A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.

Slides:



Advertisements
Similar presentations
Recycling Waste Heat – CHP as an alternative
Advertisements

September Wood to Warmth – Heat Networks Michael Beech TV Energy.
Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
PPC4000 COMBUSTION EFFICIENCY SYSTEM
XEnergy Technologies Energy Efficiency Through Creativity.
Technologies 1 CHP (VA Dallas Case Study). Proprietary Information Of Energy 2013 Dallas VA Medical Center A CHP Case Study Design Build Delivery of a.
Region II WIN Feb © 2011 Babcock & Wilcox Nuclear Energy, Inc. All rights reserved. A practical, scalable, modular ALWR.
March 2013 Claus Ballzus IGC Capacity 303 MW e and 133 MW t Largest geothermal power plant in Iceland Second largest power plant in Iceland Co-generates.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Energy-Efficient Process Cooling
* A chiller capable of producing water temperatures of low 40s on the evaporator side and above 135° on the condenser side.
DOE - Chiller System Optimization Opportunities With Gas Engine-Driven Cooling Systems.
A Brief History 1889 – District energy comes to Philadelphia
Improve Facility Operation through Commissioning-A Case Study Mingsheng Liu, Ph.D., P. E. University of Nebraska.
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
New Technology Improves Efficiency of Universitys Energy Infrastructure Frank Brewer Associate Vice President for Facilities Management University of Maryland.
Geoexchange at CMU Regional public higher education institution 3 campuses in Grand Junction, CO. Main campus 78 acres and 1.5 million s.f. under.
Energy Security Federal Research Center at White Oak, Silver Spring, MD January 16, 2013.
Building Star and the HVAC Industry David Calabrese, Sr. Vice President, Public Policy.
August 2008 WATCH YOUR STEP! CONSTRUCTION PROJECTS UNDERWAY!
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Technologies for CCS on Natural Gas Power Systems Satish Reddy April 2104.
Energy Saving in Hospitals: Hong Kong Initiatives
Sustainability in the Finger Lakes Geothermal at Hunt Country Vineyards.
Installation of New CHP system at the Old Aberdeen Campus.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
Content of the Presentation
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
COGENERATION Allison M. Selk 12/8/04 CBE 562.
Utility Planning For North Campus Upgrades Area in and around Cook Physical Science Building Sal Chiarelli, Director of Physical Plant November 15, 2007.
CHW Optimization Case Studies
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
POWER GENERATION TECHNOLOGIES
Physical Plant Department Physical Plant Department Salvatore Chiarelli Director Of Physical Plant UVM 284 East Avenue, Burlington VT 05405
Eastern Illinois University Energy Conservation and Sustainability Program December 11, 2007 Lt. Governor Pat Quinn Sustainable Government Symposium IDNR,
Oklahoma City Community College Strategic Planning Approach Cuts Cost….Improves the Learning Environment Smart and Sustainable Campuses Conference Monday,
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Cogeneration at UC July 18, Welcome 3 Transformation of the Power Plant POWER PLANT CENTER OF CAMPUS CENTRAL UTILITY PLANT 2007.
UVM UTILITY SYSTEM MASTER PLANNING IDEA CONFERENCE International District Energy Association Sal Chiarelli, Director of Physical Plant, UVM February 2006.
Lansing Board of Water & Light REO Town Headquarters & Cogeneration Plant REO Town Cogeneration: Concept to Commercial Operation.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
FY 2005/06 Accomplishment Eastern Maine Medical Center (EMMC) Receives “Critical Power Reliability” from CHP System CHP System Construction Project is.
Some Basic UVM Info 425 acres of maintained acreage.. Central Steam Plant Central Chilled Water Plant Back Up Boilers Research.
NOVO ETS IMPROVING YOUR ORGANIZATIONS’ ENVIRONMENTAL, HEALTH AND SAFETY PERFORMANCE ENERGY MANAGEMENT IN THE CONTEXT OF GREEN PRODUCTIVITY.
Re-Commissioning of the Water Cooling System at Université de Sherbrooke Department of Buildings June 2008.
Phoenix Convention Center Phoenix, Arizona District or Distributed Integrated EnergyDistrict Heating and Cooling Robert McMillin Siemens Industry, Inc.
Salvatore Chiarelli Director Of Physical Plant UVM 284 East Avenue, Burlington VT (802) (802) fax
VIMS Seawater Research Laboratory Dan DiCriscio AE Senior Thesis Mechanical Option 2007.
Physical Plant 2015 All Hands Meeting Sal Chiarelli, Director of Physical Plant, UVM October 8, 2015.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
Welcome. GRU South Energy Center Anderson Illustration Association, Inc Phase 1 – 500,000 sf – 192 beds Build out – 3 M sf - 1,200 beds Shands.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Chilled Water Plant Overview From Project Concept To Operation July 26, 2007.
Energy Conservation Building Upgrades Alma School District.
Cogeneration at UC March 09, Welcome Central Utility Plant.
UMCP Learning Objectives
Grunenwald Science and Technology Building
Director Of Physical Plant UVM 284 East Avenue, Burlington VT 05405
Presentation on Cogeneration and District Cooling Plant
campus carbon footprint
Energy Conservation CERD /12/2017
Michigan Energy Summit | April 25, 2019
Energy Management Introduction Rantharu Attanayake BSc. (Eng), MSc, MBA EE – Energy Management Mobile :
Presentation transcript:

A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM

Executive Summary Over the past decade the University of Vermont (UVM) has taken campus utility systems from the master planning stages to full implementation. A true Utilities Master Plan, the following slides will showcase the strategic projects dealing with underground steam line distribution renewal and expansion, the Universitys central chilled water plant construction, tactical planning utilizing existing auxiliary boilers and chillers for system back up, system maintenance, optimization and control. The UVM Physical Plant Department has partnered with outside consultants, contractors and our own in-house institutional knowledge to create campus district energy systems that are not only coordinated with the University of Vermonts overall Campus Master Plan, but are also capable of serving the University far into the future.

