Retro-Commissioning: A Tool for Improving HVAC Systems and Energy Cost

Slides:



Advertisements
Similar presentations
Energy Audit Process For Data Centers Len Kientz
Advertisements

Text Chiller Plant Optimization that Reduces Energy Consumption 20-50%
A CASE STUDY in actual energy conservation
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Chapter 3. HVAC Delivery Systems
HVAC Basics Bin Yan HVAC – Heating, Ventilation, Air-conditioning.
DOE - Chiller System Optimization Opportunities With Gas Engine-Driven Cooling Systems.
Improve Facility Operation through Commissioning-A Case Study Mingsheng Liu, Ph.D., P. E. University of Nebraska.
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
VFDs Energy Savings A Case Study on Boilers National Grid Solutions & Opportunities Upstate New York Energy Efficiency Conference & Expo April 7, 2011.
Institute of Energy and Sustainable Development HVAC S YSTEMS E NERGY D EMAND VS. B UILDING E NERGY D EMAND I VAN K OROLIJA I NSTITUTE OF E NERGY AND S.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
Page 1 Peng Xu, Philip Haves, James Braun, MaryAnn Piette January 23, 2004 Sponsored by the California Energy Commission and the California Institute for.
Intro to Enersol What is Retro-commissioning? Define Benefits of Retro-commissioning Define Retro-commissioning Process Discuss Retro-commissioning Findings.
HEALTHCARE BUILDING AUTOMATION
Tom Johanson – DNV KEMA Senior Engineer Building Automation Systems.
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
TYPES OF MECHANICAL SYSTEMS
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
Smart Devices. Smart Buildings. Smart Business The Potential for DCx Technology Enabled HVAC Operation Scot Duncan, P.E.
Variable Frequency Drives VFD Basics
Using Benchmarking to Identify Energy Efficiency Opportunity in Cleanrooms; The Labs 21 Approach William Tschudi and Peter Rumsey June 29, 2004
Chilled Water Piping Systems (VPF Focus)
CLEANROOM ENERGY BENCHMARKING William Tschudi October 9, 2002 Acknowledgements: Pacific Gas and Electric Company, Rumsey Engineers
Engineer Presentation
Energy Saving DDC Control Strategies
Energy Management with the use of an Intelligent Building Management System.
Active beams versus VAV with Reheat Analysis of May 2013 ASHRAE Journal article Ken Loudermilk Vice President, Technology & Developement.
Deep retrofits: You get what you pay for Leslie Kramer, Stanford University and Jonathan Schoenfeld, kW Engineering June 17, 2014.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Chilled Water Systems Total Cost of Ownership
Static Pressure Control Loop The purpose of the static pressure control loop is to maintain an optimal static pressure in the ductwork. The control loop.
CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) November 2013.
Examples of Commissioning Cost Savings Commissioning for Sustained Building Performance September 29, 2011 Marriott Birmingham, AL.
Energy Conservation Western North Carolina Recycler’s Networking Council Black Mountain, North Carolina December 9, 2004 Keyes McGee, E.I. North Carolina.
Phoenix Convention Center Phoenix, Arizona HVAC Re-tuning at GSA and Army Reserve Facilities: A Low-Cost Path to Energy Efficiency and Cost Savings Integrated.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,
MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster David Jump, Ph.D., P.E., Matt Denny, P.E. Quantum Energy Services & Technologies,
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
10/18/20151 Unlocking the Secrets of HVAC Nash-Rocky Mount Public Schools.
Overview of Data Center Energy Use Bill Tschudi, LBNL
Fundamentals of Retro- Commissioning Tom Meyer CSME, GGP, CBCP, QCP, EBCP The ESCO Group.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
The Data Center Challenge
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
VRF Applications in PNW RTF RTUG Meeting October 26, 2011 Kevin Campbell Reid Hart, PE Technical Research Group.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Prepared For: Prepared By: 100 Montgomery Street, Suite 600 San Francisco, CA Market Street San Francisco, CA The Benefits of Retrocommissioning.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
AstraZeneca R&D Boston Waltham Energy Reduction Initiative 2016 Green Labs Symposium.
The Data Center Challenge
By: John D. Villani, P.E., LEED AP, QCxP, CEM, GBE
Story of No-Cost Energy Savings at Ohio Union
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Lecture Objectives: Answer questions related to HW 4
Munters DOAS, Chilled Beams and VRV
2018 Retro-Commissioning (RCx) Program
Calibrated Energy Models: One New Change
Presentation transcript:

