Building for Learning Project Photo Progress Report December 2009 Project commencement 21 st September 2009.

Slides:



Advertisements
Similar presentations
Western Area Power Administration Transmission Customer Meeting April 22, 2008.
Advertisements

Administrative issues Hanna Tolonen EHES JA Kick-off meeting, 21 January 2010, Luxembourg.
This is a partial presentation that I did for an employer who received a 5 million dollar contract from this presentation. The total slide count was over.
Building for Learning Project Photo Progress Report 4 November 2009 – December 2009 Project commencement 21 st September 2009.
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
© 2009 Dominion August 5, 2009 Underground Transmission Lines at Dominion Virginia Power Update for the Joint Committee on Technology and Science Presented.
1/8 AND, OR and NOT b How many boys? b How many girls? b How many blue? b How many red?
Lim Sei cK.  16 th September 2013 – 7 th December 2013  ACADEMIC WEEK 1 – WEEK 11  9 th December 2013 – 4 th January 2014  BRUNEI STUDENT HOLIDAY.
Weekly Attendance by Class w/e 6 th September 2013.
Berwickshire High School Presentation compiled 15 th October 2009.
366,84 m2 114,09 m2 220,84 m262,34 m2 Renaissance Premium have 2 underground parking floors which let 66 cars to park safely. 1 st Floor Bank Cafe Renaissance.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
Building the Rankin Ridge Fire Tower 2006 marked the 50 th anniversary of the construction of the Rankin Ridge Fire Tower. Because of improved fire fighting.
Click to continue…. Railroad Track wetland Image Date: December 2003.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
RHM - ADAMS MISSION CHURCH BUILDING PROJECT AFM Folweni Manase Branch.
Building for Learning Project Photo Progress Report Month of June 2010 Project commencement 21 st September 2009.
SRT251- Construction and Structures 2 Timber Portal Frame Glenn Murcutt Daniel McLean
TAIPEI FINANCIAL CENTER TAIPEI 101 QUICK FACTS Holds the record as the world’s tallest building. Rises 501 meters (1,667 feet ) above the ground. 101.
DUBAI STAR WORK PROGRESS DATE 23 JULY Material At Site.
Kubota on hand to remove rubble. Farmall H with tilt trailer.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Vertical Concrete Slipforming Scholer-Peterson Concrete Conference February 12 Kansas State University by Fred J. Fairchild, P.E. Department of Grain Science.
SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
October 2011 Newsletter Supplement For additional information, please contact: DelDOT Public Relations 800 Bay Road, P.O. Box 778 Dover, DE
Concrete Construction
The Hashemite university Faculty of Engineering Civil Engineering department Construction Project Management Crew Balance Chart Prepared By : Nedal M Aqel.
TRUCK LOADING / UNLOADING USING TRUCK LOADING PLATFORM.
Malawi 2014 Building Progress Administration block and staff toilets internally painted with PVA and 2 topcoats Window frames repainted with 2 coats.
Building for Learning Project Photo Progress Report 6 February 2010– March 2010 Project commencement 21 st September 2009.
Introduction to a pit installation
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
The Evolution of the TERRA Crystal Galleries Mineral Showroom.
Building for Learning Project Photo Progress Report Month of May 2010 Project commencement 21 st September 2009.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Monday 1 st June 2009 Major Projects Dewar Place Cable Tunnel Works at Gardner’s Crescent Update Meeting.
When the sub floor is ready the bricklayers can then move onto the site and build the main shell of the house.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
St. Peters School Carpeting and Refresh project October 5,6 and 7 th St. Peters School Carpeting and Refresh project October 5,6 and 7 th
Introduction to a Flattop scale The scale to be shown is an Emery/Winslow Flattop Scale Platform is 40’x11’ with site rails. The foundation is a raft.
Building for Learning Project Photo Progress Report Month of May 2010 Project commencement 21 st September 2009.
Where Are We Going Exactly, and Why? Fallingwater Kentuck Knob 2. Frank Lloyd Wright was one of the most innovative architect of the 20 th century. Wright.
Prison Manage to see through outside but cannot reach. The feeling of trap. Old Jetty Bigger shelter covers the path way. Therefore, the path way is protected.
Building for Learning Project Photo Progress Report 5 December 2009 – February 2010 Project commencement 21 st September 2009.
The four basic types of structures are :
High Efficiency Home with full Warehouse/Guesthouse and Cabana House By: Sutton Yanosky.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
AHS+Associates Final Project Name Here Final Project Architect – Your Name Put your favorite drawing, sketch, photo, etc. of your project here.
Intro to Computers By David Becker. Space Needle For my website I did research on the Space Needle in Seattle. The following slides will tell you about.
ALL THINGS CONCRETE. WHAT IS CONCRETE Is a mixture or cement (usually Portland cement), aggregate (gravel, and sand), water and chemicals added to the.
ET 494 – Senior Design II Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
Building for Learning Project Photo Progress Report September 2010 Project commencement 21 st September 2009.
Click here for the LIVE WEBCAM
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Designing a Commercial Shopping Center
Graduation Project 2 Redesigning a Villa
CHAPTER 5 IRC 2009 FLOORS.
Organics Waste Processing Facility Construction Progress Update December 15, 2010
Minuteman Vocational Technical Regional High School Progress
Stock Market Challenge Grading Rubric Money Management
Advance Pediatric Care Pavilion Update June 21, 2016
Value of contract: Length of contract: Contract start date:
The Transformation of A Small Company Into A Golden Legend
Post Construction Cleaning services are in huge demand these days. Most of the people living in major cities are finding it hard to hire a Post construction Cleaning service .Moreover, if you are selecting a Post Construction Cleaner from reputed cleaning
MKCG MEDICAL COLLEGE & HOSPITAL, BEHRAMPUR, ODISHA
SEPTEMBER 2019 ISSUE/42 nd VOLUME.
Presentation transcript:

Building for Learning Project Photo Progress Report December 2009 Project commencement 21 st September 2009

December new on-site substation for power required.

December – carpet, ceilings and windows in modernised Administration area

December – steel, bond deck arrives for 1 st Floor

December – underground cable boring and concrete footings for stairways and elevator

December – Company Directors tour with Graeme Connelly – girls were happy, boys were serious. L-R. Chairperson Kerryn Dwyer-Parish, Director Jan Wyatt-Brown, Director Alison Mitchell, Corporate Services Manager Pauline Butler, Builder Graeme Connelly, Director Rod Jones, Director David Ryan.

December – bracing underneath bond deck and steel ready for concrete floor above

Final preparations and then concrete pour starting 6am, 22 nd December – 150 tonne concrete

22 nd December – 11 truck loads of concrete