Background Utility Mapping Master Planning Issues Implementation Infrastructure Renewal/Expansion Projects Central Plant Projects Costs Results Overview

Background Central Heating & Cooling Plant (CHCP) 5 Boilers – serving 3.7 Million sqft Dual-fuel (#6 fuel oil and natural gas) Maximum steam capacity is 224,500 lbs/hr Steam is generated at 220 psi and 398 F 2 Chillers (steam driven) – serving 1.2 Million sqft Maximum cooling capacity is 2730 tons Variable/Primary (maximum pressure -100 psi) and 42F 8.8 miles of underground distribution piping 40 Steam & chilled water manholes 1.1 MW Emergency Generator Satellite/Back-up - 12 Boilers 12,836 Steam traps 150,000 gallons of #6 oil are stored at the Plant. 26 Chillers; 69 Boilers support facilities not served by the CHCP

Existing Utility Mapping Why is this important to UVM? Ensure Reliability Safety Cost effectiveness Growth Dedicated utility corridors Environmental impact Maintainability Serviceability

4/7/046 Master Planning Utilities 5 year Steam & Chilled Water Master Plan

What Are Some Of Todays Issues What is the planning and strategy supporting? Growth on campus Energy costs Systems are outdated and obsolete Air conditioning is an expectation Utilities are critical for Research System reliability Emissions/Air Quality/Permitting

Implementation Projects I.Underground Infrastructure Replacement (03 – 08) II.Chiller Plant (06 – 07) III.Given Boiler & HSRF Chiller Plant Loop (08 – 10) IV.North Campus Upgrades (10 – 11)

GENERAL CONDITION OF 1980 VINTAGE PIPING CONDUIT/CASING FAILURE DEGRADING VAULTS

Concrete Trench Box Field Fabricated System SIMPSON TO GUTTERSON

Prefabricated System Pre-Insulated System MAIN STREET TO UNIVERSITY HEIGHTS – 2004/2005

DAVIS CENTER TO MAIN ST Prefabricated System Pre-Insulated System

Prefabricated System Pre-Insulated System CHP TO BAILEY/HOWE & MARSH LIFE – 2006/2007

Facilities Served Initially (07)Facilities Served Initially (07) –Davis Center –Bailey/Howe –Old Mill/Lafayette –Royal Tyler Theatre Underground PipingUnderground Piping –4100 FT of Chilled Water Supply & Return Piping –1700 FT of High pressure Steam and Condensate Piping. Plant EquipmentPlant Equipment –(2) 1365 Ton Steam Driven Turbine Chillers –(3) 200 HP CHW Pumps –(3) 200 HP Tower Pumps –(4) 40 HP Tower Fans CENTRAL CHILLER PLANT– 2006/2007

FIRST TWO OF THEIR KIND IN VERMONT STEAM DRIVEN TURBINE/CENTRIFUGAL CHILLER

CHW PLANT – FALL SHUTDOWN UNDERGROUND DISTRIBUTION TIE-IN

CHILLER DELIVERY VARIBLE SPEED; PRIMARY PUMPS

CHW PLANT – TOWER ENCLOSURE & SUMP

CHW PLANT – STEAM BLOW

TOWER ENCLOSURE AND SITE IMPROVEMENTS

CHW PLANT CONTROL STATION

GIVEN BOILER REHABILITATION – 2008 Remote site/virtual 6 th boiler (2) steam boilers 40,000 lb/hr Provide both load shed and redundancy for medical school

CHILLED WATER LOOP (HSRF): More efficient chilled water generation/distribution Reduction in HSRF Electric usage Existing Chillers will provide both load shed and redundancy for medical school JEFFORDS/HSRF LOOP – 2008/2009

NORTH CAMPUS STEAM & CHW DISTRIBUTION Phase I Prefabricated System Pre-Insulated System

NORTH CAMPUS STEAM & CHW DISTRIBUTION Phase II Prefabricated System Pre-Insulated System

Plant Equipment & Infrastructure Project Costs: Simpson to Gutterson (Phase III) $ 1,800, MH N1 (103) to Harris w/ feeds to U-Heights $ 3,100, MH N6 to MH N3 (thru Davis Center Site) $ 3,200, MH N3 to MH N1 $ 1,587, Austin to Millis $ 325, Chiller Plant & Infrastructure: to BH, RTT & Old Mill/Lafayette $ 11,850, Chilled Water Infrastructure: Davis Site & Connection to Davis: $ 1,750, Votey to Perkins $ 400, Jeffords Steam & CHW; Loop to HSRF $ 3,800, N. Campus Steam and Chilled (Phase I)$ 2,200, Given Boiler$ 1,650, PFG Boiler$ 698, Total $ 32M

Since 2003…. Over 500,000 sqft of new space the central plants peak output has decreased more than 10% (20,000 PPH). Over $32 million invested in the CHP Equipment and Campus Infrastructure 5.3 Miles of Underground Infrastructure installed (Replaced & New) 5 electrical chiller retired; 2 Steam Absorption Chillers retired (MLS) Installed Chillers producing water at 8.5 PPT vs. 20 PPT Maintained Boilers at 83% combustion efficiency; 90% of condensate recovery Rehabilitated Boiler Capacity of 40,000 Medplex 2000 Tons of cooling reserve at Medplex Results

Contact Information David C. Blatchly, EI Project Engineer The University of Vermont 284 East Avenue Burlington, Vermont