energy Specialist 2013 Arctic Energy Summit October 10, 2013.
University of Alaska Fairbanks An Energy Solution for 2017 and beyond.
Suitability of Woody Biomass Heating in Remote Alaskan Environments Cory Luker Biomass Energy Research Technician Summer 2014 | Fairbanks, Alaska.
From Menace to Meals. How Legislative support has turned Fire into Food.
Wind Energy in Iowa Lori McDaniel
Eric Hanssen, P.E., LEED AP, CEM ANTHC Rural Energy Initiative
Suitability of Woody Biomass Heating in Remote Alaskan Environments
Presentation transcript:

Tanana River School Districts- Converting Wood into Educational Dollars and Economic Development July 29, 2013 Presenters: Daisy Huang, Research Engineer Alaska Center for Energy and Power University of Alaska Fairbanks Art Nash, Energy Specialist Cooperative Extension Service University of Alaska Fairbanks 1

Why woody biomass? Alaskan context Why biomass is a solution Three examples of woody biomass usage in Interior Alaska Tok Delta Junction Tanana Outline 2

Alaska has a rural population of 200,000. Communities range in population from ~10s to ~1000s. Most of them run isolated diesel-fired generator sets. Most are not on the road system and are accessible by air or boat only. The median household income in rural Alaska is $40,000. Highest heat loads in the U.S., with temperatures regularly reaching -50 (F or C hardly matters at this point!). Both electricity and fuel oil costs are high and volatile. Electricity: $0.22/kWh in Fairbanks $ /kWh in rural Alaska Fuel oil: $4.00/gallon in Fairbanks $4.50-$12+/gallon in rural Alaska What is the problem? 3

80% of energy in Alaska is used for heating* Biomass is local, renewable, may be sustainably harvested. Why are we interested in biomass heating? 4 *WHPacifc Report: Alaska Energy Authority End Use Study: 2012, April 30, 2012

Biomass is often widely available: Land that is being cleared for development Forest that is being cleared for fire remediation River drift logs (unverifiable anecdotes indicate that 200,000 cords come down the Yukon each spring) Unusable waste product from lumber mills Wind and beetle kill Even when biomass is deliberately harvested, it may be done so sustainably. Why are we interested in biomass heating? 5

For example… A phenomenal wind event in September 2012 brought down 70-90% of the trees around Tanacross and Dry Creek (~15 road miles from Tok) Photo credits: Jeff Hermanns, AK DNR

Tok, population 1300, on the road system Example I: Tok 7

Tok has an arid climate and is surrounded by thick foresta recipe for fire disaster. In the past 25 years, 2 million acres in the area have burned, costing $60 million for fire suppression and causing 6 evacuations In 1990, a single fire burned over 100,000 acres (400 km 2 ); in 2004, the fire almost destroyed the school and other city buildings. Over 1000 firefighters could not stop the fire in Example I: Tok 8 Bitter Creek fire currently burning east of Tok: Photo by Gordon Amundson Photo by AK DOF

Wood is cut and deliberately burned for fire remediation (3,000 acres is the target); wood is low quality (small trees) and cant be used for lumber. In 2010, a 5.5 million Btu chip-fired Messersmith biomass boiler system was installed in the 88,000 square foot Tok High School. In 2011, a steam turbine was added that currently produces 60 kW, matching the average load of the school (it still needs grid power during peak times) and covering 75% of electricity needs. Excess heat is still available; a greenhouse is being built to provide vegetables to school lunches, and a district heating system to neighboring city buildings is under assessment. Example I: Tok 9 Photo courtesy of Alaska Department of Natural Resources

Example I: Tok 10 Annual heating and fire remediation costs before installation of the biomass boiler: 53,000 gallons of oil at $5.50/gallon $300,000 total DOF spent $1000/acre for tree removal. Annual heating costs after installation of the biomass boiler: 300 tons of chips at low variable costs. 75% of electrical power usage also displaced. Funding sources: $3.2 million grant from Alaska Energy Authority $750,000 from the State of Alaska This savings to the school has enabled the recovery of Toks preschool program, as well as the rehire of three staff members for the schoola music teacher, counselor, and boiler operator

Delta Junction, population 1000, on the road system, 110 road miles from Tok Example II: Delta Junction 11

