Involuntary Resettlement 0P 4.12 Principles and Objectives

Slides:



Advertisements
Similar presentations
Training Workshop for Financial Intermediaries and Implementing Agencies Kiev, May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World.
Advertisements

Training Workshop for Financial Intermediaries and Implementing Agencies May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World Bank.
INVOLUNTARY RESETTLEMENT Radhika Srinivasan, ECSSD
Presentation by Cambodian Participants Phuket, Thailand February 2012 Health Impact Assessment Royal Government of Cambodia.
Lessons from Inspection Panel cases Alf Jerve, Panel Member October 9, 2013 The Inspection Panel Indigenous Peoples’ Lands and Development:
Climate Change Mitigation - The role of Financial Institutions
Involuntary Resettlement 0P 4.12 Principles and Objectives.
Introduction to World Bank Safeguard Policies and Project Preparation
Involuntary Resettlement 0P 4.12: Financial Intermediaries and Resettlement Planning Instruments.
Planning for Resettlement 0P 4.12 Instruments. Resettlement and Development No mitigation: Those losing land must make a sacrifice for national development.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies Johnson Appavoo Operations Analyst WB Safeguards.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies.
Strengthening and Use of Country Safeguard Systems 2008 AECEN Forum Bali, Indonesia Strengthening and Use of Country Safeguard Systems 2008 AECEN Forum.
Environmental Impact Assessment (EIA): Overview
BioCarbon Fund Projects and World Bank Safeguard Policies Jean-Roger Mercier September 12, 2005.
TRAINING ON WORLD BANK SAFEGUARD POLICIES Agi Kiss, Regional Safeguards Coordinator, Europe and Central Asia Tashkent, November 2013 Introduction and Overview.
Review and Update of IFC Policy and Performance Standards on Social and Environmental Sustainability and Disclosure Policy Background and Overview October.
Union SME Financing – Is it Really a …. ?. SME Definition (SBP) Type of Business a) Fixed Assets Excluding Land & Building (Rs.M) b) Employment.
Performance Standards John Butler WB Safeguards Training Workshop November, 2013.
LARGE SCALE INFRASTRUCTURE DEVELOPMENT AND LAND RIGHTS IN SOUTH SUDAN “2014 WORLD BANK CONFERENCE ON LAND AND POVERTY ” Washington DC, March 23-27, 2015.
Involuntary Resettlement 0P 4.12: Planning Instruments WB Safeguards Training Workshop Tbilisi, May 2013.
Module 23 Environmental Safeguards Accreditation Training, January 21 – 25, 2013 Public Consultation.
UNEP Training Resource ManualTopic 7 Slide 1 The purpose of mitigation is to: F find better ways of doing things F enhance environmental and social benefits.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
Safeguard Training Workshop Zagreb, Croatia May 7, 2009 Ruxandra Floroiu (Environmental Engineer)
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
Making the Grade: a survey of IFI social policies and the policies of the European Investment Bank (EIB) Tom Griffiths Forest Peoples Programme Rights.
BioCarbon Fund Projects and World Bank Safeguards Jean-Roger Mercier July 11, 2005.
Involuntary Resettlement OPERATIONAL POLICY 0P 4.12 Resettlement Instruments Afshan Khawaja, OPCQC Zagreb, May 2009.
Financial Intermediary Lending World Bank Safeguards Workshop May 2013.
Land Acquisition and Resettlement: Investment Risks.
Mitigation and Impact management
CR TOOLKIT WORKSHOP MANAGEMENT TOOLKIT - RESETTLEMENT PLANNING Ref – ICMM CD TOOLKIT # 18 - Trainer: Martin Paining Date: 28 th of November, 2013.
Involuntary Resettlement 0P 4.12 Principles and Objectives WB Safeguards Training Workshop Tbilisi, May 2013.
1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012.
INTRODUCTION: World Bank Environmental and Social Safeguard Policies Training Workshop for Financial Intermediaries and Implementing Agencies May-June,
Georgian Legislation on Involuntary Land Acquisition and Resettlement and WB OP 4.12 Tbilisi, May 2013 Klavdiya Maksymenko.
UNEP EIA Training Resource ManualTopic 14Slide 1 What is SEA? F systematic, transparent process F instrument for decision-making F addresses environmental.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies Presenter: Johnson Appavoo Presentation prepared.
Module Land Acquisition and Resettlement Best Practices and Safeguards. Overall Safeguards presentation Jayantha Perera, PhD 1.
NATIONAL REDD+ SECRETARIAT Zonal Level REDD+ Awareness Creation Workshop MINISTRY OF ENVIRONMENT AND FOREST Tigray Regional State, Mekele September 3 &
Wednesday, January 11, 2017 Washington Area Branch – IAIA
Involuntary Resettlement
Resettlement planning and implementation
Using Involuntary Resettlement on Highway Project to Alleviate Poverty: A Case Study from Hubei Shiman Highway Project, China Zhefu Liu
Involuntary Resettlement 0P 4.12 Principles and Objectives
Stakeholder consultations
Consultation on the Finance Sector Supplement to the Natural Capital Protocol This project has been made possible by generous funding and support from.
Caleb Stevens & Chad Dear E3/Land May 26, 2016
GCF’s Environmental and Social Safeguards
NATIONAL REDD+ SECRETARIAT
“The Link” - Continuity of Operations and Emergency Management
Involuntary Resettlement Resettlement Instruments
AGE Annual Conference 2018, 6 June Brussels, Belgium
Selected Project Covenants (1)
ADB Safeguard Policy Statement (2009)
Compliance Policy & Procedures
Involuntary Resettlement 0P 4.12: Planning Instruments
GIZ-SIDBI Responsible Enterprise Finance Programme
Ensuring Environmental and social safeguards
ECA Safeguards Training Workshop
Ensuring Environmental and social safeguards
Relationship between World Bank and Romanian EA requirements
Dr. Abhash Panda Social Safeguards Specialist (October 28, 2016)
World Bank project example
Environment Safeguards
Environment Safeguards
Social Safeguards “Procedures and approaches that can help to ensure that “do no harm” to people or the environment, but rather enhance social and environmental.
Social Safeguards “Procedures and approaches that can help to ensure that “do no harm” to people or the environment, but rather enhance social and environmental.
Project financing by mainstreaming Environmental and social issues in urban planning September 4, 2018 Frank Wildschut, Arcadis.
Presentation transcript:

Involuntary Resettlement 0P 4.12 Principles and Objectives

A Resettlement Overview Why does the Bank have an Involuntary Resettlement Policy? How has the Bank’s policy evolved? What are policy objectives and key principles What is role of Financial Intermediaries?

An Evolving Resettlement History No mitigation: Those losing land must make a sacrifice for national development Eminent domain: compensation for assets favors relatively well-to-do. Risks of impoverishment: Recognizing interests of poor and vulnerable, too Resettlement can be a development opportunity: Extending the reach of project benefits

Key Policy Objectives Avoid, minimize, or otherwise mitigate land acquisition and associated adverse impacts Assist all affected people to improve, or at least restore, incomes and living standards Resettlement as a development opportunity for households and community infrastructure (Mitigating risks for affected people helps minimize risks to borrower and Bank, too)

Key Planning Principles The Bank requires the borrower to prepare and implement a plan to identify, minimize or mitigate adverse impacts. Implementers and affected people should be involved in planning process Plan scope of coverage includes all contemporaneous impacts essential to functioning of Bank-supported project Bank acceptance of plan required at appraisal (or prior to subproject approval in FI projects)

Key Guiding Principles All affected persons should be compensated or assisted in other ways, regardless of legal status Compensation for all assets at replacement cost (enough to obtain assets of equivalent value) Income restoration may require supportive measures in addition to compensation for assets Affected persons should be involved in resettlement planning and implementation Consultation Information Disclosure Grievance Procedure

Role of Financial Intermediaries Prepare and agree a Resettlement Policy Framework with the Bank Screen all proposed on-lending activities for land acquisition and associated resettlement impacts If RPF deemed unnecessary, legal documents require compliance if impacts should arise For all subprojects involving relevant impacts, Bank approval of a resettlement plan required before accepted for financing

Recurring Issues and Problems Defining project scope: “Indirect impacts” and “linkage” in application of Bank policy Bridging the eligibility gap: Assisting vulnerable people and those who lack full legal recognition Covering all costs: ‘Replacement cost’ valuation, transaction costs and transitional support Asset stock versus income flow: Going beyond compensation to income restoration and incorporation of development opportunities In FI projects, ensuring coordination with subclients in implementation and reporting