Retro-Commissioning: A Tool for Improving HVAC Systems and Energy Cost Reduction Speaker: William McGuire, P.E. 1

AGENDA Retro-Commissioning of Existing Buildings Why Retro-Cx What is Retro-Cx ? How do you do it / what to look for Case Studies Take-Away

Why Retro-Cx Older bldgs. (Pre 1990) on average consume more energy Antiquated control systems that don’t work Energy saving control strategies missed in design Neglected maintenance wasting energy and/or causing IAQ problems System upgrades that miss the mark Building usage / floor plans changed

Why Retro-Cx Energy cost are only expected to rise Economic outlook may prevent new construction Employee / Community goodwill – “It’s the right thing to do” Owners learn more about their own facilities Benefits intended to be long lasting Simple payback typically less than two years

Why Retro-Cx Leased Buildings LEED EB / ENERGY STAR buildings may become a differentiator High energy costs translate into increased rent cost

Why Retro-Cx Source: US Government Energy Information Administration Energy intensity 10% less Consumption in Gross Energy by Year Constructed - 2003 45% less energy consumed New buildings 35% to 57% more efficient

Why Retro-Cx A study by Lawrence Berkeley National Laboratory (LBNL) - 2004 Retro-Cx results Whole-building electricity savings range from 5% to 15% Gas savings range from 1% to 23% Payback ranged from 0.2 to 2.1 years The bigger the building typically the better the payback period Small buildings have opportunity as well Source: A RetroCommissioning Guide for Building Owners - PECI

Why Retro-Cx Lawrence Berkeley National Laboratory (LBNL) – 2004 Value of Energy Savings $0.11 - $0.72/ft2 Value of Non Energy Savings $0.10 - $0.45/ft2 Non Energy: Equip Life, thermal comfort, IAQ, productivity, liability, etc.

Sensors not operating properly Why Retro-Cx 1996 PECI/EPA/DOE Study of 60 Commercial Buildings: 15% 33% 40% HVAC Problems Sensors not operating properly Missing Equipment

Why Retro-Cx Retro-Commissioning X-nth Examples Energy Savings $/sf Building Sq.Ft. Annual Savings Savings $/sf % Energy Savings Hospital 185,000 $100,000 $0.54 18% Healthcare 100,000 $135,000 $1.35 30% 190,000 $75,000 $0.39 13% 150,000 $80,000 $0.53 Office Bldg 54,000 $38,500 $0.71 40% ROI Building Annual Savings 5 year ROI Hospital in Orlando $200,000 2,000 % University Research Bldg $114,000 Aquarium 350 % Casino $75,000 400 % Hospital in Central Florida 450 %

Retro-commissioning is “GREENER” Green Moment If Retro-commissioning our existing buildings can save just 10% energy consumption Reduce oil imports by 50%. Almost meets Kyoto Protocol. Exploit our existing buildings, not the environment !

What is Retro-Commissioning?

DISCOM What is Retro-Cx RETRO-Commissioning is evaluating and performance testing an Existing building’s HVAC…. Design Installation Set-up / TAB Controls / Optimization Operation Maintenance DISCOM

What is Retro-Cx Reveals hidden deficiencies that could have been avoided by commissioning. Highlights O&M problems that could have been avoided through better training. Reveals hidden control system problems, lowering energy costs.

What is Retro-Cx Retro-Cx is NOT an energy study! Energy studies leave the Owner with proof of what they already suspect , something is wrong. It provides no answers as to what to do or were to start. Skip all the paperwork and go find the MONEY

What is Retro-Cx Retro-Commissioning Defined: It’s a Tune-up, not just an ECM list PROCESS: An experienced commissioning team investigates the existing systems operation looking for equipment and systems that are not operating “properly”. RESULT: The most common HVAC discovery is even though the space temperatures are comfortable, the systems are consuming much more energy than necessary due to over-cooling, over-heating, over-ventilating. Reveals hidden problems in DISCO&M. COST: Retro-commissioning’s cost is a few weeks of time for the commissioning team. The cost savings discovered usually pay back the retro-commissioning cost in months.

