Supported Scaffold Safety

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

Fixed and mobile scaffolds
SCAFFOLDING AWARENESS
Construction Industry
PUMP JACK/LADDER JACK SCAFFOLD PHOTO COMPLIANCE GUIDE
These materials have been developed based on applicable federal laws and regulations in place at the time the materials were created. The program is being.
Scissor Lift Safety Training
Scaffold and Aerial Lift Safety
OSHA’s Fall Protection Requirements
Fall Protection Falls 4,628 fatal work injuries were recorded in the United States in deaths a week or 12 deaths every day 806 construction related.
§ – Subpart L Oklahoma State University2.
Supported Scaffold Safety
SCAFFOLD SAFETY.
OSHA Office of Training & Education
Scaffold User Training
1 Scaffolds. 2 History Subpart L originally issued in December 1971 Amendments during the first two years:  Planking grade  Overhead protection  Plank.
OSHAX.org - The Unofficial Guide to the OSHA
OSHA Office of Training and Education
Stairways and Ladders 1926 Subpart X - Stairways and Ladders
Organization of Standard Scope, Application & Definitions Covers all scaffolds used in workplaces. Does not apply to crane or derrick suspended.
Safety : Scaffolds Introduction to Industrial Technology Spring 2014
1 Scaffolding Safety. 2 The Cost of Poor Scaffolding Safety Every year: 50 deaths 4,500 injuries 25% of injured workers had no safety training.
Developed under an OSHA Susan B. Harwood Grant, #46F4-HT01, by the Associated Builders and Contractors-Central Texas Chapter 1 Scaffolding For Residential.
Rev: Section 5 Ladders and Scaffolding. Rev: Learning Objectives: Section 5 Determine the proper ladder to use based on weight capacity.
Chapter 3: Scaffold Safety
Roofing Fall Protection The following presentation can be used to satisfy the training requirements of the Fall Protection Standard in the WISHA Safety.
OSHA Office of Training & Education
Climbing the Ladder to Safety
OSHAX.org - The Unofficial Guide to the OSHA1 Stairways and Ladders.
Stairways and Ladders.
Walking-Working Surfaces
Walking-Working Surfaces: Preventing Falls.
1 Telecom Cabling Ladder safety. 2 OSHA Office of Training & Education ation Telecom Cabling Stairways and Ladders.
Office of Training & Education1 § SUBPART L SCAFFOLDS.
CFR SUBPART L SCAFFOLDS
Scaffold User Training
Erecting & Dismantling
Walking-Working Surfaces. Housekeeping is more than being tidy All areas are clean, orderly, and sanitary Floors are clean and dry Areas free of protruding.
LADDER & STAIRWAY SAFETY
Fall Protection in the Roofing Industry
Safety for Working in High Places
FALL PROTECTION. WHY? –BECAUSE: Falls accounted for 10% of fatal work injuries in 1994 & Serious hazards can be present while above ground. –Examples:
OSHA’s Fall Prevention Campaign
Scissor Lift Safety Training Working Safely on Scissor Lifts 29 CFR OSHA Scaffolding Safety Requirements.
11 Photos in this presentation are from the OSHA Region 4 National Photo Archive and OSHA Region 5. Is This a Fall Hazard?
Walking-Working Surfaces: Preventing Falls. Start Safe and Stay Safe In order to Start Safe and Stay Safe in the areas where you walk and work, you should.
OSHA Office of Training and Education - Revised by TEEX 12/04/07 1 Walking-Working Surfaces.
Fall Protection.
1 Construction Safety. 2 Construction Site …… A dangerous Workplace.
Supported access Stairways and Ladders
Office of Safety & Health Consultation Office of Safety & Health Consultation presents Focus Four Fall Protection in Construction Focus Four Fall Protection.
OSHA Office of Training and Education 1 Walking-Working Surfaces.
Click to edit Master text styles – Second level Third level – Fourth level » Fifth level Click to edit Master text styles – Second level Third level –
OSHA Office of Training & Education
Excavation & Trench Safety
Click Here to Begin. Click on to move forward Click on to move back to Previous screen Click on to go Home Next Back Next.
OSHA Office of Training & Education
Scaffolds 1926 Subpart L - Scaffolding
§ SUBPART L SCAFFOLDS. History  Subpart L originally issued in December 1971  Amendments during the first two years: Planking grade Overhead.
OSHA’s NEW Walking-Working Surfaces
Fall Protection for Construction
Scaffolding By Scott Santon
§ SUBPART L SCAFFOLDS 1.
ایمنی داربست BS Subpart L - Scaffolding
Subpart M Fall Protection.
Scaffolding.
الســقالات 29 CFR CFR تشير الإحصائيات بأن أكثر من 3 مليون عامل يعملون فى السقالات كل عام. كذلك تشير الإحصائيات إلى إصابة ما يزيد عن.
10-Hour Construction Outreach
§ SUBPART L SCAFFOLDS 1.
10-hr. General Industry – Fall Protection
Presentation transcript:

