Karelian regional institute of management, economics and law of PetrSU May, 2012.

Slides:



Advertisements
Similar presentations
Recycling Waste Heat – CHP as an alternative
Advertisements

EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Fill in missing numbers or operations
Worksheets.
RWTÜV Fahrzeug Gmbh, Institute for Vehicle TechnologyTÜV Mitte Group 1 GRB Working Group Acceleration Pattern Results of pass-by noise measurements carried.
Presented by The Coal Rush Revisited: R. W. Beck, Inc. IPED COAL POWER CONFERENCE January 18-19, 2007 St. Petersburg, FL Nicholas P. Guarriello An Economic.
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Disability status in Ethiopia in 1984, 1994 & 2007 population and housing sensus Ehete Bekele Seyoum ESA/STAT/AC.219/25.
1 When you see… Find the zeros You think…. 2 To find the zeros...
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
- GDP 2011 versus 2010 – increase by 5.5%
Regional Policy Changes in Common Indicators Definitions and Discussion Brussels, 14 th March
Regional Policy Common Indicators: Energy & Climate Change Definitions and Discussion Brussels, 22 nd November
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
The 5S numbers game..
Wilhelms and Tanner-Faarinen Energy year 2012 District Heat.
The basics for simulations
MM4A6c: Apply the law of sines and the law of cosines.
A Path breaking Technology for Network Maintenance and Optimization
Climate Change Finance Facility (CCFF) Call for proposals: "Use of Renewable Energy Resources in the Household Sector (1st round) ( from 28 January - 24.
«MALAYA SOSNOVKA» INDUSTRIAL INNOVATIONS PARK. Information On The Ground Area in Malaya Sosnovka Industrial Innovations Park There is no encumbrances.
© OECD/IEA 2010 Data Compilation Issues for Electricity and Heat Energy Statistics Workshop Beijing, China, Sept Pierre Boileau International Energy.
CENSUS DATA 1.POPULATION Total population5.437 million9.856 million Female percentage Intercensal growth percentage Growth.
Houston Region Import Capacity Project Planning for Reliable Power.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Capacity to Customer (C 2 C) Update ENA 2012 Low Carbon Network Fund Conference 26 October 2012.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
© Vattenfall AB The Swedish Power Market Presented for Invest in Sweden Agency and Sun Microsystems Stockholm 20 March, 2009 Sandra Grauers Nilsson, Vattenfall.
Recognizing Success Energy Use & Greenhouse Gas Emissions in Canadian Homes 1990 – 2010 Canadian Renovators’ Council, October 2012.
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
ERGON ENERGY - Warwick to Stanthorpe 110 kV sub-transmission line proposal Prepared for the Community Reference Group STANTHORPE PRESENTED on 11 TH April.
Adding Up In Chunks.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
BI Marketing Analyst input into report marketing Report TitleElectricity in Swaziland Report Subtitle Country profile of power sector, market trends and.
BI Marketing Analyst input into report marketing Report TitleElectricity in Mauritius Report Subtitle Country profile of power sector, market trends and.
GOVERNMENT OF KHANTY-MANSIYSK AUTONOMOUS OKRUG - YUGRA Creation of a pilot cluster for the effective APG and the low-pressure gas usage in the Khanty-Mansiysk.
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Regional Energy Markets Assistance Program Kazakhstan November 8-11, 2010.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Existing Electricity Universal Service in China Yang Kun, Chief Engineer State Electricity Regulatory Commission of China (SERC) Quebec City, May 15, 2012.
Awareness inquiry. Do you know what renewable energy is? Yes No All students know about renewable energy because it is in some subjects like texnology,
Best praxis project for smart city Comprehensive heat meters data remote reading in the city district heating (DH) system.
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
Subtraction: Adding UP
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
Power Generation In Singapore Presented By CHAN Y K Commercial Specialist Commercial Service, Singapore.
Efficient and Sustainable Use of Biomass for Energy
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Energy saving and energy efficiency programs of grid organizations of the Russian Federation Maxim Egorov Director of the Department for regulation in.
This project is co-funded by the European Union, the Russian Federation and the Republic of Finland Activity 4. Utilities network analysis (KRIMEL, KAEEC,
Berlin, 8-12 May 2006 Gefördert durch die Europäische Union Promoted by the European Union Technological Educational Institute of Crete THE EXPERIENCE.
JSC “Moscow United Electric Grid Company” (JSC “MOESK”) Operating activity’s results for the first half year of 2010.
Unrestricted © Siemens AG 2015 All rights reserved.Answers for infrastructure and cities. Data collection for city baseline and projections for Helsinki.
Electrical Equipment Park in in Russian Federation Russian Federation on the basis of Korean technology Project’s conception presentation Moscow Region.
Electricity Generating Authority of Thailand (EGAT) 1 STRUCTURE, STATUS AND CROSS BORDER POWER INTERCONNECTION 0F THAILAND b y Mr. Prutichai Chonglertvanichkul.
ENERGY AGENCY LITHUANIA Perspective for the EU Structural Assistance to the Energy Projects in Lithuania for the period Marijus Franckevičius.
ACCESS TO THE GRID Vaida Tamašauskaitė Power System Planning Division Power System Development Department Lietuvos energija AB Ryga, 3 July, 2006.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
Presentation transcript:

Karelian regional institute of management, economics and law of PetrSU May, 2012

KRIMEL participation in Activity 4 Activity 4 - Utilities network analysis. Scope of work was distributed between KRIMEL and KAEEC. KRIMEL : Description of energy network (power and heating lines); Description of road network status.

