Comments on IMT-Advanced Review Process

Slides:



Advertisements
Similar presentations
ITU-R Liaison Group Report - Session #70 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /00xx Date.
Advertisements

IMT activities in ITU-R DOCUMENT #:GSC13-PLEN-13 FOR:Presentation SOURCE:ITU-R AGENDA ITEM:Plenary 6.1 CONTACT(S):Kevin Hughes Submission Date: July 1,
Proposal for IMT-Advanced Development Work Plan for m Document Number: IEEE C /030 Date Submitted: Source: Jose Puthenkulam
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
xxx July, 2007Peretz Feder IEEE MEDIA INDEPENDENT HANDOVER DCN: xxx Title: Liaison Report – Work Related to.
ITU-R Liaison Group Report - Session #62 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0072 Date.
Doc.: IEEE /0748r2 Submission May 2011 Tom Siep, CSRSlide 1 Process for Creating TGai Draft Date: Authors:
1 ITU-R Liaison Group Report - Session #72 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0006.
WP5D Meeting Results Seoul. 2 IMT-Advanced Summary  IMT.EVAL Completed  Describes the methodology for evaluating IMT Advanced  Contained in.
Proposal for TGm SDD Call for Proposal Topics Schedule Document Number: IEEE C802.16m-08/256 Date Submitted: Source: Jose Puthenkulam
ITU-R Liaison Group Report - Session #64 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127 Date.
Doc.: IEEE /1394r0 Submission November 2008 Jose Puthenkulam (Intel)Slide 1 Summary of m Development Process Date: Authors:
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #20, Montreal Closing Plenary Date Submitted: May, 2007 Presented.
1 ITU-R Liaison Group Report - Session #71 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127.
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
TGm Work Plan Adhoc Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0747r1 Date Submitted: Source:
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
TGm Work Plan Adhoc Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/1181 Date Submitted: Source:
Updates Required for the m Work Plan IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0741 Date Submitted:
Suggestion to update Work Plan for IEEE m Standard
IEEE TGv March 2010 Agenda Date: Authors: March 2010
ITU-R Ad-Hoc Contact person
Submission Title: [WG-TG3b Meeting Report Sept04]
Work Plan for IEEE m Standard & IMT-Advanced Submission
IMT-2020 Contribution Content
doc.: IEEE <doc#>
IMT-Advanced Opening Report
doc.: IEEE <doc#>
doc.: IEEE <doc#>
IEEE MEDIA INDEPENDENT HANDOVER
ITU-R Liaison Group Report - Session #62 Opening Plenary
IEEE MEDIA INDEPENDENT HANDOVER
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Nov 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing Report for TG4q (ULP) Task Group, Nov.
IEEE 802 IMT-Advanced Technology Proposal Process
Submission Title: [TGn Liaison Report] Date Submitted: [23Sept2005]
Liaison Report from Date: September 20, 2012 September 2012
February 19 November 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: RFID-SG Closing Report for.
IMT-Advanced Closing Report
<month year> doc.: IEEE < e> <September 2018>
Exit Capacity Substitution and Revision
IEEE IMT-Advanced Review Process
Submission Title: [TGn Liaison Report] Date Submitted: [17Nov2005]
Mar Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG4w March 2018 Plenary Closing Report] Date.
doc.: IEEE <doc#>
Submission Title: [Proposed project timeline]
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
<month year> doc.: IEEE ptc May 2013
March Plenary Opening Report
IEEE 802 IMT-Advanced Technology Proposal Process
May 2015 doc.: IEEE /0496r1 November 2017
Submission Title: [Task Group 1 Report] Date Submitted: [8May00]
IEEE IMT-Advanced Review Process
<month year> doc.: IEEE ptc January 2014
Submission Title: [WG-TG3b Meeting Report September05]
IMT-Advanced Opening Report
IMT-Advanced Closing Report - March 2007
May 2015 doc.: IEEE /0496r1 September 2017
IEEE 802 IMT-Advanced Technology Proposal Process
IEEE IMT-Advanced Review Process
May 2015 doc.: IEEE /0496r1 September 2017
Submission Title: [Proposed project timeline]
Task Group N Schedule March 15, 2004
March 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE b timeline] Date Submitted:
IEEE 802 IMT-Advanced Technology Proposal Process
Presentation transcript:

802.16 Comments on IMT-Advanced Review Process Month Year doc.: IEEE 802.11-yy/xxxxr0 November 2008 802.16 Comments on IMT-Advanced Review Process Date: 2008-11-11 Authors: IEEE 802.16 John Doe, Some Company

Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2008 Edits indicated to IEEE 802.18 IMT-Advanced Review Process (IEEE 802.18-08/0054r4) Date: 2008-09-11 Slide 2 John Notor, Cadence Design Systems, Inc. Page 2 John Doe, Some Company

Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2008 Background The IMT-Advanced process in ITU-R has advanced to the point where: The technical requirements (IMT.TECH) are complete and approved by Working Party 5D (WP 5D). The evaluation criteria and methodology document (IMT.EVAL) is substantially complete, and in the process of final revision, with approval expected at the October 2008 WP 5D meeting in Seoul. The Circular Letter, 5/LCCE/2, has been released, along with one addendum, inviting submission of technology proposals and participation in the evaluation process. Final approval of IMT-Advanced reports is expected at the November ITU-R SG 5 meeting. Interested IEEE 802 WG’s now need to consider how to respond to IMT-Advanced. Submit a Radio Interface Technology proposal (RIT) as a single WG. Submit a proposal for a Set of Radio Interface Technologies (SRIT) jointly with one or more other WG’s. The EC Chair has tasked 802.18 to review and recommend approval of technology proposals to the EC for submission to the ITU-R IMT-Advanced process. John Notor, Cadence Design Systems, Inc. John Doe, Some Company

IMT-Advanced Schedule September 2008 IMT-Advanced Schedule John Notor, Cadence Design Systems, Inc.

IEEE 802 Approval Process for IMT-Advanced Final Technology Proposals Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2008 IEEE 802 Approval Process for IMT-Advanced Final Technology Proposals A single Working Group (WG), or a joint WG collaboration, creates and approves a draft RIT proposal, or a draft SRIT proposal, conforming to IMT-Advanced submission requirements. The proposal is then sent to 802.18, which reviews the proposal for completeness (see slide 5) per the most recent IMT-Advanced submission requirements available at the time of submission by the WG(s). After review, 802.18 will determine by vote, requiring 75% approval, whether the proposal is considered complete per IMT-Advanced submission requirements, and either submit the approved proposal [to the EC for final approval,] or return the proposal to the WG for update with incomplete items identified. After [EC review and] approval, the IEEE SA ITU-R liaison will submit the proposal to the ITU-R with appropriate cover letter. Proposals returned to IEEE by the ITU-R as “incomplete” will be sent back to the WG(s) by the IEEE SA ITU-R liaison for correction, and the corrected proposal will be re-submitted to ITU-R per the process outlined above. Slide 5 John Notor, Cadence Design Systems, Inc. Page 5 John Doe, Some Company

ITU-R Definition of Completeness for IMT-Advanced Technology Proposals Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2008 ITU-R Definition of Completeness for IMT-Advanced Technology Proposals A “complete proposal”, as summarized from materials in the current version of IMT.REST, “Requirements, evaluation criteria and submission templates for the development of IMT-Advanced”, is defined as follows: Completed templates and other requested information. Either a self-evaluation, or the endorsement of an initial evaluation submitted by another entity, per IMT-Advanced requirements for self-evaluation. Where necessary, a statement of compliance with the ITU policy on intellectual property rights (see Annex 1 of Resolution ITU-R 1-5), as specified in the Common Patent Policy for ITUT/ITU-R/ISO/IEC available at http://www.itu.int/ITU‑T/dbase/patent/patent-policy.html. The definition of “complete” is subject to change by ITU-R. The most current versions of the requirements, evaluation criteria, and submission templates for the development of IMT‑Advanced are on the IMT-Advanced web page (http://www.itu.int/ITU-R/go/rsg5-imt-advanced/). Slide 6 John Notor, Cadence Design Systems, Inc. Page 6 John Doe, Some Company

802.18 Commitments to WGs for IMT-Advanced Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2008 802.18 Commitments to WGs for IMT-Advanced 802.18 agrees to do the following in order to expedite the approval process for WGs: Review partial submissions from WGs prior to the final cutoff date for submissions to 802.18, without a vote to formally approve or disapprove, and return comments to the WG. Approve or disapprove by vote any full submission as soon as possible after receipt by 802.18, but not later than 21[28] calendar days after 802.18 receives the submission. Agrees that failure by 802.18 to vote to approve or disapprove a full submission within 21[28] days means that the submission is approved by default. Return a submission disapproved by vote with comments to the chair of the WG within 24 hours of the vote to disapprove. Work with participating WG’s and the EC to overcome any obstacles to achieve a complete submission per ITU-R IMT-Advanced submission requirements. Report to the EC any indications that delays are occurring in the submission process which threaten successful submission of proposals to ITU-R WP 5D. Slide 7 John Notor, Cadence Design Systems, Inc. Page 7 John Doe, Some Company

Critical Milestones – 802 Business As Usual Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2008 Critical Milestones – 802 Business As Usual Last date for WG’s to submit technology proposals (final WG approved drafts) to 802.18 for review: June 18, 2009. Last date for 802.18 approval of proposals for submission to the EC: July 16, 2009. Last date for EC approval of technology proposals: July 17, 2009 (July Plenary EC meeting). Last date WP5D will accept technology proposals: October 7, 2009 (exact date may change). Slide 8 John Notor, Cadence Design Systems, Inc. Page 8 John Doe, Some Company

