Case study- 1 Developing Process of Safety Regulations

Slides:



Advertisements
Similar presentations
IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
Advertisements

Nabila E. Metwalli MD PhD 1.
1 “Environmental Auditing in the Republic of Macedonia” “Environmental Auditing in the Republic of Macedonia” State Audit Office Nada Sekulovska Gorast.
Introducing Regulatory Impact Analysis into the Turkish Legal Framework Prime Minister’s Office, Better Regulation Group The Project Implementation Team.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Nuclear and Treaty Law Section Office of Legal Affairs
INTERNATIONAL ELECTROTECHNICAL COMMISSION. established standards development process National Committees involved at each stage Technical Committees.
ROLE OF THE INTERNATIONAL MARITIME LABOUR STANDARDS FOR IMPROVEMENT OF MARITIME SAFETY AND ENHANCEMENT OF THE MARINE ENVIRONMENT PROTECTION FROM BMA’S.
Time schedule for ex ante evaluation and Strategic Environmental Assessment (SEA) Romania-Bulgaria Cross-Border Cooperation Operational Programme
South South and Triangular Cooperation Partnerships for Access to Information and Knowledge Mokhtar G. Warida.
IAEA International Atomic Energy Agency Overview of legal framework Regional Workshop - School for Drafting Regulations 3-14 November 2014 Abdelmadjid.
NEXT Lessons Learned from Integrated Regulatory Review Service (IRRS) 22 nd and 23 rd January 2014, Brussels Fernando Franco, Spanish Nuclear.
DPG HEALTH MEETING USAID CONFERENCE ROOM 6 NOVEMBER 2013 International Health Regulation (2005)
IAEA Regulatory Cooperation Forum Programme and Activities RCF Plenary 18 th September 2015 Dr. Bismark Tyobeka RCF Vice Chairman.
Legislation and Opinion Bureau On behalf of LOB Mais Khlaifat Assisstant Director/Legal Affairs Directorate Executive Privatization Commission.
The role of REGULATORY IMPACT ASSESSMENT in Technical Regulation and Standards Houston, April 2-4, 2014 THE MINISTRY OF ECONOMIC DEVELOPMENT OF THE RUSSIAN.
1 THE INTRODUCTION OF THE FIRST NPP IN TUNISIA PROJECT STATUS Jomaâ Souissi Souad Baccouche Société Tunisienne d’Electricité et du Gaz Centre National.
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
State Nuclear Regulatory Committee of Ukraine Development of Regulations Development of Regulations School for Drafting Regulations on Nuclear and Radiation.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
ACTION PLAN FOR SAFER AND MORE EFFICIENT ROAD TRANSPORT IN ARAB STATES League of Arab States Truck Accident Causation (LASTAC) Feasibility Study ACTION.
IAEA International Atomic Energy Agency School of Drafting Regulations – November 2014 Government and Regulatory Body Functions and Responsibilities IAEA.
IAEA International Atomic Energy Agency Advanced Workshop School for Drafting Regulations on Radiation Safety RER/9/096.
School for Drafting Regulations on Radiation Safety Vienna, November 2012 General definitions of the terms in licensing process Jiří Veselý, SONS, Czech.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Republic.
FAO Plant Protection Activities in the Near East Region Regional Workshop on “Strengthening Regional Cooperation and Knowledge Sharing in Plant Protection.
SC18 TG5 Development of a Guidance Document for the implementation of API Specification Q2 Objective Create a guidance document for users of the API Specification.
National Public Health Performance Standards Local Assessment Instrument Essential Service:6 Enforce Laws and Regulations that Protect Health and Ensure.
1 ◈ Egypt, Jordan, Morocco: Real willingness to benefit from the CDM opportunities Unequal capacities to address CDM issues Significant capacity development.
FNRBA CTIVITIES IN Mr. Augustin SIMO Director General, National Radiation Protection Agency of Cameroon Chairman, Forum of Nuclear Regulatory.