Activity 4 fulfillment March 2012 – 1. Coordinating meetings between KRIMEL and KAEEC, 2. Forming of an expert group with an expert on heating and power lines being recruited, 3. Development by experts of a questionnaire form for heating lines analysis.

Activity 4 fulfillment April Distribution and collection of questionnaire forms on heating lines within pilot territories, 2. Interviewing by telephone of contact and responsible persons in the pilot territories, 3. Meeting the chief engineer of Southern Karelian electric power lines company. 4. Making inquiry for the road network of the pilot regions, 5. Making inquiry from Kostomuksha Prionegye grid company for power lines analysis.

Activity 4 fulfillment May Analysis of the data received on heating lines, 2. Analysis of the data received on electric lines in Kalevala region, 3. Gathering information on road network, 4. Gathering information on electric lines in Kostomucksha.

Research preliminary results Heating lines – Kalevala region Population – appr Main settlements: Kalevala settlement, Borovoi settlement, Yushkozero settlement, Luusalmi settlement. 856 apartment houses, 822 private houses. Centralized heating supply for 25% of the residential area (32% of population). Electric heating on 3% of residential area. Wood heating on 72% of residential area. Type of fuel used: firewood (12 thousand solid m3/year).

Research preliminary results Heating lines – Kalevala region, Kalevala settlement Main heating consumer – Kalevala settlement: 5 boiler houses, Wearout of equipment – from 3% up to 75% (53% - average wearout). Total amount of boilers – 15. Total power output – 5,31 Gcal/hour. Total length of the heating lines – 7,8 km. Lines wearout – over 50%. No reserve for housing improvement.

Research preliminary results Heating lines – Kalevala region, Borovoi settlement Outdated boiler equipment, High energy loss, Big amounts of fuel (firewood) consumption, Firewood supply problem. Novoye Yushkozero settlement Firewood supply problem.

Heating supply system – Kalevala region Recommendations: For the region as a whole – to make usage perspective assessment of peat fuel pellets produced in the region, For Kalevela settlement – consider two boilers combination, additional boilers installation. For Borovoi settlement – boiler renovation is required. For N. Yushkozero settlement – firewood supply improvement is required.

Research preliminary results Heating lines – Kostomuksha Centralized heating supply – 99% of consumers. Type of fuel used – oil fuel. Central boiler: - Total amount of boilers – 7. - Power output – 490 Gcal/h. - Repair of one boiler is required. Total length of heating lines – 57 km. Years of heating lines installation – 1982.

Heating lines - Kostomuksha Recommendations: Growth of private sector construction requires decentralized heating supply solution, Consider module boilers on local fuel construction.

Research preliminary results Electric power lines – Kalevala region

Power transmission line 110 kV Total length of the line – 121 km. Years of construction – Power transmission line 10 kV Total length of the line – 71 km. Years of construction – Power transmission line – 0,4 kV Total length of the line – 116 km. Years of construction –

Research preliminary results Electric power lines – Kalevala region Transformer substations: Kalevala – 4 stations, 1983 – Borovoi – 4 stations, 1981 – Kepa – 2 stations, Other substations (low output): 28 substations, 1984 – Diesel generator in Voinitsa settlement: 100 kVt capacity, 2005.

Electric power lines Kalevala region Recommendations: To ensure electric power supply in Kalevala settlement, interconnection with Pyaozersky lines is required, Stable power supply in Voinitsa settlement is required.

Road network in the pilot region

Research preliminary results Road network – Kalevala region Total road length – 452 km. Poor development of the road network. Roads are mainly in republican ownership. Category of road: 4-5. Status of roads – unsatisfactory.

Research preliminary results Road network – Kalevala region During the last 5 years no money investments were made into the construction of new local importance roads or bridges, Total length of the repaired public local importance roads during the last 5 years – about 15 km. Main objective for improvement of gravel road Kalevala-Voinitsa-Kostomucksha by dust control method (within international project).

Preliminary research results Road network – Kalevala region Recommendations: Reconstruction of Kem – Lonka road. Reconstruction of Kepa –Yushkozero – Borovoi - Kostomucksha road.

Preliminary research results Road network – Kostomuksha The road network is underdeveloped. Status of roads – satisfactory. Main objectives: improvement of gravel road Kalevala – Voinitsa – Kostomucksha by dust control method. Reconstruction of the road Kochkoma – Ticksha – Ledmozero – Kostomucksha.

2012 Republican planned road works and investments Construction : Kochkoma - Tiksha - Ledmozero - Kostomuksha- state border road, km 44 - km 64. Major overhaul: Laying the water line at km "Kepa - Jushkozero - Borovoi road Installing a weight control platform on the road Kochkoma - Tiksha - Ledmozero - Kostomuksha-state border, at 210 km Repair : km 89 of the road-Voinitsa -Voknavolok-Kostomuksha.

Road network - Kostomuksha Recommendations: Repair of roads is required.

Thank you! Contacts: Anton Posudnevsky Sergey Koshelev Elizaveta Druzhinina