Retro-Commissioning How do you do it? Uncovering the waste in DISCO&M

HVAC Energy Cost Variation Show Me the Easy Money HVAC Energy Cost Can Vary Widely “Average” building = 46% HVAC “Wasteful” building = 2X Energy Cost vs. HVAC Complexity $2.00/sf Light Commercial $3.00 Office/School $4.00 Institutional $5.00 24/7 Hospital $6.00 Laboratory HVAC Energy Cost Variation $1-2 = Good $4-6 = Evil

Where is the HVAC Energy Savings? Gas Pedal / Brake Pedal Syndrome Improper DISCO&M = energy savings opportunities HVAC systems have many combinations of gas pedal / brake pedals that could be affected by improper DISCO&M.

Where to Start? Although each building and system is unique you can start with the following: Interview facility personnel Review construction documents Review the controls workstation Walk the site

Where to Start? Interview facility personnel They are a great resource as to why things are the way they are but not necessarily on how they should be Keep them informed on what you find, it may trigger additional thoughts If interested, train them on how the systems work

Where to Start? Review construction documents Understand the design and how the systems are supposed to work Use the schedules and rules of thumb Sum up connected loads (air and water) Compare design installation to installed Check coil ∆Ts

Where to Start? Review the Controls workstation and look for: Incorrect AHU leaving air temperature set points Valve commands at 0% or 100%, or valves fighting OA Damper commands Controlling sensors like RH and CO2 Pump / fan status on when command is off (in HAND?) Chilled water ∆T (secondary supply & primary return) Chilled water supply temperature / set point General space temperatures System stability

AHU Controls Interrogation Retro-Cx Example Dehumidification Setpoint Search for Improper Set points Device Operation Modes Input values OA damper position Unit LAT Setpoint SA SP Setpoint Coil LAT Most common discovery during Retro-Commissioning – CONTROLS not Optimized: GAS PEDAL is floored, but the BRAKES are used to control the speed of the systems.

Things to look for Hidden DISCO&M Problems = High Energy Costs VFD DP OA SA T T VAV RA T “DIS” Problems Improper programming sequence Coils piped backwards OA damper occ. / unocc. set points VAV damper actuator / calibration Service access restricted Space thermostat calibration Sensors in wrong location VFD / fan sheave sized for ‘max concurrent’ “CO&M” Problems Overridden BAS temp space set points Increased VAV airflow set points High duct static DP set point Disabled duct static DP reset logic Decreased cooling coil setpoint Preheat and Cooling coil fighting Disable supply air temp reset logic Actual OA damper position Dirty filters

Things to look for Chiller Plants Add / subtract logic Incorrect set points (chiller and system) Chillers / pumps / tower fans in manual Condenser water control Controlling sensor calibration Chiller isolation valves

Use Your Experience Does the number of operating chillers / boilers make sense? Add/subtract logic Sensor calibration Decoupler issues Does the duct static pressure set point seem right? Who’s set point is it? Sensor calibration? Does the number of pumps operating make sense? Do the differential water pressure set points make sense? Sensor location / calibration

Where is the HVAC Energy Savings? Benchmarks Annual Elec Cost 1 hp motor = $500 1 Ton cooling (MA unit) $750 = DX $400 = CHW 1,000 CFM OA (8 tons) $10,000 = DX $5,000 = CHW 1 degree Setpoint on AHU 7% of cooling capacity (10,000 cfm = 35 tons) CEP generation capacity = ‘Load’, Attack the Load first

Retro-Commissioning Exercise Expose the ‘Evil’ in HVAC Systems One foot on the gas, one on the brake T VFD DP VAV One foot on the gas T VFD DP VAV Identical air handling systems keep the space comfortable at 72F. One uses twice the energy. HOW? Systems sized for peak loads and operates in-between.