Supported Scaffold Safety An Overview of Scaffold Safety May, 2011

Topics Covered Scaffold hazards Duties of a “competent person” Basic scaffold requirements Fall protection and guardrails Employee training

Supported Scaffolds Examples Ladder jack scaffold Fabricated frame scaffold Mobile scaffold Supported scaffolds are scaffolds that are in contact with the ground rather than being suspended by cables.

More Supported Scaffold Examples

Hazards of Scaffold Work According to the scaffold industry association, the five most serious scaffold hazards are: Falls Unsafe access Falling objects Electrocution Scaffold collapse Falls, scaffold collapse and electrocution account for most scaffold related fatalities. A combination of regular inspection and consistent training of workers can go a long way to reducing these risks.

Scaffold Collapse Can Happen The safety of a scaffold is highly dependent upon being built right in the first place. When scaffolds fail, they fail in a catastrophic way and can cause many serious injuries or deaths depending on who is on or around it when it fails.

Damage Scaffold Parts Damaged or weakened parts must immediately be: Repaired, replaced, braced to meet minimum strength OR Removed from service until repaired.

Erecting, moving, altering or dismantling scaffolds Must be supervised and directed by a competent person Must be done by trained employees selected by a competent person

What is a “Competent Person”? A competent person is able to: Identify existing and predictable hazards, Identify working conditions that are unsanitary, hazardous or dangerous and: Has authority to eliminate hazards. A competent person must: Have knowledge of what the scaffolding standard requires for workplace safety training and experience in erecting and inspecting scaffolds, know about the kinds of hazards that can exist around scaffolds, be designated by management as the competent person, have authority to take action to stop unsafe activities and eliminate hazards identified.

Erecting and Dismantling Scaffolds While scaffolding is being erected or dismantled: A “competent person” determines feasibility of fall protection, and the employer must provide the maximum feasible fall protection. Questions to ask are: Is there a nearby structure from which a lifeline can be dropped that the worker can tie off to? Can we install guardrails immediately after installing the fabricated frames and before moving to the next level? Can we sequence disassembly to keep the worker protected for the maximum feasible time? Whatever is feasible to do must be done during the assembly/ disassembly stages.

Fall Protection on Scaffold Employers must provide fall protection on a scaffold more than 10 feet above a lower level by one of these methods: Guardrails, which must be: Installed along open sides and ends and In place before employees use the scaffold OR Personal fall arrest system In accordance with WAC 296-155 Part C-1 and WAC 296-874 -20052 Must be attached to the structure or a lifeline and not the scaffold

Examples of Lack of Fall Protection

Requirements for Guardrails Guardrails consist of toprail, midrail and falling object protection, such as a toeboard The toprail must be between 38” – 45” high and withstand a 200 lb. force The midrail must be installed midway between the top edge and the platform surface and withstand a 150 lb. force A toeboard, when used, must be 3 ½ inches tall and able to withstand a 50 lb. force. Barricades at base of scaffold can be substituted for toeboard Toeboard (2 X 4 50 lb strength), screen or nets if employees walk or work below. An alternative is to barricade the area around the base of the scaffold. Top surface smooth to prevent puncture or snagging of clothes. Manila or plastic rope rails must be inspected frequently to assure that it doesn’t deteriorate below strength requirements. Don’t use steel or plastic banding as a top rail. Don’t let ends of rails overhang the terminal post unless there isn’t a hazard. You can only use cross braces in lieu of a top rail or mid rail but not both if a 19” sphere won’t pass through the resulting openings. Cross bracing is acceptable in place of a midrail when the crossing point of two braces is between 20 inches and 30 inches above the work platform. Install the top rail between 38” and 45” Cross bracing can be used as a top rail when the crossing point is between 38 inches and 48 inches above the work platform. Install the midrail ½ way between the cross point and the platform The end points at each upright must be no more than 48 inches apart.

