Cornudas Capacity Summer Btu/cf Current 1,861,195 Line 2000 230,000 0 235,290 Total 2,096,485 Cornudas Capacity Winter

Slides:



Advertisements
Similar presentations
Capítulo Preliminar Los Números.
Advertisements

Un percorso realizzato da Mario Malizia
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Name of patternPrimary Base 10 Blocks PRINT IN COLOR AND ON CARD STOCK, IF POSSIBLE Suggested GradesK at the end of school; 1 st - anytime 2 nd at the.
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
Fill in missing numbers or operations
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
Worksheets.
Slide 1Fig. 20.1, p.607. Slide 2Table 20.1, p.608.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Calculate Quickly! Created by Inna Shapiro ©2008.
Addition and Subtraction Equations
Win Big AddingSubtractEven/Odd Rounding Patterns Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Last Chance.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
ALGEBRA Number Walls
Energy Day Timing Issues and Operational Concerns Pipeline Segment Wholesale Gas Quadrant North American Energy Standards Board Business Practices Subcommittee.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Welcome to Who Wants to be a Millionaire
$1 Million $500,000 $250,000 $125,000 $100,000 $70,000 $25,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
0 - 0.
1  1 =.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Summative Math Test Algebra (28%) Geometry (29%)
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
Year 6 mental test 10 second questions
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Who Wants To Be A Millionaire?
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Grade D Number - Decimals – x x x x x – (3.6 1x 5) 9.
1 Copyright Copyright 2012.
INSTALLMENT BUYING Chapter Fourteen McGraw-Hill/Irwin
Cost Allocation: Joint Products and Byproducts
INVENTORY AND OVERHEAD
ACC 3200 Chapter 3: Process Costing Process Costing.
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
1 Cash Book ( Bank Column Only ) 2006 $ $ Aug1Balance b/f 40 Aug11 G.Wong 25 Aug10 K.Chan 60 Aug23 H.Chik 45 Aug31 Balance c/f Bank Statement Aug5.
Section 3A Uses and Abuses of Percentages Reprise
PP Test Review Sections 6-1 to 6-6
1. Decisions that convert costs from variable to fixed or vice versa. 2. Decision that reduce or increase costs. 3. Decision that increase sales volume.
MCQ Chapter 07.
Multiple dependency activity on node (AoN) networks ( lecture )
Copyright © by [ All rights reserved.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Making Landmark or Friendly Numbers (Multiplication)
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
1..
Unit 2 Lesson 8 Part 1: Rounding to the Nearest Thousand Copyright © 2009 Kelly Mott.
Adding Up In Chunks.
Sets Sets © 2005 Richard A. Medeiros next Patterns.
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
25 seconds left…...
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
Subtraction: Adding UP
Equal or Not. Equal or Not
Slippery Slope
Test B, 100 Subtraction Facts
Cost Allocation: Joint Products and Byproducts
X2 TABLE: 2, 4, 6, 8, 10, 12, 14, 16, 18, , , … What pattern do you notice? Can you spot a pattern?
Number bonds to 10,
We will resume in: 25 Minutes.
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Converting a Fraction to %
Resistência dos Materiais, 5ª ed.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
Presentation transcript:

Cornudas Capacity Summer Btu/cf Current 1,861,195 Line , ,290 Total 2,096,485 Cornudas Capacity Winter Btu/cf Current 1,964,557 Line , ,290 Total2,199,847 Physical Westward Capacity* from Cornudas Adding in Line 2000 Capacity * Assumes peak period Fuel deduction of 4% through Cornudas for existing but no fuel for Line 2000 quantities

Window Rock Capacity Summer Btu/cf Current 2,314,56392,5832,273,086 Window Rock Capacity Winter Btu/cf Current 2,444,66097,7862,400,852 Physical Westward Capacity* from Window Rock * Assumes peak period Fuel deduction of 4% through Window Rock

Total Westward System Capacity Summer Btu/cf Window Rock 2,273,086 Cornudas2,096,485 4,369,571 Total Westward System Capacity Winter Btu/cf Window Rock 2,400,852 Cornudas2,199,847 4,600,699 Total Westward Capacity* With Line 2000 Allocable to Westward Shippers * Assumes peak period Fuel deduction of 4% through both of Window Rock and Cornudas of current flow and no fuel deduct on Line 2000

Total Westward Mainline Physical Capacity Summer Btu/cf 4,369,571 Total Westward Mainline Contract Capacity Summer Btu/cf 4,638,267 Qty: -268,696 Capacity Shortfall Pct: 5.8% Capacity Shortfall Allocation Pct: 94.2% Total Westward Mainline Physical Capacity Winter Btu/cf4,600,699 Total Westward Mainline Contract Capacity Winter Btu/cf4,942,596 Qty: - 341,897 Capacity Shortfall Pct: 6.9% Capacity Shortfall Allocation Pct: 93.1% Total Westward Capacity Shortfall With Line 2000 Allocable to Westward Shippers