Retro-Commissioning Exercise Evil Performance = 2 x Groovy Both set-ups have comfortable 72F space temps !! T VFD DP VAV The Good! The Bad! System Component Performance Performance Cost (6 summer months) = $12,000 (62 kW, $.07) $25,000 (129 kW) Fan 7,500 cfm = 5 kW 10 kW OA 2,500 cfm (95F/78F) = 33 tons (52 LAT) 45 tons (50F LAT, +OA) Preheat coil = 0 kW 23 kW Reheat coils 20% = 9.5 kW 23 kW (50%) Chilled water 45F = 47 kW (45F) 72 kW (42F)

Retro-Commissioning 4 Case Studies

Retro-Commissioning DISCO&M Case Study #1 University Biological Science Building “CO&M” HVAC System operators and the Controls vendor were not familiar with the basis of design.

University Biological Science Bldg: Fan Frame Problems Two parallel AHUs headered together 30,000 CFM variable speed fans 4 Different stories of how the ‘system’ was supposed to operate ?? Fan motor frame that kept breaking requiring re-welding

Fan Curve #2: Unoccupied Conditions Fan Curve #1: Occupied Conditions University Biological Science Bldg: – Fan Operation in Surge 60 Hz 45 Hz 30 Hz Turbulent ‘surge’ zone of fan curve Design Adjusted operating point, 49Hz. . Fan Curve #2: Unoccupied Conditions Fan Curve #1: Occupied Conditions VAV Differential Pressure Setpoint: Set too high by untrained staff Savings: $15,000 How: Fans allowed to back off from 60Hz to 30Hz at night

University Biological Science Building Hidden Discoveries Static pressure setpoint set too high at 2.2” , instead of 1.0”. Fan always at 60Hz. VFD DP OA SA T Re-heat coil required to heat the overcooled air. T VAV RA T Pre-heat Coil improperly on. Heating summer air from 84F up to 104F. 2-position VAV box closing more than necessary to ‘eat’ excess static pressure. Cooling Coil actuator broken. Overcooling the air to 49F instead of 55F. Water Side Gas: pre-heat coil Brakes: cooling coil Gas: re-heat coil Air Side Gas: Supply fan Brakes: VAV damper

University Biological Science Bldg: Retro-Cx Results PROBLEM SAVINGS DISCO&M AHU 1-1 Low Leaving Air Temp – Re-heating by VAV: $15,000 C,O AHU 1-1 Low Leaving Air Temp – Over-cooling: $30,000 M AHU 1-1 Pre-heat Coil Operation – Pre-heating: $27,000 M AHU 1-1 Pre-heat Coil Operation – Re-cooling: $25,000 M AHU Excess Fan Speed: $17,000 C,O,M Total: $114,000 per year. Baseline Savings: $114,000 /yr ($0.90 / sf) Prevention: Training Legacy

Retro-Commissioning DISCO&M Case Study #2 CA Research Laboratory “DSCO&M” Corporate Mandate: 10% energy savings. HVAC operators did not understand where the ‘optimized’ operating points were.

BAS Interrogation - Observed Problems Improper Technician set-up of Drives. Release 60hz ceiling for direct drive fans. Should be <100% at part load 1.5” ??? Overflowing = extra pumping

BAS Interrogation - VAV w/ Reheat Optimization Opportunities from Base Design Min airflow, max heating, still over-cooling the space? Room is 2 deg lower than setpoint.

Technician said lower CW temp. BAS Interrogation - Cooling Towers Bad Operating Advice from Technician Technician said lower CW temp. When OA is 65ºF WB, you cant get less than 71ºF regardless of tower speed. (6F approach)

BAS Interrogation - CHW Installation Defects, Bad Data How did the CHWS go from 44ºF to 50ºF ? “Short Decoupler Effect”

BAS Interrogation - HW Boilers Improper Base Sequence of Operations Design coil delta-T is 40ºF The boilers are dying from short cycling at 20% loading.