Recommendations to the EC to Expedite the IMT-Advanced Process Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2008 Recommendations to the EC to Expedite the IMT-Advanced Process 802.18 recognizes that the timeline shown on slide 7 impairs the ability of WGs to submit fully formed and reviewed technical proposals to the ITU-R IMT-Advanced process in a timely fashion, but we are constrained by 802 policies and practices in developing this timeline. 802.18 recommends that the EC take one of the following actions to expedite the approval process: Convene a special EC meeting on IMT-Advanced on or about October 2, 2009, to vote on any last minute submissions to ITU-R WP 5D. Alternatively, delegate the IMT-Advanced approval process to 802.18, making approval by 802.18 sufficient for WG submission to ITU-R WP 5D. 802.18 further recommends that the EC require that all WGs participating in the IMT-Advanced process attend the September 2009 Wireless Interim Session to expedite the IMT-Advanced approval process. Taking these actions will considerably reduce the lead time for WG proposals, and assure the best possible outcome for IEEE 802 (see slide 9 for the milestones, and slide 10 for a graphical view of the improvement). Slide 9 John Notor, Cadence Design Systems, Inc. Page 9 John Doe, Some Company

Critical Milestones [– Accelerated Process] Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2008 Critical Milestones [– Accelerated Process] 802.18 does not wish to impair the ability of WGs to submit fully formed and reviewed technical proposals to the ITU-R IMT-Advanced process in a timely fashion. Therefore, 802.18 recommends that the EC delegate the IMT-Advanced approval process to 802.18, making approval by 802.18 sufficient for submission to ITU-R WP 5D. If necessary, the EC could take additional action to approve proposals that could not be completed in the 802.18 process specified here. Last date for WG’s to submit technology proposals (final WG approved drafts) to 802.18 for review: September 4[2], 2009 (tentative). September 21-25: Review proposals during 802.18 session. Proposals could be revised, with the consent of the submitting WG or its delegation. Last date for 802.18 approval of proposals for submission to [the EC]ITU-R: September 25[30], 2009 (tentative). [Last date for EC approval (or, alternatively, 802.18 approval, per EC delegation) of technology proposals: October 2, 2009 (tentative).] Last date WP5D will accept technology proposals: October 7, 2009 (exact date may change). Slide 10 John Notor, Cadence Design Systems, Inc. Page 10 John Doe, Some Company

Statement of intent from WG Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2008 Statement of intent from WG In order to prepare for the work load of IMT-Advanced proposal reviews, 802.18 requires advance information regarding the intentions and work plans of participating WGs. In particular, 802.18 requires that participating WGs provide notification of their intent by January 20. The notification must include: statement of intention to submit IMT-Advanced proposal for 802.18 review intended proposal scope (for example: RIT and/or SRIT; test environments to be supported; standards or draft standards to be used as a foundation) work plan for completion of required proposal elements Slide 11 John Notor, Cadence Design Systems, Inc. Page 11 John Doe, Some Company

Contributions to February and June WP 5D Meetings Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2008 Contributions to February and June WP 5D Meetings WGs may want to provide information to WP 5D at its meetings of February and June. 802.18 will support such contributions, provided that they are clearly identified as not complete proposals per Step 3 of the IMT-Advanced process. Jan 20: WG draft contributions to February WP 5D meeting Information on intent, background, work plan, etc. Jan 22: 802.18 approval of contributions to February WP 5D meeting Feb 3: deadline for contributions to Feb WP 5D meeting May 12: WG draft contributions to June WP 5D meeting Work plan update, additional information on features, etc. May 14: 802.18 approval of contributions to June WP 5D meeting June 3: deadline for contributions to June WP 5D meeting Slide 12 John Notor, Cadence Design Systems, Inc. Page 12 John Doe, Some Company

Critical Milestones [update; delete top half] Note 1 September 2008 Critical Milestones [update; delete top half] Note 1 Document Development Nov 09 Oct 09 Sep 09 Aug 09 Jul 09 Jun 09 Document Review by 802.18 May 09 Apr 09 Mar 09 18 Jun last day to submit proposal to .18 EC Approval 17 Jul 16 Jul last .18 vote WP 5D Proposal Cutoff Date: [7 Oct] 28 calendar day lead time 2 Oct EC Ad-hoc or .18 Approval Accelerated EC Approval Process Standard EC TimeLine 30 Sep last .18 vote before EC Ad Hoc 2 Sept last day to submit proposal to .18 Note 1: All submission deadlines are “Anywhere on Earth.” This means that the deadline has not passed if, anywhere on earth, the deadline date has not yet passed. Approval deadlines are based on the formal schedules approved by 802.18 and/or the EC. Slide 13 John Notor, Cadence Design Systems, Inc.

Final Comments September 2008 Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2008 Final Comments 802.18 continues to be committed to finding ways to work, along with the EC and the proposing WGs, to expedite the IMT-Advanced technical proposal process in the most effective manner possible for IEEE 802. After the final documents describing submission details have been approved by the ITU-R SG 5, 802.18 will review the schedule to determine if it is reasonable to shorten the lead time for 802.18 review of full submissions by WGs. As part our commitment, members from 802.18 will be participating in the WP5D meeting in October 2008 in Seoul. Slide 14 John Notor, Cadence Design Systems, Inc. Page 14 John Doe, Some Company