Cornudas Only Receipt Right Contracts SummerDth/day 673,392 (a) Application of Shortfall Pct Summer x 94.2% (b) Result of Applying Shortfall % 634,382 (c) =a x b Cornudas Capacity Summer 2,096,485 (d) Summer Cornudas Capacity Available to System-wide Receipts Shippers 1,462,103 (e) = d - c Cornudas Only Receipt Right Contracts Winter Dth/day 673,392 (f) Application of Shortfall Pct Winter x 93.1% (g) Result of Applying Shortfall % 626,811 (h) = f x g Cornudas Capacity Winter 2,199,847 (i) Winter Cornudas Capacity Available to System-wide Receipts Shippers 1,573,036 (j) = i - h Physical Westward Capacity from Cornudas w/deduction of Single Basin (i.e., non San Juan) Receipt Capacities

San Juan Only (FT2) Receipt Right Contracts SummerDth/day 15,252 (a) Application of Shortfall Pct Summer x 94.2% (b) Result of Applying Shortfall % 14,368 (c) =a x b Window Rock Capacity Summer 2,273,086 (d) Summer Window Rock Capacity Available to System-wide Receipts Shippers 2,258,718 (e) = d - c San Juan Only (FT2) Receipt Right Contracts Winter Dth/day 24,825 (f) Application of Shortfall Pct Winter x 93.1% (g) Result of Applying Shortfall % 23,108 (h) = f x g Window Rock Capacity Winter 2,400,852 (i) Winter Window Rock Capacity Available to System-wide Receipts Shippers 2,377,744 (j) = i - h Physical Westward Capacity from San Juan (Window Rock) w/deduction of Single Basin (i.e., FT2) Receipt Capacities

Total Westward Mainline Physical Capacity Summer Btu/cfPct of Total Cornudas1,462, % Window Rock 2,258, % 3,720, % Total Westward Mainline Physical Capacity Winter Btu/cfPct of Total Cornudas1,573, % Window Rock 2,377, % 3,950, % Total Westward Mainline Physical Capacity With Line 2000 After Single Basin Contract Deduction

FT Shippers Minimum Basin Entitlement % (Primary Receipt Capacity % of Mainline Capacity) Shippers Summer Primary Receipt Capacity Percentage (North and South) Pct of Total Window Rock (North) 60.7 % Cornudas (South) 39.3 % 100.0% Shippers Winter Primary Receipt Capacity Percentage (North and South) Pct of Total Window Rock (North) 60.2 % Cornudas (South) 39.8 % %

~ 60% ~ 40% Total Westward Capacity Mainline Pool Pcts of Mainline Capacity With Line 2000

Allocation Methodology Applied to Hypothetical Shippers Converted FR Example Shipper 5 Year Avg. NCP Winter (Study 6a)25,000 (a) Shipper 2000 NCP Winter (Study 5a)30,000 (b) Winter Season Primary Delivery Capacity27,500 (c) = (a+b)/2 Shipper 5 Year Avg. NCP Summer (Study 6b)10,000 (d) Shipper 2000 NCP Summer (Study 5b)12,000 (e) Summer Season Primary Delivery Capacity11,000 (f) =(d+e)/2 Winter Season Primary Delivery Capacity 27,500 (c) Winter Shortfall Percentage 92.4% (g) Winter Season Mainline Capacity 25,410 (h) = (c x g) Summer Season Primary Delivery Capacity 11,000 (i) Summer Shortfall Percentage 93.1% (j) Summer Season Mainline Capacity 10,285 (k) = (i x j) Winter Season Mainline25,410 (h) Winter Season San Juan Primary Receipt % 60.2% (l) Winter Season San Juan Primary Receipt Capacity15,293 (m) =(h x l) Winter Season Cornudas Primary Receipt % 39.8% (n) Winter Season Cornudas Primary Receipt Capacity10,117 (o) = (h x n) Summer Season Mainline10,241 (k) Summer Season San Juan Primary Receipt % 60.7% (p) Summer Season San Juan Primary Receipt Capacity 6,217 (q) =(k x p) Summer Season Cornudas Primary Receipt % 39.3% (r) Summer Season Cornudas Primary Receipt Capacity 4,024 (s) = (k x r) CD Shipper Example 25,000 (a) 25,000 (b) 25,000 (c) = (a+b)/2 25,000 (d) 25,000 (e) 25,000 (f) =(d+e)/2 25,000 (c) 92.4% (g) 23,100 (h) = (c x g) 25,000 (i) 93.1% (j) 23,275 (k) = (i x j) 23,100 (h) 60.2% (l) 13,903 (m) =(h x l) 39.8% (n) 9,197 (o) = (h x n) 23,275 (k) 60.7% (p) 14,129 (q) =(k x p) 39.3% (r) 9,146 (s) = (k x r)

Reservation Charge Credit Methodology Applied to Hypothetical Shippers Converted FR Example Shipper Primary Delivery Capacity 259,455 (a) Shipper Dollars per Month Reservation Charge $2,757,888 (b) Months in Season 6 (c) Dollars in Season $ 16,547,328 (d) =(b x c) Days in Season 181 (e) Dollars per Day $ 91, (f) = (d/e) One for one unit Reservation Credit $ (g) = (f/a) Hypothetical Unprovided Qty 1,500 (h) Dollars Credited to Shipper $ (i) = (g x h) FR example is summer CD quantity for Winter Peaker CD Shipper Example 25,000 (a) $ 270,750 (b) 6 (c) $ 1,624,500 (d) =(b x c) 181 (e) $ 8, (f) = (d/e) $ (g) = (f/a) 1,500 (h) $ (i) = (g x h)