Delta Junction leveraged the expertise developed in Tok and installed the same 5.5 million Btu chip-fired Messersmith biomass boiler system in its Delta High School, a 77,000 square-foot building, which serves 200 students. Chips are purchased from Dry Creek Lumber, which rents Toks chipper to make chips out of scrap wood. Example II: Delta Junction 12

Annual heating costs before installation of the biomass boiler: 102,000 gallons of fuel oil at $4/gallon Cost: $408,000 Annual heating costs after installation of the biomass boiler: 500 tons of chips at $60/ton 25,500 gallons of fuel oil at $4/gallon Cost: $132,000 Efficiency increases annually as local skill increases; 1 st year, 50% of oil was displaced, 2 nd year, 75% of oil was displaced. Funding sources: $2 million grant from Alaska Energy Authority $800,000 from the State of Alaska Example II: Delta Junction 13

Tanana, population 300, not on the road system, 180 air miles from Fairbanks Example III: Tanana 14 Tanana City Hall (source: Nicholas School of the Environment, Duke University)

In November 2007, the City Manager, Bear Ketzler, kicked off Tananas now burgeoning biomass program with the installation of two 425,000 Btu/hour cordwood-fired Garn boilers in its city washeteria. The cost of installation of that first project, which included a new boiler building, was under $100,000. It has displaced annually about 6000 gallons of diesel with 50 cords of wood. The first project has reduced oil consumption in the washeteria by about 50%. Example III: Tanana 15 Photos courtesy of State of AK Division of Community & Regional Affairs

More biomass! 2 Garn boilers installed to heat the city office. 2 Garn boilers installed in the senior center. 4 Econoburn boilers to heat the city shop and the teachers housing. 3 more Garns are slated to be installed into various city buildings within the next year. Ketzlers goals were: To reduce reliance on diesel fuel (which costs about $6.50 per gallon in Tanana To create a healthy local economy around biomass. In order to achieve this, he set the price of wood at $250 per cord (which has since been raised to $300 per cord), and informed the locals that the city would purchase wood from anyone who cared to harvest it, either by pulling driftwood from the river, or by harvesting it on legal lands. Example III: Tanana 16

Example III: Tanana

Annual heating costs before installation of the biomass boiler: 12,000 gallons of fuel oil at $4.50/gallon Cost: $54,000 Annual heating costs after installation of the biomass boiler: 40 cords of wood at $250/cord: $10,000 6,000 gallons of fuel oil at $4.50/gallon: $27,000 Cost: $37,000 This savings has enabled: Building a new childrens playground. Improvement and weatherization of the school and teacher housing; weatherization of the school has resulted in saving 7000 gallons of oil annually; it is next to be retrofitted with wood heat. Money used to purchase firewood is now being circulated in the community rather than being sent Outside by oil purchase. Full-time maintenance person now employed by the City. Example III: Tanana Washeteria 18

Tanana project area woody biomass cost per ton The regions in the left column are economically feasible at oil cost of greater than $4/gallon.

20 Thank you! Daisy Huang, Art Nash,

Background of AEA biomass program 21 Alaska Wood Energy Development Task Group (AWEDTG) a coalition of federal and state agencies and not-for-profit organizations… to explore opportunities to increase the utilization of wood for energy and biofuels production in Alaska. (AEA website) In , and 2012, over 60 communities have applied for grants for community heating projects.

Interview communities/applicants regarding their status and progress of AEAs pre-feasibility biomass program. Document the current status of and collect available fiscal, operational, and mechanical data from those 50+ communities who received a pre-feasibility study. Interview key community members to get an idea of what it takes to make a biomass program succeed. ACEP biomass data collection program objectives 22

Schools or tribal halls to start; plan to extend to other community buildings, such as clinic, washeteria, etc. Former usage was diesel; diesel heater is left in place as backup. ~$5-7 per gallon ~10,000 – 50,000 gallons per year A typical community saves $80,000-$400,000 per year. Most buildings currently heated with wood-fired boilers are not using full capacity; there is excess heat; district heating loops may be installed. Typical situations 23

Background: How do these things work? GARN system: 24 Source: Load up and fire away!

Background: How do these things work? Messersmith: 25 It loads itself!