Guardrails Cross bracing or “X” brace can substitute for top rail or mid rail but not both. You can only use cross braces in lieu of a top rail or mid rail but not both if a 19” sphere won’t pass through the resulting openings. Cross bracing is acceptable in place of a midrail when the crossing point of two braces is between 20 inches and 30 inches above the work platform. Install the top rail between 38” and 45” Cross bracing can be used as a top rail when the crossing point is between 38 inches and 48 inches above the work platform. Install the midrail ½ way between the cross point and the platform The end points at each upright must be no more than 48 inches apart. Cross bracing is acceptable in place of a midrail when the crossing point of two braces is between 20 inches and 30 inches above the work platform. Cross bracing can be used as a top rail when the crossing point is between 38 inches and 48 inches above the work platform. The end points at each upright must be no more than 48 inches apart.

Provide a Ladder, Ramp or Direct Access For platforms more than two above or below a point of access Stairs must have a rest platform every 12 feet. Slip resistant tread minimum 18” wide. Ramp: Max 20 degree slope with non-slip or cleats Min 18” wide, guardrails if more than 4 feet above adjacent surface. Direct access: Max 14” step across distance. In the picture on right, the worker is climbing the scaffold frame, which is in violation of the rule.

Power Line Clearance Insulated power lines Uninsulated power lines Less than 300 volts – 3 feet Less than 300 volts – 10 feet - 300 volts – 50 kilovolts = 10 feet Over 50k Volts, add .4” per KV Examples of scaffolds too close to power lines You can get closer than these distances if you contact the power company and they deenergize the lines and visibly ground them or install protective shields.

Footings Support the load without settling or displacement Level Sound Rigid A mud sill isn’t needed on a concrete surface or dry compacted soil. You always need the base plate.

Unstable Footing Examples Cardboard, sticks, blocks, rocks or bricks aren’t a sound method of leveling

Platform Specifications Each working level fully planked; no more than 1” gaps Minimum platform and walkway width of 18” Overlap planks between scaffold sections by at least 12” Extend end over support 6” min. (Maximum end extension 12”) Don’t paint planks since they will hide defects Front edge within 14” of the work, or guard rails or fall protection must be used. Fully decked between uprights and guardrails supports. Platforms must be at least 18” wide Except Ladder jack, pump jack, top plate bracket or roof bracket type scaffold must be at least 12” wide. Except when the area is too narrow to allow 18” width guardrails or fall protection must be used. The intent is that there be no more than 1” space between planks and uprights. However planks can be up to 9 ½” away from the upright if you can show that the scaffold requires additional space (such as to fit around the uprights when side brackets are used to extend the width of the platform.) Extend planks over the supporting members at least 6” unless you have tied the plank or use cleats or hooks on the underside. Don’t extend the plank more than 12” (10’ or less plank) or 18” (longer than 10’ plank) or you could flip the plank up if you step on the extension. Overlap planks between sections of scaffold by at least 12”. You can only overlap over a supporting bearers. Overlap can be less if planks are secured with cleats or tie wires You can butt planks if each has their own support and are tied or hooked. Overlaps can only be made above supporting bearers Don’t paint planks since this will hide defects or damage that may only become apparent if someone falls through the plank. Wood preservatives and non-slip finishes ok if they don’t obscure the top and bottom surfaces. If the scaffold front edge isn’t within 14” of the wall then you must use guardrails Except that plaster and lathing operations can be 18” away.

Examples of Improper Scaffold Planking Scaffold platforms must be fully planked with no gaps greater than one inch. (and this employee needs fall protection) Gaps too wide between planks

Planks can’t extend more than 18” beyond their support If it’s not adequately secured, it can tip if you walk out past the support. If a plank extends too far past the support because it’s too long, you can barricade access to the hazardous area.

Plank Specifications Scaffold grade or equivalent 1,500 lb-f/in2 (stress grade) construction lumber Manufactured planks used according to manufacturer’s recommendations The standard does not specifically require scaffold grade planks. However, the platform material you use must be able to support 4X the intended load. If you use a manufactured plank then you need to follow the manufacturer’s instructions in terms of weight limit and distribution of that weight (uniformly over the entire span) e.g.: three person plank has max 250 lbs at center and additional 250 lbs at 18” to the right and to the left of center.