Purpose and objectives of the Workshop School for drafting regulations Nuclear Safety Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Bureau Regulatory Initiatives Ramona Chambus. Bureau Regulatory Initiatives Subchapter 19 – Radiologic Technology Subchapter 19 – Radiologic Technology.
Department for Nuclear and Radiation Safety of the Ministry for Emergency Situations (Gosatomnadzor) Leading specialist Diana Rusakevich Belarus Department.
IAEA International Atomic Energy Agency Arusha, Tanzania (NIGERIA) Dr Yau IDRIS 2 – 5 December 2013 RAF9038 Final Coordination Meeting.
“PREEV” PROJECT: REGULATORY PRACTICES ON AGEING AND LIFE EXTENSION (LTO) 3RD INTERNATIONAL CONFERENCE ON NPP LIFE MANAGEMENT SALT LAKE CITY (USA),
ดูแลด้วยความรับผิดชอบ
Process towards adoption of RAIS in Kenya: process and effects
Overview of Regulatory Cooperation Forum (RCF) Activities RCF Plenary
ROAD – RAIL – URBAN TRANSPORT
Nuclear and Treaty Law Section Office of Legal Affairs
Office of Legal Affairs
Serbian Radiation Protection and Nuclear Safety Agency
STRESS TESTS and TAIWAN PEER REVIEW PROCESS
Acting Section Head, Regulatory Activities Section, NSNI, IAEA
Perspective and Current Status of Introducing Nuclear Power
Radiation & Nuclear Safety and Security Aspects in Lao PDR
Nuclear and Treaty Law Section Office of Legal Affairs
FNRBA CTIVITIES IN Mr. Augustin SIMO
Arab Network for Nuclear Regulators ANNuR 6 Progress and Overview of the Agenda Daw Mosbah Arab Atomic Energy Agency Tunis
Security Enhancement: Physical Infrastructure
Overview of RCF Activities
GIFT and IBP Pilot PROJECT on PUBLIC PARTICIPATION
Communication and Consultation with Interested Parties by the RB
Safety of Radioactive Waste Management in Uzbekistan
Regulatory Cooperation Forum (RCF) - Plenary 2018
WorkGroup N 02 Countries Iran, Vietnam, Kenya, Jordan, Nigeria, South Africa, Poland and Morocco.
Arab Network for Nuclear Regulators ANNuR Abdelmajid Mahjoub Daw Mosbah Arab Atomic Energy Agency Tunis
USNRC IRRS TRAINING Lecture18
Developing of Licensing Process for NPP
Development of a Process for Conducting review & Assessment of PSAR of a NPP Group I.
Comment on post-registration and proposal
Outcome of the 42nd session of the UN Statistical Commission
Executive Order No. 23 Update Air & Waste Management Association Conference November 16, 2018 Presentation will focus on the latest policy development.
IAEA RER/9/141: Improving National Infrastructure for Safety   Regional Workshop: Drafting School for Regulations. Radiation Safety Stream Country IAEA.
IAEA RER/9/141: Improving National Infrastructure for Safety   Regional Workshop on Regulatory Enforcement and Inspection Vilnius, Lithuania 11 September.
Legal and Regulatory Framework for Radiation safety in Lithuania
FARID Abdelmounim National Centre for Radiation Protection Morocco
IAEA INITIATIVES TO SUPPORT MEMBER STATES TO ESTABLISH A NATIONAL STRATEGY FOR E&T IN RADIATION, TRANSPORT AND WASTE SAFETY ANDREA LUCIANI Division.
IAEA - Department of Nuclear Safety & Security
Presentation transcript:

Case study- 1 Developing Process of Safety Regulations Workshop on regulatory control, 6-10 November 2017, Rabat  Case study- 1 Developing Process of Safety Regulations Group 1

Countries presented in the group Ghana Iran Jordan Kenya Morocco Nigeria Tunisia

Developing Process of Safety Regulations Essential needs/Inputs/ supporting elements Major steps of the development process Timeline for the activities IAEA standards Experts (technical and legal) National legislation National guidelines and technical documentations International regulation Stackeholders Legal officers Determining the needs Between 6 months to 1 year Setting the priority 1-3 month Determining the scope Determining the resources 6 months – 1 year Colleting the information Adapt and adopt Initial drafting 3 – 6 months Review 1- 2 years Evaluation of comments 2- 3 months Establishment of regulation 1 – 3 months

Thanks