Retro-Commissioning Case Study #2: Summary Primary Items Cooling Tower Operation – Turn 1 off, and modify software for condenser water reset based upon wet bulb temp. Save $1200 /wk for 20 weeks = $24,000 Hot Water Boiler Sequence – Revise controls to turn off lag boiler properly. Save boiler fuel from eliminating pre- and post-purge heat loss. +/- $20,000 Fix CHW Low Delta-T Problem – save secondary pump energy by pumping less colder water. Save 40kw for ½ year = $80,000 AHU Static Pressure 1.5” Setpoint – Optimize SP’s lower to save fan energy. Assume 5% savings of 475 bhp fan motors = $50,000 Secondary Items CHW – Constant speed pumps with variable 2-way valves; design oversight? Can save pump energy by going variable primary (add drives). $20,000 VAV with Reheat – many are reheating. Min cfm setting could be lowered to avoid reheating. And SATR logic can be implemented. Save +/- $big

Retro-Commissioning Results PROBLEM SAVINGS DISCO&M Cooling Tower Operation: $24,000 O Hot Water Boiler Sequence: $20,000 IS Chilled Water: Low Delta-T Syndrome $80,000 D or I AHU Static Pressure Setpoint Optimization: $50,000 S Constant pump CHW system with 2-way valves : $20,000 D VAV re-heating setpoints: $ big S Total: $200,000 per year. Baseline Savings: $200,000 /yr ($0.50 / sf)

Retro-Commissioning DISCO&M Case Study #3 Not-For-Profit Hospital Looking for HIDDEN CAPACITY resulting from possible improper operation.

Hospital BAS Interrogation - Typical Air Handling Unit 1. Chilled Water Valve – failed open, making 49.6ºF air. 5.4ºF colder than set point 2. Supply Fan VFD – is at 100%, no spare capacity for filter loading 3. Outdoor air damper – Software Override (SWO), changed from design setpoint

Hospital BAS Interrogation - Chiller Plant Return Chilled water temperature is too low. The return temperature should be 58F. Too many chilled water coils are over-flowing, and producing low return water temperatures. Another LOW DELTA-T PROBLEM. The flow of 1149 gpm and the calculated tons of 359, calculate a flow rate of 3.2 gpm/ton. The secondary CHW is pumping over 50% more chilled water than it should be due to failed open AHU chilled water valves.

Retro-Commissioning Baseline Savings: $200,000 /yr ($0.90 / sf) Case Study #3: Summary Not-for-profit Hospital 6 of 30 Air Handling Units had hidden cooling coil valve problems. Heating boilers are re-heating the overcooled air. The spare central plant capacity that was ‘discovered’: Cooling: 142 Tons (new spare capacity) Heating: 1.7 million btuh (25% of one big boiler) Baseline Savings: $200,000 /yr ($0.90 / sf) Retro-Cx Investment: 1 day ( Incidental) Value: Defer new 1000 ton chiller ($1000/ton)

Retro-Commissioning DISCO&M Case Study #4 For-Profit Hospital Administration wanted energy savings. Facilities Staff did not want anyone (us) to look at their system and find potential problems – it might make them look bad.

Hospital BAS Interrogation - Chiller Plant Logic Problems Building Load 1000 tons. (2 chillers needed) Three 550 ton chillers ON. (1650 tons) . Improper Chiller OFF Logic – Operating more pumps & towers than necessary

For-Profit Hospital: Improper Constant Volume Pump Set-up Circuit Setter – 80% Closed. Should have trimmed impeller

For-Profit Hospital: AHU Investigation – Improper Design Original Design / Construction Problems: Low first cost solutions = high long term operating costs

Retro-Commissioning Case Study #4: Summary For-Profit Hospital PROBLEM SAVINGS DISCO&M AHU Supply Air Temp Reset Logic $72,000 D Condenser Water Reset Temp Reset Logic $33,000 D Chiller ON/OFF Logic $10,000 D Pump Valve Adjustment $26,000 S AHU Device Tune-up $58,000 O&M Modify AHU Re-heat coil retro-fit $186,000 DIS Total: $385,000 Implementation Cost: $150,000 Baseline Savings: $385,000 /yr ($1.50 / sf) Retro-Cx Investment: 5 month Prevention: Design review , Performance Testing Training

Take-Away Retro-Commissioning Existing Buildings WHAT TO LOOK FOR: “Variable” systems and their set points Gas/Brake systems – pre/re-heat, humidity, VAV, parallel equip Starters in ‘Hand’ mode because a control device isn’t working ‘HVAC loads’. CEP’s can only meet loads. BAS Computer Screens = anything at 100% capacity DISCO&M