Polarized Source: Recent Activities

Slides:



Advertisements
Similar presentations
CEBAF Photoinjector: What’s new, what’s the same since HAPPEx 2004? What needs to be done? M. Poelker, HAPPEx collaboration meeting, Feb. 18, 2005.
Advertisements

Parity Quality Beam (PQB) April 07, Notes: 1.For each BPM, the wires are: +X+, +X-, +Y+, +Y- 2.There are only two injector BPMs we are not reading:
ExperimentEnergy (GeV) Pol (%) I (µA) TargetA pv (ppb) Maximum Charge Asym (ppb) Maximum Position Diff (nm) Maximum Angle Diff (nrad) Maximum Size Diff.
Electronic Cross-talk & Ground Loop Elimination in Injector Riad Suleiman Center for Injectors and Sources.
CEBAF Polarized Electron Source: Outlook & Horizon Operations Group Meeting May 13 th & 20 th, 2009 Joe Grames M. Poelker, P. Adderley, J. Clark, J. Grames,
JLab Polarized Source Happex Collaboration Meeting May 18, 2007 P. Adderley, J. Brittian, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Polarized Source Development Run Results Riad Suleiman Injector Group November 18, 2008.
Hall A Parity Workshop (May 10, 2002), 1 Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson.
/SC-PAC Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Joe Grames CEBAF Operations
12 GeV CEBAF INJECTOR Reza Kazimi Users Group Annual Meeting June 4, 2012.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
Polarized Injector Status QWeak Collaboration Meeting February 1, 2010 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman, R. Suleiman,
ExperimentEnergy (GeV) Pol (%) I (µA) TargetA pv (ppb) Maximum Charge Asym (ppb) Maximum Position Diff (nm) Maximum Angle Diff (nrad) Maximum Size Diff.
Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
DC photogun vacuum characterization through photocathode lifetime studies Marcy L. Stutzman, Philip Adderley, Joseph Grames, Matthew Poelker, Ken Surles-Law.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Lifetime Measurements.
Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
CEBAF Polarized Electron Guns Marcy L. Stutzman for the Jefferson Lab Polarized Source Group.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
TILC Electron Source Update A. Brachmann, J. Sheppard, F. Zhou -SLAC – M. Poelker - Jlab - TILC, Tsukuba, April 2009.
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
COPPER PHOTOCATHODES DEVELOPMENTS AT ASTEC R. Valizadeh Accelerator Science and Technology Centre Science & Technology Facility Council, UK.
Magnetized Beam Update (LDRD) JLEIC Collaboration Meeting March 29, 2016 Riad Suleiman and Matt Poelker.
November 17, 2008 A. Brachmann Slide 1 ILC polarized Electron Source R&D Update LCWS 2008 A. Brachmann, J. Sheppard, F. Zhou - SLAC National Accelerator.
Parity Quality Beam (PQB) B-Team Meeting September 10, 2008.
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
4 Laser Upgrade CEBAF 4 Hall Ops Joe Grames June 30, 2016 OPS Staytreat 2016 T. Allison, R. Bachimanchi, M. Bickley, W. Brinton, G. Croke, M. Diaz, L.
A bit of CEBAF polarized source history…
Polarized Injector Update
JLEIC R&D weekly meeting, Thursday Jan 26, JLab.
Parity Violation Experiments & Beam Requirements
Bubble Chamber Schedule – 2017
SUMMER 2017 SUMMER 2018 >= SUMMER 2019
Joe Grames Center for Injectors and Sources
with help from Riad Sulieman, Arne Freyberger, and Joe Grames
CEBAF Injector Update PREX/CREX March 3-4, 2017
Why are we removing our very good gun?
A Mini-Primer for Parity Quality Beam (as seen from the Accelerator)
DC Injector and Space Charge Simulation Status
G0 Backward Angle Accelerator Preparations
CEBAF Injector Overview
Tunnel Penetration Tunnel Floor Gun Little Oil Tank ISB Rack
Revised Commissioning Strategy
G0 Accelerator Planning Meeting (11/1/05)
Parity Quality Beam (PQB)
Upgraded Injector Test Facility
QWeak Collaboration Meeting
Laboratory Directed Research and Development (LDRD) Proposal
ELIC Injector Working Group High-P, high-I source issues (DC)
Summer ‘09 SAD Same good photocathode PREP and LOAD chambers
Qweak Coordination Meeting
Center for Injectors and Sources
Polarized Source Development Run Results
Upgraded Injector Test Facility
R. Suleiman and M. Poelker September 29, 2016
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
Riad Suleiman February 2, 2017
Injector Studies Using Superlattice Photocathode
Helicity Magnets for PQB Feedback Helicity Magnets for PZT Booster
A. Freyberg Aug 2016 ECT’16 =>
Uses of UITF 10 MeV spin-polarized electron accelerator, beam current up to 100 uA M. Poelker December 12, 2018.
Test of Booster at UITF Reza Kazimi (12/12/18)
PQB Meeting March 05, 2009.
Electron Gun UP (EGUP) Plan
Beam Position Noise from 500 keV MBO0I06 Dipole Sensor
Spot-Size Reduction 4/5/2017.
Injector Commissioning & Optimization
Presentation transcript:

Polarized Source: Recent Activities Fall Program 2018 Source has operated reliably, providing high polarization >85% & 4-hall ready all the time A new cathode electrode w/ shed operated well @ 130kV w/ good QE lifetime @ 50-100uA The new 350 kV HVPS (for eventual 200kV gun) operated very well, w/ high reliability New NEG BPM’s useful for PQB measurements & injector setup Winter SAD 2019 Photocathode re-activated, yielding ample QE~0.7% for Spring program. UVA installed new electro-optic polarization Pockels cell and controls to enable faster helicity reversal & capability for both HC charge & position feedback Helicity magnets re-installed, ready for testing position feedback (see Riad’s slide) Polarized Source (Jan 2019) RTP EO Cell (Jan 2019) Hall A Collaboration Meeting (J. Grames, 1/31/19)

Polarized Source & Injector 6 month Forecast Spring Program 2019 (Feb-Apr) Polarized source is ready for Spring program (recent Mott measurement => 87%) ATLIS tasks submitted for Beam Studies (characterize Pockels cell and Helicity Magnets) Spring SAD 2019 (Apr-May) Bubble Chamber Experiment engineering run planned (3 weeks) Beam based measurements of present cathode electrode for PhD thesis (1 week) Photocathode heat and reactivation before PREX run to improve QE uniformity Final PQB setup of laser & photocathode in advance of machine restoration for PREX Summer Program 2019 (Jun-Jul) Hall A PQB laser table controls (Pockels cell, IHWP, RWP, IA’s for ABC) are ready Helicity board ready for faster reversal rates (120 or 240 Hz) and Line Sync bug resolved Summer SAD 2019 (Aug-Sep) Install optimized 200kV cathode electrode and bake gun HV condition electrode to 200kV to achieve no field emission Produce 200keV beam to test chopper and explore option w/ existing SRF acceleration Return gun to 130kV for the Fall CREX run period We may deploy improved polarization maintaining seed/preamp laser oscillator Hall A Collaboration Meeting (J. Grames, 1/31/19)

CEBAF Injector Upgrade: 2020 The injector upgrade is planned to start in May 2020 and last about 6 months. The Polarized Source beamline must be rebuilt to include two 200kV Wien filters upstream of the prebuncher and new PSS kicker magnet. It may also include improved magnets and NEG coated vacuum chambers and beam pipes. The Booster beamline must be rebuilt to include the new SRF booster module (replaces capture + existing ¼ cryounit) and retain injector PSS segmentation. It may also include improved magnets and diagnostics. Weekly meetings with ME have begun, to sort and establish a baseline design for purposes of simulations, designing components and developing a commissioning plan and schedule. Polarized Source Beamline Booster beamline Hall A Collaboration Meeting (J. Grames, 1/31/19)