Wood Plank Inspection Damaged wood planks include: Rot - "squishy" feel, or powdery appearance from termite damage Cupping of 3/8" or more on a 10" wide or 1/2" or more on 12" wide plank. Crook of more than 5/16”, bow of more than 7/16” or twist of more than ¾” on a 10’ long 10” board. Wane of more than ¼ the width and ¼ the thickness for more than ¼ the length of the plank. A split that has a length of 1 ½ times the board width or more. Knots that are more than 1 ½” diameter if loose or 2” diameter if tight on a 10” plank. A notch cut into a plank more than 1/3 the plank width. Any saw kerf cut across the plank weakens the plank by the depth of the cut. The problem may not be noticed if the plank is later laid with the cut side down. Damaged manufactured planks: Bent or cracked in hooks (DON’T repair by re-bending hook.) Cracked rails Damaged decking Corrosion to metal supports Loose fasteners

Plank Load Capacity 4 times the intended load + scaffold weight Planks must not deflect more than 1/60 of span when loaded

Examples of Overloaded Scaffolds

Overlaps Angled plank is not on the bottom Not fully planked at transition No guardrail at transition On a corner, planks that don’t come in at a right angle to the support must be on the bottom and then overlapped by the planks that are at a right angle.

Example of Unstable Support Forklifts and front-end loaders are not designed by the manufacturer for such use.

Guying, Tying or Bracing If the ratio of height to base is more than 4:1, then: Install guys every 26’ above this tie point for scaffolds more than 3’ wide. Install these guys at each end of the scaffold and space additional middle guys no more than 30’ apart. If you use a cantilevered work platform (outside the framework of the scaffold), then you must use some type of bracing such as tying or outriggers to prevent the scaffold from tipping. If the height of a scaffold is more than four times the width of the base of the scaffold Including any outriggers, if used You must install guys, ties, bracing or the equivalent at the closest horizontal member: that supports both the outer and inner legs and that is nearest the point where the scaffold height is 4 times its base width – as shown in the illustration <Click> Install guys every 26’ above this tie point for scaffolds more than 3’ wide (20’ above the tie point for scaffolds 3’ wide or less) The last guy must be within the 4:1 ratio distance from the top. Install these guys at each end of the scaffold and space additional middle guys no more than 30’ apart (as measured from one end). If you use a cantilevered work platform (outside the framework of the scaffold), then you must use some type of bracing such as tying or outriggers to prevent the scaffold from tipping.

Other Scaffold Use Rules Don’t Move a scaffold when someone is on it. Work on a scaffold covered with snow or ice. Work on a scaffold during a storm or high winds. Use boxes, barrels or a ladder on top of a scaffold to increase its height. Do clean up debris on platforms before it accumulates.

Unacceptable Scaffold Example Shore or “lean to” Also, a competent person must approve the use of dissimilar metals Intermixed scaffold components must fit together without force and not effect the structural integrity of the scaffold. This is an example of a lean-to scaffold. In this picture, the workers have a shore scaffold on top of another shore scaffold. Access is unsafe both from above and below. The only thing holding this scaffold up is the DUMPSTER!

Worker Must Be Trained On: Recognizing hazards of the type of scaffold they’ll be using Understanding the procedures to control or minimize hazards How to erect, maintain and disassemble the fall protection and falling object protection systems Using the scaffold and handling materials on the scaffold Maximum intended load and capacity Other information as needed Employees need training so they don’t misuse the scaffold or do things that will cause it to lose its integrity, such as removing cross bracing so they can do their work. Training needs to be specific to the scaffold the workers will be using. Job-specific issues would include power line clearances, surface conditions.

Worker Must Be Retrained When: You believe an employee lacks the skill or understanding to safely erect, use or dismantle a scaffold If an employee's work is inadequate If there is a change in any of the following that presents new hazards: Worksite Type of scaffold Fall protection Falling object protection Other equipment

Additional Information DOSH Scaffolds Rules: WAC 296-874, Scaffolds Scaffold Accident Video – A Life-Changing Moment OSHA – Scaffolding eTool YouTube – Scaffold Safety CPWR – Scaffold Safety Hazard Alert Oregon OSHA – Supported Scaffolds in Construction Oregon OSHA – Scaffold Safety (Spanish)