FOCUS POINTS FOR SITES TO IMPLEMENT TOWARDS BOILER TUBE FAILURES PREVENTION (Actionable points for site based on failure analysis ) SCOPE: BOILER PRESSURE.

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

ACTIVE LEARNING PROCESS
Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
CASE STUDY ON BOILER ACCIDENT
BeginningNext SlideBack End Program AVADAL 1 of 21 SK-1 Roller Apron Segment Overview.
[Organisation’s Title] Environmental Management System
Transportation Tuesday TRANSPORTATION TUESDAY A quick auto check eases driving worries!! Before you pull out of the driveway or parking, take time to check.
Material Tour of Boiler - Catastrophic Failures of Boiler Components Presented by George W Galanes, P.E. Metallurgical Consulting Engineer Diamond Technical.
Steam Generation – Operational Flexibility and Lifetime Extension Considerations Kevin Murray Senior Integrity Engineer Marsh Power Forum – Istanbul, October.
Environmental Management System (EMS)
The New TNI Laboratory Accreditation Standards Requirements for an Accreditation Body.
Watertube Boiler.
CASE STUDY-III BOILER TUBE FAILURE. The Incident  Boiler Make: MIURA  Date: March 26, 2010  Place: At sea  Initial Indication: Frequent water being.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
CONSTRUCTION OF SOIL NAILING WALLS
Where does Failure Mode and Effects Analysis (FMEA) come from?  Developed by the Aerospace industry in the1960s  Spread to the Automotive industry 
Hazard Analysis Ensuring Safe food. Hazard Analysis.
Computer Security: Principles and Practice
Pump Installation Vigyan Ashram, Pabal.
Hazard Analysis and Critical Control Points
AUDITS AND INSPECTIONS
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Protection Against Occupational Exposure
Seafood HACCP Alliance for Training and Education Chapter 10 Principle 6: Establish Verification Procedures.
© 2009 Michigan State University licensed under CC-BY-SA, original at Corrective Action.
BRC Food Safety Quality Management System Training Guide
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
U D T Workshop on the Pressure Equipment Directive, Warsaw June 2004 INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC SYSTEM OF ENSURING.
 Coal comes in to the plant by barge transportation.  Coal is pushed onto a conveyer, that carries the coal straight into the plant.  The coal is then.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
EuropeAid/131555/C/SER/RS Major Accident Prevention Policy Safety Management System Ernst SIMON, Styrian Regional Government, Austria Belgrade, December.
INTRODUCTION Definition:
Basics of OHSAS Occupational Health & Safety Management System
NFPA 31 Standard for the installation of Oil- Burning Equipment
Installation. Indoor Unit Installation Typical Installation.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
DEFECTS OBSERVED IN RADIOGRAPHIC TESTING
BUILDING MATERIAL BUILDING MATERIAL PALESTINE UNIVERSITY chapter No.#7 Mechanical Works Dr. Ali Ibrahim Tayeh.
Important informations
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
MNM Fatal Falling Material Accident Falling Material Accident April 4, 2013 (Arizona) April 4, 2013 (Arizona) Copper Operation Copper Operation.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
1 Encotech Steam Path Audits Presentation. 2 Overview What is a Steam Path Audit? Benefits Cost Chronology of a Steam Path Audit STPE Results.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
THERMAL POWER PLANT. INTRODUCTION : THERMAL POWER PLANTS CONVERT THE HEAT ENERGY OF COAL INTO ELECTRICAL ENERGY. COAL IS BURNT IN A BOILER WHICH CONVERTS.
06/01/20161 Benny Hoff TÜV NORD Sweden AB AFS 2002:1 Use of pressure equipment.
THERMAL POWER PLANT.
Controlling By: Mrs. Belen Apostol. What is controlling refers to the process of ascertaining whether organizational objectives have been achieved; if.
MNM Fatal Powered Haulage Accident Powered Haulage Accident December 8, 2011 (Minnesota) December 8, 2011 (Minnesota) Crushed Stone Operation Crushed.
ANALYSIS OF HEAT RECOVERY &STEAM GENERATOR MODULE WELDING V.VINOTH( ) Final- Mech AVCCE Internal Guide : Mr. S.Rajkumar, M.Tech Asst.Prof /AVCCE.
Table 1. The Five Medical Laboratory Case Studies Jan Martin et al. Transnational Evaluation of a New Continuing Professional Development Activity for.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
CE UNIT 1  Maintenance is the act of keeping something in good condition by checking or repairing it regularly.
21 Curtis Court Building 1 Cartersville, GA Phone: Web Site:
Six Sigma Greenbelt Training
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
WELD POLYETHYLENE (PE) PIPE USING FUSION METHOD
CASE STUDY ON BOILER ACCIDENT
ISO/IEC
Maintaining Safety Standards
SAFE WORK INSTRUCTIONS
Maintaining Safety Standards
Temporary Works Co-ordination
Material Tour of Boiler - Catastrophic Failures of Boiler Components
Prepare your property for severe cold
4th Annual Construction Law Summit
UNDERSTANDING FOR STANDARD
GENERALPIPINGREQUIREMENTS:. Designing and erecting an efficient piping system requires certain aspects/ requirements which could be found in our PME handbook…
Presentation transcript:

FOCUS POINTS FOR SITES TO IMPLEMENT TOWARDS BOILER TUBE FAILURES PREVENTION (Actionable points for site based on failure analysis ) SCOPE: BOILER PRESSURE PARTS(HEADERS,TUBES,LINKS, PIPES etc)

Header to Stub Weld Failures Headers stubs are probably getting strained during transportation, improper handling, erection (overloading) resulting into failures taking place at various stages from boiler hydro test to boiler going into operation. All the header stubs are to be checked for leakage, sweating etc during site hydro tests. After attaining full pressure & completion of hydro test , system pressure may have to be brought down at lower working pressure & this checking needs completion on all the headers before draining the system. Failures are to be reported to units with sufficient details and findings as and when experienced.

Tube to Tube Butt Joint Failures Welders performance monitoring has to be done on continued basis & to be re-qualified at regular interval as applicable. Edge preparations by machining & automation of welding needs due consideration. Process quality audit at sites by external agency is to be introduced. Failure data along with failed tube samples are to be sent to Trichy unit for analysis for taking suitable corrective & preventive measures.

Attachment Weld Failures Attachment welding shall necessarily be done by qualified welders at site. Failure data along with failed samples may be sent to unit for analysis for taking suitable corrective & preventive measures.

Fly Ash Erosion Failures Excess gaps in back pass, especially between steam cooled wall and LTSH/economiser is to be informed to units for advice & corrective measures to be taken up. Refractory work has to be ensured as per drawing.

Steam Erosion Failures Proper functioning of thermal drain valve, lance tube retract mechanism and proper closing of poppet valve after blowing are to be ensured. Proper functioning of ASLD is to be ensured to minimise secondary damages. Also educate our customers suitably in this regard.

Choking Failures Boilers in operation , it has been observed that foreign materials have been left out in the headers resulting into choking, starvation & resultant failure. All the headers shall be inspected (by boroscope) before welding the last member to the header. Sub contractor personnel may have to be appraised about the consequence of leaving unwanted material inside headers/pipes/tubes.

Raw Material Defect Failures All the failed tube material samples shall necessarily be sent to Trichy Unit for analysis for taking suitable corrective & preventive measures.